Attachment 3 - Specifications Vol. 1.pdf

PDF 4 MB Posted

Attached to
Z2DA--Renovate BLDG. 10 for CLC | Doris Miller VAMC
Solicitation number
36C25725R0062
Issued by

About this file

This document is a comprehensive technical specification for a renovation project at the Doris Miller VA Medical Center in Waco, Texas. The project involves renovating Building 10 for a Community Living Center (CLC), with an estimated scope including removal of approximately 980 SF of non-ACM carpet, 3,300 SF of ACM floor tile and mastic, and 10 linear feet of ACM pipe insulation. The renovation will require specialized asbestos abatement using Class I negative pressure enclosure methods, with detailed requirements for worker safety, containment, removal procedures, and disposal.

The specification provides extensive technical details across multiple divisions, including structural steel framing (Section 05 12 00), masonry work, concrete placement, and specific requirements for demolition, environmental controls, and safety protocols. Key technical components include structural steel specifications, concrete mix designs, masonry unit requirements, and precise installation guidelines. The project involves complex demolition and renovation work within an active medical facility, with stringent safety, infection control, and environmental protection measures. The specification indicates a comprehensive approach to renovation that prioritizes patient safety, structural integrity, and adherence to federal construction and healthcare facility standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DORIS MILLER VAMC

WACO, TX 76711

PROJECT NO. 674A4-21-105

RENOVATE BLDG. 10 for CLC

CONSTRUCTION DOCUMENTS - 100%

VOLUME ONE

SPECIFICATIONS TABLE OF CONTENTS

Prepared for:

Prepared by:

AUGUST 2022

A SPECIFICATIONS

PROJECT NO. 6

Prepared for:

XAS

TFO E

N

E

IG

NNCE S

E

DE

AN L

R E

TA

ET

S

I

I

L

SS

E

R F

O P

O

89190

DANTE ANGELINI

08.23.22

19-AUG-22

PROJECT #674A4-21-105

11-01-21

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21 01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 35 26 Safety Requirements 11-21 01 42 19 Reference Standards 11-20 01 45 29 Testing Laboratory Services 11-18 01 57 19 Temporary Environmental Controls 01-21 01 74 19 Construction Waste Management 11-21 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17 04 72 00 Cast Stone Masonry 01-21

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 21 00 Steel Joist Framing 11-18 05 31 00 Steel Decking 01-21 05 36 00 Composite Metal Decking 01-21 05 40 00 Cold-Formed Metal Framing 01-21 05 51 00 Metal Stairs 01-21

00 01 10-2

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 14 00 Fluid-Applied Membrane Waterproofing 06-20 07 21 13 Thermal Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 01-21 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 72 00 Roof Accessories 01-21 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 17 10 Integrated Door Assemblies 01-21 08 31 13 Access Doors and Frames 01-21 08 41 13 Aluminum-Framed Entrances and Storefronts 01-21 08 51 13 Aluminum Windows 01-21 08 71 00 Door Hardware 01-21 08 71 13 Automatic Door Operators 01-21 08 71 13.11 Low Energy Power Assist Door Operators 01-21 08 80 00 Glazing 01-21 08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 19 Resilient Tile Flooring 05-18 09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21 10 21 13 Toilet Compartments 01-21 10 26 00 Wall and Door Protection 01-21 10 28 00 Toilet, Bath, and Laundry Accessories 01-21

00 01 10-3

10 44 13 Fire Extinguisher Cabinets 08-18 10 51 13 Metal Lockers 06-14

DIVISION 11 – EQUIPMENT

11 73 00 Ceiling Mounted Patient Lift System 08-20

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades 08-17 12 32 00 Manufactured Wood Casework 01-21 12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED

DIVISION 14– CONVEYING EQUIPMENT – NOT USED

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression Systems 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 29 Sump Pumps 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-20 22 35 00 Domestic Water Heat Exchanges 09-20 22 40 00 Plumbing Fixtures 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20 23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment 02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

00 01 10-4

23 08 00 Commissioning of HVAC Systems 02-20 23 09 23 Direct-Digital Control System for HVAC 08-20 23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20

DIVISION 25 – INTEGRATED AUTOMATION - NOT USED

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 39 Underfloor Raceways for Electrical Systems 01-18 26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 01-18 26 22 00 Low-Voltage Transformers 01-18 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 32 13 Engine Generator 01-18 26 36 23 Automatic Transfer Switches 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18 26 56 00 Exterior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Telecommunications Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 52 23 Nurse Call and Code Blue System 10-18

00 01 10-5

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and

Security 10-18

28 05 26 Grounding and Bonding for Electronic Safety and Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16 31 23 23.33 Flowable Fill 10-12 31 63 29 Drilled Concrete Piers and Shafts 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 31 13 Chain Link Fences and Gates 05-18 32 90 00 Planting 07-16

DIVISION 33 – UTILITIES

33 08 00 Commissioning of Site Utility Systems 11-16 33 10 00 Water Utilities 03-17 33 30 00 Sanitary Sewer Utilities 06-13 33 40 00 Storm Sewer Utilities 12-17 33 46 13 Foundation Drainage 10-11 33 51 00 Natural-Gas Distribution 10-11

DIVISION 34 – TRANSPORTATION - NOT USED

DIVISION 48 – Electrical Power Generation – NOT USED

DORIS MILLER VAMC

09-01-18

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

GI-001 COVER SHEET

GI-002 INDEX OF DRAWINGS

GI-003 GENERAL NOTES

GI-004 BASEMENT PLAN DEDUCT ALTERNATE 1

GI-005 SECOND FLOOR PLAN DEDUCT ALTERNATE 2

LANDSCAPE

LS-001 ENLARGED LANDSCAPE PLAN

STRUCTURAL

S000 STRUCTURAL NOTES

S001 STRUCTURAL NOTES

S002 STRUCTURAL NOTES

S100 FOUNDATION PLAN

S101 FIRST FLOOR FRAMING PLAN

S102 SECOND FLOOR FRAMING PLAN

S103 ROOF FRAMING PLAN

S300 TYPICAL CONCRETE DETAILS

S301 TYPICAL VOIDED SLAB DETAILS

S302 TYPICAL VOIDED SLAB DETAILS

S303 FOUNDATION DETAILS

S400 TYPICAL CMU DETAILS

S401 TYPICAL CMU DETAILS

S501 TYPICAL STEEL CONNECTIONS

S510 FRAMING DETAILS

ARCHITECTURAL

AI-100 SUB-BASEMENT LIFE SAFETY PLAN

AI-101 BASEMENT LIFE SAFETY PLAN

AI-102 FIRST FLOOR LIFE SAFETY PLAN

DORIS MILLER VAMC

00 01 15 - 2

AI-103 SECOND FLOOR LIFE SAFETY PLAN

AI-104 ATTIC LIFE SAFETY PLAN

AD-001 SITE DEMOLITION PLAN

AD-100 SUB-BASEMENT DEMOLITION PLAN

AD-101 BASEMENT DEMOLITION PLAN

AD-102 FIRST FLOOR DEMOLITION PLAN

AD-103 SECOND FLOOR DEMOLITION PLAN

AD-104 ATTIC DEMOLITION PLAN

AS-001 PROJECT SITE PLAN

AS-002 ENLARGED SITE PLAN

AS-100 SUB-BASEMENT PLAN

AS-101 BASEMENT PLAN

AS-102 FIRST FLOOR PLAN

AS-103 SECOND FLOOR PLAN

AS-104 ATTIC PLAN

AS-105 ROOF PLAN

AS-110 BASEMENT DIMENSION PLAN

AS-111 FIRST FLOOR DIMENSION PLAN

AS-112 SECOND FLOOR DIMENSION PLAN

AS-120 BASEMENT FINISH PLAN

AS-121 FIRST FLOOR FINISH PLAN

AS-122 SECOND FLOOR FINISH PLAN

AS-130 BASEMENT REFLECTED CEILING PLAN

AS-131 FIRST FLOOR REFLECTED CEILING PLAN

AS-132 SECOND FLOOR REFLECTED CEILING PLAN

AS-200 BUILDING SECTIONS

AS-201 BUILDING SECTIONS

AS-202 BUILDING SECTIONS

AS-203 BUILDING SECTIONS

AS-204 BUILDING ELEVATIONS

AS-205 BUILDING ELEVATIONS

AS-206 BUILDING ELEVATIONS

AS-207 BUILDING ELEVATIONS

AS-300 WALL SECTIONS

AS-301 EXTERIOR STAIRWELL PLANS

AS-302 EXTERIOR STAIRWELL SECTIONS

AS-400 ENLARGED FLOOR PLANS

AS-401 ENLARGED FLOOR PLANS

AS-500 INTERIOR ELEVATIONS

DORIS MILLER VAMC

00 01 15 - 3

AS-501 INTERIOR ELEVATIONS

AS-502 INTERIOR ELEVATIONS

AS-503 INTERIOR ELEVATIONS

AS-504 CASEWORK DETAILS

AS-505 CEILING DETAILS

AS-506 FLOOR FINISH DETAILS

AS-510 WALL TYPES

AS-511 ARCHITECTURAL DETAILS

AS-512 ARCHITECTURAL DETAILS

AS-600 DOOR & WINDOW SCHEDULES / DOOR & WINDOW TYPES

AS-610 DOOR, FRAME AND WINDOW TYPES

AS-620 DOOR DETAILS

AS-621 SIGNAGE SHEET

AS-630 ROOM FINISH / MATERIAL FINISH SCHEDULES

FIRE PROTECTION

FP-100 FIRE PROTECTION SUB-BASEMENT PLAN

FP-110 FIRE PROTECTION BASEMENT PLAN

FP-111 FIRE PROTECTION FIRST FLOOR PLAN

FP-112 FIRE PROTECTION SECOND FLOOR PLAN

FP-113 FIRE PROTECTION PENTHOUSE PLAN

FP-501 FIRE PROTECTION DETAILS

FPD-100 DEMOLITION FIRE PROTECTION SUB-BASEMENT PLAN

PLUMBING

PL-000 PLUMBING SYMBOLS & ABBREVIATIONS

PL-100 PLUMBING SUB-BASEMENT PLAN

PL-110 PLUMBING BASEMENT PLAN

PL-111 PLUMBING FIRST FLOOR PLAN

PL-112 PLUMBING SECOND FLOOR PLAN

PL-113 PLUMBING PENTHOUSE PLAN

PL-201 PLUMBING ENLARGED PLANS

PL-202 PLUMBING ENLARGED PLANS

PL-203 PLUMBING ENLARGED PLANS

PL-301 PLUMBING SCHEDULES

PL-401 PLUMBING RISERS

PL-501 PLUMBING DETAILS

PL-502 PLUMBING DETAILS

DORIS MILLER VAMC

00 01 15 - 4

MECHANICAL

MH-000 MECHANICAL SYMBOLS & ABBREVIATIONS

MH-110 MECHANICAL BASEMENT FLOOR PLAN

MH-111 MECHANICAL FIRST FLOOR PLAN

MH-112 MECHANICAL SECOND FLOOR PLAN

MH-113 MECHANICAL PENTHOUSE PLAN

MH-120 MECHANICAL SUB BASEMENT HYDRONIC FLOOR PLAN

MH-121 MECHANICAL BASEMENT HYDRONIC FLOOR PLAN

MH-122 MECHANICAL FIRST FLOOR HYDRONIC PLAN

MH-123 MECHANICAL SECOND HYDRONIC FLOOR PLAN

MH-201 MECHANICAL ENLARGED PLANS

MH-202 HYDRONIC ENLARGED PLANS

MH-301 MECHANICAL SCHEDULES

MH-302 MECHANICAL SCHEDULES

MH-401 CONTROLS

MH-402 CONTROLS

MH-501 MECHANICAL DETAILS

MH-502 MECHANICAL DETAILS

MH-503 MECHANICAL DETAILS

MH-504 MECHANICAL DETAILS

MH-505 MECHANICAL DETAILS

ELECTRICAL

EJ-000 ELECTRICAL SYMBOLS & ABBREVIATIONS

EJ-001 GENERAL NOTES

ED-001 ELECTRICAL STIE DEMOLITION PLAN

ED-210 ELECTRICAL BASEMENT DEMO PLAN

ED-401 ELECTRICAL ONE LINE DIAGRAM – DEMO

EK001 ELECTRICAL PANEL SCHEDULE NORMAL POWER BASEMENT

EK002 ELECTRICAL PANEL SCHEDULES NORMAL POWER LEVEL 1

AND 2

EK003 ELECTRICAL PANEL SCHEDULES EQUIPMENT BRANCH

EK004 ELECTRICAL PANEL SCHEDULES CRITICAL BRANCH

EK005 ELECTRICAL PANEL SCHEDULES

EK006 ELECTRICAL DETAILS

EL-110 LIGHTING BASEMENT FLOOR PLAN

EL-111 LIGHTING FIRST FLOOR PLAN

EL-112 LIGHTING SECOND FLOOR PLAN

EL-113 LIGHTING FIXTURE SCHEDULE

DORIS MILLER VAMC

00 01 15 - 5

EL-114 LIGHTING PENTHOUSE FLOOR PLAN

EP-201 POWER SUB-BASEMENT FLOOR PLAN

EP-210 POWER BASEMENT FLOOR PLAN

EP-210M POWER MECHANICAL BASEMENT FLOOR PLAN

EP-211 POWER FIRST FLOOR PLAN

EP-211M POWER MECHANICAL FIRST FLOOR PLAN

EP-212 POWER SECOND FLOOR PLAN

EP-212M POWER MECHANICAL SECOND FLOOR PLAN

EP-213M POWER MECHANICAL PENTHOUSE PLAN

EP-220 POWER BASEMENT ENLARGED PLANS

EP-401 ELECTRICAL NORMAL AND OPTIONAL STANDBY ONE-LINE

DIAGRAM

EP-402 ELECTRICAL CRITICAL AND LIFE SAFETY ONE LINE

DIAGRAM

EP-403 GROUNDING ONE-LINE DIAGRAM

ES-001 ELECTRICAL SITE NEW WORK PLAN LIGHTING

FIXTURE SCHEDULE

EY-310 SPECIAL SYSTEMS BASEMENT FLOOR PLAN

EY-311 SPECIAL SYSTEMS FIRST FLOOR PLAN

EY-312 SPECIAL SYSTEMS SECOND FLOOR PLAN

TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS GENERAL INFORMATION

T-002 TECHNOLOGY INFORMATION MATRIX

TN-200-10-B TECHNOLOGY FLOOR PLAN BLDG. 10 – BASEMENT

TN-201-10-1 TECHNOLOGY FLOOR PLAN BLDG. 10 – FIRST FLOOR

TN-202-10-2 TECHNOLOGY FLOOR PLAN BLDG. 10 – SECOND FLOOR

TN-210-10-B TECHNOLOGY - BASEMENT REFLECTED CEILING PLAN

TN-211-10-1 TECHNOLOGY - FIRST REFLECTED CEILING PLAN

TN-212-10-2 TECHNOLOGY - SECOND REFLECTED CEILING PLAN

TN-200-10-B NURSE CALL FLOOR PLAN BLDG. 10 – BASEMENT

TN-221-10-1 NURSE CALL FLOOR PLAN BLDG. 10 – FIRST FLOOR

TN-222-10-2 NURSE CALL FLOOR PLAN BLDG. 10 – SECOND FLOOR

TN-400-10-B TECHNOLOGY TELECOM ROOM PLAN BLDG. 10 - BASEMENT

TN-500 TECHNOLOGY DETAILS

TN-501 TECHNOLOGY DETAILS

TN-502 GROUNDING AND BONDING DETAILS

TN-503 NURSE CALL – TYPICAL DETAILS

TN-600 TECHNOLOGY RISER DIAGRAM

DORIS MILLER VAMC

00 01 15 - 6

TN-601 GROUNDING AND BONDING - RISER DIAGRAM

- - - END - - -

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall provide all labor, material, tools, equipment and supervision necessary to perform work to Renovate Building 10 for CLC, Project Number 674A-21-105 in accordance with the project contract documents and meet all applicable code requirements. All work shall be accomplished in a manner to minimize the impact of patient care and hospital operations. Contractor shall follow all station Infection

Control Construction Risk Assessment (ICRA) requirements, Construction

Risk Assessment (CRA) requirements and Interim Life Safety Measure

(ILSM) requirements. ICRA, CRA and ILSM shall be posted at the entrance of the construction area at all times.

B. One Pre-Proposal Site Visit will be scheduled for Offerors to come and inspect the project area(s). All Pre-Proposal question need to be sent to the Contracting Officer by the deadline established by the

Contracting Officer for response.

C. The office of COX DESIGN ASSOCIATES will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by

Contracting Officer or his duly authorized representative.

D. Testing laboratory shall be retained by contractor. Prior to start of work, provide Testing laboratory information for review and acceptance by the designated COR.

E. All employees of general contractor and subcontractors shall comply with VA security requirements. All employees are required to wear a

Contractors ID at all times while on station. ID must be worn above the waist. Superintendent is required to have 30-hour OSHA training.

All other employees and sub-contractors are required to have 10-hour

OSHA training. Contractor IDs are issued by the Engineering or

RENOVATE BLDG. 10 for CLC

01 00 00 -2

Security Police Office once a valid picture ID and OSHA training is provided.

1.3 STATEMENT OF BID ITEM(S)

A. BASE BID, provide all work necessary to Renovate Building 10 for CLC.

The Work includes general construction, alterations, walks, grading, drainage, associated components, assemblies, emergency power, communication and data systems both internal and extended to other buildings on the campus, necessary removal of existing building assemblies, construction of other items, and functional requirements as described and depicted in the specifications and on the drawings for the Work. The Work, including but not limited to the items listed above, shall be in accordance with VA specifications and standards.

B. DEDUCT ALTERNATE 1: This Alternate is to delete the Project work called out on Sheet GI-004. Delete the interior architectural finish out and utility systems for this designated portion of the Basement Plan.

C. DEDUCT ALTERNATE 2: This Alternate is to delete the Project work called out on Sheet GI-005. Delete the interior finish out and utility systems for the designated portion of the Second Floor Plan.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense. Both drawing and specification are intended to be utilized as one complete document. The Contractor is responsible for providing a complete document to each sub-contractor to ensure all the necessary project information is reviewed and understood.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

RENOVATE BLDG. 10 for CLC

01 00 00 -3

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting Officers Representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent keying. VA will return cylinders to the General Contractor for permanent installation. See Section 08

71 00, DOOR HARDWARE and coordinate.

E. Motor Vehicle Restrictions

1. All contractor vehicles (prime contractor and sub-contractor) shall be parked within the project designated laydown area or parked off station. Deliveries shall not block traffic flow on station.

Deliveries shall be scheduled accordingly. Coordinate with COR.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

RENOVATE BLDG. 10 for CLC

01 00 00 -4

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor within the contractor’s laydown area only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. Only with the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways. When materials are transported in executing the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workmen are subject to rules of Medical Center applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

RENOVATE BLDG. 10 for CLC

01 00 00 -5

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center and associated building areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, plan to provide continued water tightness during construction and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to

COR and Contractor.

RENOVATE BLDG. 10 for CLC

01 00 00 -6

I. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

II.

RENOVATE BLDG. 10 for CLC

01 00 00 -7

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan and the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 14 days in advance of proposed interruption. The request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, RENOVATE BLDG. 10 for CLC

01 00 00 -8 payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged-in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by the Contracting Officer. This report shall list by rooms and spaces:

1. Shall note any discrepancies between drawings and existing conditions at site.

2. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur, and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR to be in such condition that their use is

RENOVATE BLDG. 10 for CLC

01 00 00 -9 impossible or impractical, shall be furnished and/or replaced by

Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE

CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR

852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

CI. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled, and equipment moved and/or relocated.

a. All points of exit access from the building must be protected from construction above.

b. Pedestrian walkways within a ten-foot (10’) proximity to the building and construction above must be protected.

RENOVATE BLDG. 10 for CLC

01 00 00 -10

3. Protection of interior existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items were directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall

RENOVATE BLDG. 10 for CLC

01 00 00 -11 trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

C. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

RENOVATE BLDG. 10 for CLC

01 00 00 -12

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.11 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and benchmarks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.

If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(FAR 52.236-17)

B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper

RENOVATE BLDG. 10 for CLC

01 00 00 -13 alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings.

Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall also furnish to the COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.

1. Lines of each building and/or addition.

2. Elevations of tops of floors of each building and/or addition.

3. Lines and elevations of sewers and of all outside distribution systems.

E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.

F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of

Article "Professional Surveying Services".

1.12 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

RENOVATE BLDG. 10 for CLC

01 00 00 -14

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR’s review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.13 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed, and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

1.14 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems: transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014

Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again

RENOVATE BLDG. 10 for CLC

01 00 00 -15 immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

Boilers, pumps, feedwater heaters and auxiliary equipment must be operated as a complete system and be fully maintained by operating personnel. Boiler water must be given complete and continuous chemical treatment.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.15 TEMPORARY USE OF EXISTING ELEVATORS

A. Contractor will not be allowed the use of existing elevators. Outside type hoist shall be used by Contractor for transporting materials and equipment.

1.16 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations with suitable sewer and water

RENOVATE BLDG. 10 for CLC

01 00 00 -16 connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.

1.17 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:

1. Obtain heat by connecting to Medical Center heating distribution system.

E. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.

F. Water (for Construction and Testing): Furnish temporary water service.

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the

Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes

RENOVATE BLDG. 10 for CLC

01 00 00 -17 will be cause for revocation (at COR’s discretion) of use of water from Medical Center's system.

1.18 NEW TELEPHONE EQUIPMENT

The contractor shall coordinate with the work of installation of telephone equipment by others. This work shall be completed before the building is turned over to VA.

1.19 TESTS

A. As per specification section 23 05 93 the contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.

B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.

C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer.

Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.

D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions

RENOVATE BLDG. 10 for CLC

01 00 00 -18 for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.

E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.

F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.

1.20 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system

RENOVATE BLDG. 10 for CLC

01 00 00 -19 being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.

C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned

Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed.

This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.

1.21 GOVERNMENT-FURNISHED PROPERTY

A. The Government shall deliver to the Contractor, the

Government-furnished property shown on the Schedule and/or Drawings.

B. Equipment furnished by Government to be installed by Contractor will be furnished to Contractor at the Medical Center.

C. Storage space for equipment will be provided by the Contractor, and the

Contractor shall be prepared to unload and store such equipment therein upon its receipt at the Medical Center.

D.

This is the start of the file's text. The full file is on GovTribe.