Attachment 2 - Drawings.pdf

PDF 47 MB Posted

Attached to
Z2DA--Renovate BLDG. 10 for CLC | Doris Miller VAMC
Solicitation number
36C25725R0062
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

BI

M

W

AC

O

R

EN

O

VA

TE

B

LD

G

FO

R

C

LC

/W

AC

O B

U

IL

D

IN

G

C

LC

.rv t 8/

/2

:1

6:

A M

GI-001

CONSTRUCTION

DOCUMENTS - 100%

COVER SHEET RENOVATE BLDG 10 FOR

CLC

4800 MEMORIAL DRIVE

RHC RJP

674A4-21-105

08/19/2022

DORIS MILLER VA MEDICAL CENTER

4800 MEMORIAL DRIVE

WACO, TX 76711

RENOVATE BLDG. 10 FOR CLC

PROJECT # 674A4-21-105

SEALED CONSTRUCTION DOCUMENTS - 100%

BUILDING IS

FULLY

SPRINKLERED

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

BI

M

W

AC

O

R

EN

O

VA

TE

B

LD

G

FO

R

C

LC

/W

AC

O B

U

IL

D

IN

G

C

LC

.rv t 8/

/2

:1

6:

A M

GI-002

CONSTRUCTION

DOCUMENTS - 100%

INDEX OF DRAWINGS RENOVATE BLDG 10 FOR

CLC

4800 MEMORIAL DRIVE

RHC RJP

674A4-21-105

08/19/2022

TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS GENERAL INFORMATION

T-002 TECHNOLOGY INFORMATION MATRIX

TN-200-10-B TECHNOLOGY FLOOR PLAN BLDG. 10 - BASEMENT

TN-201-10-1 TECHNOLOGY FLOOR PLAN BLDG. 10 - FIRST FLOOR

TN-202-10-2 TECHNOLOGY FLOOR PLAN BLDG. 10 - SECOND FLOOR FLOOR

TN-210-10-B TECHNOLOGY - BASEMENT REFLECTED CEILING PLAN

TN-211-10-1 TECHNOLOGY - FIRST REFLECTED CEILING PLAN

TN-212-10-2 TECHNOLOGY - SECOND FL. REFLECTED CEILING PLAN

TN-220-10-B NURSE CALL FLOOR PLAN BLDG. 10 - BASEMENT

TN-221-10-1 NURSE CALL FLOOR PLAN BLDG. 10 - FIRST FLOOR

TN-222-10-2 NURSE CALL FLOOR PLAN BLDG. 10 - SECOND FLOOR

TN-400-10-B TECHNOLOGY TELECOM ROOM PLAN BLDG. 10 - BASEMENT

TN-500 TECHNOLOGY DETAILS

TN-501 TECHNOLOGY DETAILS

TN-502 GROUNDING AND BONDING DETAILS

TN-503 NURSE CALL - TYPICAL DETAILS

TN-600 TECHNOLOGY RISER DIAGRAM

TN-601 GROUNDING AND BONDING RISER DIAGRAM

ELECTRICAL

EJ-000 ELECTRICAL SYMBOLS & ABBREVIATIONS

EJ-001 GENERAL NOTES

EK001 ELECTRICAL PANEL SCHEDULES

EK002 ELECTRICAL PANEL SCHEDULES

EK003 ELECTRICAL PANEL SCHEDULES

EK004 ELECTRICAL PANEL SCHEDULES

EK005 ELECTRICAL PANEL SCHEDULES

ED-210 ELECTRICAL BASEMENT DEMO PLAN

ED-401 ELECTRICAL ONE LINE DIAGRAM - DEMO

EL-110 LIGHTING BASEMENT FLOOR PLAN

EL-111 LIGHTING FIRST FLOOR PLAN

EL-112 LIGHTING SECOND FLOOR PLAN

EL-113 LIGHTING FIXTURE SCHEDULE

EL-114 LIGHTING PENTHOUSE FLOOR PLAN

EP-210 POWER BASEMENT FLOOR PLAN

EP-210M POWER MECHANICAL BASEMENT FLOOR PLAN

EP-211 POWER FIRST FLOOR PLAN

EP-211M POWER MECHANICAL FIRST FLOOR PLAN

EP-212 POWER SECOND FLOOR PLAN

EP-212M POWER MECHANICAL SECOND FLOOR PLAN

EP-213M POWER MECHANICAL PENTHOUSE PLAN

EP-220 POWER ENLARGED ELECTRICAL PLANS

EP-401 ELECTRICAL NORMAL AND OPTIONAL STANDBY ONE-LINE DIAGRAM

EP-402 ELECTRICAL CRITICAL AND LIFE SAFETY ONE LINE DIAGRAM

EY-310 SPECIAL SYSTEMS BASEMENT FLOOR PLAN

EY-311 SPECIAL SYSTEMS FIRST FLOOR PLAN

EY-312 SPECIAL SYSTEMS SECOND FLOOR PLAN

MH-301 MECHANICAL SCHEDULES

MH-302 MECHANICAL SCHEDULES

MH-401 CONTROLS

MH-402 CONTROLS

MH-501 MECHANICAL DETAILS

MH-502 MECHANICAL DETAILS

MH-503 MECHANICAL DETAILS

MH-504 MECHANICAL DETAILS

MH-505 MECHANICAL DETAILS

MECHANICAL

MH-000 MECHANICAL SYMBOLS & ABBREVIATIONS

MH-110 MECHANICAL BASEMENT FLOOR PLAN

MH-111 MECHANICAL FIRST FLOOR PLAN

MH-112 MECHANICAL SECOND FLOOR PLAN

MH-113 MECHANICAL PENTHOUSE PLAN

MH-120 MECHANICAL SUB BASEMENT HYDRONIC FLOOR PLAN

MH-121 MECHANICAL BASEMENT HYDRONIC FLOOR PLAN

MH-122 MECHANICAL FIRST FLOOR HYDRONIC PLAN

MH-123 MECHANICAL SECOND HYDRONIC FLOOR PLAN

MH-201 MECHANICAL ENLARGED PLANS

MH-202 HYDRONIC ENLARGED PLANS

PLUMBING

PL-000 PLUMBING SYMBOLS & ABBREVIATIONS

PL-100 PLUMBING SUB-BASEMENT PLAN

PL-110 PLUMBING BASEMENT PLAN

PL-111 PLUMBING FIRST FLOOR PLAN

PL-112 PLUMBING SECOND FLOOR PLAN

PL-113 PLUMBING PENTHOUSE PLAN

PL-201 PLUMBING ENLARGED PLANS

PL-202 PLUMBING ENLARGED PLANS

PL-203 PLUMBING ENLARGED PLANS

PL-301 PLUMBING SCHEDULES

PL-401 PLUMBING RISERS

PL-501 PLUMBING DETAILS

FIRE PROTECTION

FP-100 FIRE PROTECTION SUB-BASEMENT PLAN

FP-110 FIRE PROTECTION BASEMENT PLAN

FP-111 FIRE PROTECTION FIRST FLOOR PLAN

FP-112 FIRE PROTECTION SECOND FLOOR PLAN

FP-113 FIRE PROTECTION PENTHOUSE PLAN

AS-206 BUILDING ELEVATIONS

AS-207 BUILDING ELEVATIONS

AS-300 WALL SECTIONS

AS-301 EXTERIOR STAIRWELL PLANS

AS-302 EXTERIOR STAIRWELL SECTIONS

AS-400 ENLARGED FLOOR PLANS

AS-401 ENLARGED FLOOR PLANS

AS-402 ENLARGED FLOOR PLANS

AS-403 ENLARGED FLOOR PLANS

AS-500 INTERIOR ELEVATIONS

AS-501 INTERIOR ELEVATIONS

AS-502 INTERIOR ELEVATIONS

AS-503 INTERIOR ELEVATIONS

AS-504 INTERIOR ELEVATIONS

AS-505 INTERIOR ELEVATIONS

AS-506 INTERIOR ELEVATIONS

AS-507 CASEWORK DETAILS

AS-508 CEILING DETAILS

AS-509 FLOOR FINISH DETAILS

AS-510 WALL TYPES

AS-511 ARCHITECTURAL DETAILS

AS-512 ARCHITECTURAL DETAILS

AS-600 DOOR & WINDOW SCHEDULES / DOOR & WINDOW TYPES

AS-610 DOOR, FRAME AND WINDOW TYPES

AS-620 DOOR DETAILS

AS-621 SIGNAGE SHEET

AS-630 ROOM FINISH / MATERIAL FINISH SCHEDULES

ARCHITECTURAL

AI-100 SUB-BASEMENT LIFE SAFETY PLAN

AI-101 BASEMENT LIFE SAFETY PLAN

AI-102 FIRST FLOOR LIFE SAFETY PLAN

AI-103 SECOND FLOOR LIFE SAFETY PLAN

AI-104 ATTIC LIFE SAFETY PLAN

AD-001 SITE DEMOLITION PLAN

AD-100 SUB-BASEMENT DEMOLITION PLAN

AD-101 BASEMENT DEMOLITION PLAN

AD-102 FIRST FLOOR DEMOLITION PLAN

AD-103 SECOND FLOOR DEMOLITION PLAN

AD-104 ATTIC DEMOLITION PLAN

AD-105 ROOF DEMOLITION PLAN

AS-001 PROJECT SITE PLAN

AS-002 ENLARGED SITE PLAN

AS-100 SUB-BASEMENT PLAN

AS-101 BASEMENT PLAN

AS-102 FIRST FLOOR PLAN

AS-103 SECOND FLOOR PLAN

AS-104 ATTIC PLAN

AS-105 ROOF PLAN

AS-110 BASEMENT DIMENSION PLAN

AS-111 FIRST FLOOR DIMENSION PLAN

AS-112 SECOND FLOOR DIMENSION PLAN

AS-120 BASEMENT FINISH PLAN

AS-121 FIRST FLOOR FINISH PLAN

AS-122 SECOND FLOOR FINISH PLAN

AS-130 BASEMENT REFLECTED CEILING PLAN

AS-131 FIRST FLOOR REFLECTED CEILING PLAN

AS-132 SECOND FLOOR REFLECTED CEILING PLAN

AS-200 BUILDING SECTIONS

AS-201 BUILDING SECTIONS

AS-202 BUILDING SECTIONS

AS-203 BUILDING SECTIONS

AS-204 BUILDING ELEVATIONS

AS-205 BUILDING ELEVATIONS

STRUCTURAL

S000 STRUCTURAL NOTES

S001 STRUCTURAL NOTES

S002 STRUCTURAL NOTES

S100 FOUNDATION PLAN

S101 FIRST FLOOR FRAMING PLAN

S102 SECOND FLOOR FRAMING PLAN

S103 ROOF FRAMING PLAN

S300 TYPICAL CONCRETE DETAILS

S301 TYPICAL VOIDED SLAB DETAILS

S302 TYPICAL VOIDED SLAB DETAILS

S303 FOUNDATION DETAILS

S400 TYPICAL CMU DETAILS

S401 TYPICAL CMU DETAILS

S501 TYPICAL STEEL CONNECTIONS

S510 FRAMING DETAILS

LANDSCAPE

LS-001 ENLARGED LANDSCAPE PLAN

GENERAL

GI-001 COVER SHEET

GI-002 INDEX OF DRAWINGS

GI-003 GENERAL NOTES

GI-004 BASEMENT PLAN DEDUCT ALTERNATE 1

GI-005 SECOND FLOOR DEDUCT ALTERNATE 2

(DRAFT OF SHEET INVENTORY)

BUILDING IS

FULLY

SPRINKLERED

1. UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT,

MANUFACTURED ITEMS AND ASSEMBLIES INCORPORATED INTO THE

WORK SHALL BE NEW.

2. UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL EXISTING ITEMS

ARE TO REMAIN. THEY SHALL BE PROTECTED FROM DAMAGE DUE TO

CONSTRUCTION ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT

BECOME DAMAGED DUE TO CONSTRUCTION ACTIVITIES SHALL BE

REPAIRED OR REPLACED TO MATCH EXISTING AT NO ADDITIONAL COST

TO THE OWNER.

3. NOTATIONS FOR ITEMS OF WORK APPLY TO EACH AND EVERY

GRAPHICAL INDICATION SHOWN ON THE DRAWINGS, WHETHER OR NOT

NOTED.

4. ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE THOROUGHLY

CLEANED AND PROPERLY PREPARED IN ACCORDANCE WITH THE

SPECIFICATIONS PRIOR TO THE APPLICATION OF PRIMER AND PAINT.

5. THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE

MECHANICAL, ELECTRICAL, AND PLUMBING WORK AND SATISFY THE

REQUIREMENTS FOR SUPPORT, FLOOR, WALL AND ROOF OPENINGS,

FLASHINGS AND CURBS ETC. THE ARCHITECT SHALL BE NOTIFIED OF

CONFLICTS OR DISCREPANCIES PRIOR TO COMMENCEMENT OF

CONSTRUCTION.

6. CONTRACTOR TO REPLACE & ACCURATELY LOCATE ALL EXISTING

SIGNAGE AND LABELS NOTING RATED WALL ASSEMBLIES AND SMOKE

PARTITIONS

7. THE GENERAL CONTRACTOR SHALL VISIT THE SITE, VERIFY FIELD

CONDITIONS AND CAREFULLY COMPARE SUCH FIELD CONDITIONS AND

OTHER INFORMATION KNOWN TO THE CONTRACTOR WITH CONTRACT

DOCUMENTS.

8. THE GENERAL CONTRACTOR SHALL REPORT ANY UNFORESEEN FIELD

CONDITIONS, ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED

AT ANY TIME DURING THE WORK, UPON SUCH DISCOVERY, THE

CONTRACTOR SHALL IMMEDIATELY CONTACT THE CONTRACTING

OFFICER FOR CLARIFICATION BEFORE PROCEEDING OR CONTINUING

WITH THAT PORTION OF THE WORK OR ANY PORTION RELATED THERE

TO.

9. ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES AND

STANDARDS INCLUDING THE INTERNATIONAL BUILDING CODE 2018

EDITION, VA MASTER SPECIFICATIONS, AND NFPA 101 2018 EDITION.

10. THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER, CONTRACTING OFFICER'S REPRESENTATIVE, AND ARCHITECT

OF ANY DISCREPANCIES BETWEEN THE DRAWINGS, NOTES AND ACTUAL

FIELD CONDITIONS BEFORE BIDDING AND COMMENCING ANY WORK, AND

REQUEST CLARIFICATION IN WRITING.

11. WHEN UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL

ELEMENTS THAT CONFLICT WITH THE INTENDED FUNCTION OR DESIGN

ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE AND

EXTENT OF THE CONFLICT. PROMPTLY SUBMIT A WRITTEN REPORT TO

THE CONTRACTING OFFICER.

12. WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL

COMPONENTS USING MANUFACTURER'S OR INDUSTRY STANDARDS.

WHERE STANDARDS DO NOT EXIST, NOTIFY THE C.O.R. FOR

CLARIFICATION.

13. CONTRACTOR SHALL NOT BARRICADE / BARRIER EMERGENCY EGRESS

TO OR FROM THIS AREA. CONTRACTOR SHALL MAINTAIN EXIT TO

EXTERIOR DURING THE WORK PROCESS.

14. PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE C.O.R. SECURE

ACCESS POINT AS SPECIFIED AND DIRECTED BY THE C.O.R. PROVIDE

WALK-OFF MATS TO MEET FACILITY INFECTION CONTROL GUIDELINES AT

EACH ACCESS POINT. CONTRACTOR SHALL OBTAIN AND DISPLAY ICRA,

PICRA AND ILSM PRIOR TO STARTING CONSTRUCTION.

15. CONTRACTOR TO NOTIFY VA 2 WEEKS IN ADVANCE PRIOR TO ANY

MAJOR UTILITY DISRUPTIONS OR OUTAGES. MAJOR OUTAGES

INVOLVING EMERGENCY AND CRITICAL BRANCH, SHALL BE

COORDINATED NOT LESS THAN 21 CALENDAR DAYS.

16. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE

CONTRACT DOCUMENTS, THE BETTER QUALITY, MORE STRINGENT

REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY

THE GOVERNMENT, SHALL BE PROVIDED.

BUILDING 10

BEVERLY DRIVE

S. NEW ROAD

MEMORIAL D

RIVE

BLDG. 9

BLDG. 90

GATE NO. 4

(N

O CONTRACTOR ENTRANCE)

GATE NO. 3

(N

O CONTRACTOR ENTRANCE)

MAIN GATE

(ALTERNATIVE CONTRACTOR ENTRANCE)

GATE NO. 1

(NO CONTRACTOR ENTRANCE)

GATE NO. 2

(C

ONTRACTOR ENTRANCE)

BLDG. 91

BLDG. 92

BLDG. 8

BLDG. 93

BLDG. 7

BLDG. 94

BLDG. 139

BLDG. 6

BLDG. 5

BLDG. 10

BLDG. 11

BLDG. 12

BLDG. 2

BLDG. 21

BLDG. 20

BLDG. 19

BLDG. 18

BLDG. 98

BLDG. 15

BLDG. 16

BLDG. 17

BLDG. 14

BLDG. 225

BLDG. 99

BLDG. 24

BLDG. 226

BLDG. 224

BLDG. 223

BLDG. 10

PROJECT LIMITS

HAUL ROUTE

ALTERNATIVE HAUL ROUTE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

BI

M

W

AC

O

R

EN

O

VA

TE

B

LD

G

FO

R

C

LC

/W

AC

O B

U

IL

D

IN

G

C

LC

.rv t 8/

/2

5:

:3

PM

GI-003

CONSTRUCTION

DOCUMENTS - 100%

GENERAL NOTES RENOVATE BLDG 10 FOR

CLC

4800 MEMORIAL DRIVE

RHC RJP

674A4-21-105

08/19/2022

DRAWINGS FOR THE FOLLOWING DISCIPLINES ARE

CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE

IDENTIFIED BY THE REFERENCE WHICH IS

INCORPORATED INTO THE SHEET TITLE.

EACH DRAWING IS NUMBERED ACCORDING TO ITS LOCATION ON THE

SHEET. THE DRAWING TITLE APPEARS ABOVE THE DEMARCATION LINE

AND THE DRAWING SCALE APPEARS BELOW THE DEMARCATION LINE.

SHEET NUMBER

DRAWING NUMBER ON SHEET BY LOCATION

REFERENCE

EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK AT THE

"APPROXIMATE LOCATION SHOWN." DO NOT SCALE DRAWINGS FOR

DIMENSIONAL INFORMATION

1.

ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN TO EXACT SCALE.

ALL DIMENSIONS REQUESTED ARE SHOWN (OR MAY BE DERIVED FROM THOSE

SHOWN OR NOTED) ON THE FLOOR PLANS. DETAIL PLANS, ELEVATIONS,

SECTIONS, SCHEDULES, CONFIGURATION DETAILS, AND SPECIFICATIONS. SEE

THE NOTES BELOW AND SYMBOLS FOR DIMENSIONING CONVENTIONS USED

ON THIS PROJECT.

2.

EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY, ALL DIMENSIONS

SHOWN ON THE ARCHITECTURAL DRAWINGS CONFORM TO THE FOLLOWING

CONVENTIONS.

3.

DIMENSIONS UTILIZING THE "CENTERLINE" SYMBOL ARE MEASURED TO:

ꞏ CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED

FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH

WALLS) AT PARTITIONS FRAMED WITH METAL STUDS. REFER TO

"PARTITION SCHEDULE" TO DETERMINE THICKNESS OF EACH

PARTITION TYPE.

ꞏ CENTERLINE OF DOOR, WINDOW, OR LOUVER OPENING.

ꞏ CENTERLINE OF OTHER FEATURES AS INDICATED.

A.

DIMENSIONS UTILIZING THE "FACE OF" SYMBOL ARE MEASURED TO:

ꞏ FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED

FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH WALL)

AS DEFINED BY THE PARTITION SCHEDULE. UNLESS NOTED AS A

"FACE OF FINISH" OR "CLEAR" DIMENSION (SEE NOTE "E" BELOW),

DIMENSIONS ARE NOT MEASURED TO THE FACE OF APPLIED FINISH.

REFER TO THE "PARTITION SCHEDULE" TO DETERMINE THE

THICKNESS OF EACH PARTITION TYPE.

B.

WHERE "EQUAL" DIMENSIONS ARE USED ON REFLECTED CEILING PLANS TO

LOCATE CEILING GRID WORK POINTS, MEASURE DIMENSIONS TO:

ꞏ EDGE OF THE INDICATED CEILING AT THE FACE OF THE ADJACENT

APPLIED FINISH MEASURED AT THE PLANE OF THE CEILING.

ꞏ CAUTION: DUE TO THE POSSIBLE APPLICATION OF APPLIED FINISHES -

THICKNESS OF WHICH MAY VARY BETWEEN FLOOR AND CEILING AND

IS NOT ACCOUNTED FOR (EXCEPT AS INDICATED BY "FOF" OR

"CLEAR") BY THE DIMENSION SHOWN ON THE FLOOR PLANS - THE

CONTRACTOR MUST ADJUST AS NECESSARY, THE FLOOR PLAN

DIMENSIONS TO REFLECT THE ACTUAL DIMENSIONS FOUND AT PLANE

OF THE CEILING.

C.

WHERE WALLS AND/OR PARTITIONS OF UNEQUAL THICKNESS ABUT,

ALIGN EXPOSED FACES, UNLESS OTHERWISE NOTED.

4.

ALIGN

DIMENSION, WHEN OCCURS

WHERE OPENINGS IN WALLS (SUCH AS INTERIOR WINDOWS OR DOORS) ARE

NOT DIMENSIONED BUT SHOWN AS BEING IN THE CENTER OF A GIVEN WALL

SURFACE, LOCATE OPENINGS AS GRAPHICALLY REPRESENTED.

5.

DISCIPLINE REFERENCES

DRAWING NUMBERING

DRAWING REFERENCE

GENERAL NOTES

REF. 1/1-A1

BUILDING SECTION

RE: 1/AS-126

SHEET NUMBER

DIMENSIONING CONVENTIONSARCHITECTURAL FLOOR PLAN SYMBOLS

A

COLUMN GRID

NORTH ARROW

REVISION NUMBER AND EXTENT

KEYED NOTE MARK

-SEE CORRESPONDING

NUMBERED KEY NOTE ON SHEET WHERE

REFERENCE OCCURS

REVISION NUMBER - SEE

REVISION HISTORY ON THE

TITLE BLOCK OF EACH SHEET

EXTENT OF CURRENT REVISION

1-A26

1-A26

CL

DEMOLITION LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION INDICATORS,

BUILDING, WITH BREAK STANDARDS)

DETAIL INDICATOR

DETAIL INDICATOR

DIMENSION LINE

CENTER LINE

GI GENERAL INFORMATION

C CIVIL

S STRUCTURAL

A ARCHITECTURAL

FP FIRE PROTECTION

P PLUMBING

M MECHANICAL

AS-100

DISCIPLINE SHEET NUMBER

LOCATION MAP - NTS

CONSTRUCTION LIMITS

N

EXISTING TO REMAIN

CONCRETE

MASONRY

BUILDING INTERIOR

MATERIAL GRAPHICS

GYP BD RIGID INSULATION

WOOD EARTH

DESIGN MANUALS:

- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS

- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES

- PG-18-5 EQUIPMENT LIST GUIDES

- PG-18-8 SEISMIC DESIGN HANDBOOK

- PG-18-10 DESIGN MANUALS

- VA PHYSICAL SECURITY DESIGN MANUAL FOR MISSION CRITICAL FACILITIES

- VA DESIGN GUIDELINES FOR ELEVATORS

- VA ARCHITECTURAL DESIGN MANUAL

- VA MECHANICAL DESIGN MANUAL

- VA ELECTRICAL DESIGN MANUAL

- VA PLUMBING DESIGN MANUAL

- VA FIRE PROTECTION DESIGN MANUAL

- VA SMALL HOUSE MODEL DESIGN GUIDE

APPLICABLE CODES AND REGULATIONS:

ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE CODES AND STANDARDS.

IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES, ALL WORK SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE OF TEXAS AND THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARD FOR FEDERAL FACILITIES.

APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:

- ABA ACCESSIBILITY STANDARDS

- NFPA 101, "LIFE SAFETY CODE"

- NFPA 10, "PORTABLE FIRE EXTINGUISHERS"

- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS"

- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)"

- NFPA 72, "NATIONAL FIRE ALARM CODE"

- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS"

- NFPA 99, "INSTALLATION FOR HEALTH CARE FACILITIES"

- NFPA 220, "TYPES OF BUILDING CONSTRUCTION"

- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS"

- INTERNATIONAL BUILDING CODE (IBC)

- INTERNATIONAL MECHANICAL CODE (IMC)

- INTERNATIONAL PLUMBING CODE (IPC)

- INTERNATIONAL ENERGY CONSERVATION CODE

N

KEY PLAN - NTS

PROJECT SUMMARY

L LANDSCAPE

17. CONTRACTOR TO COLLECT AND PROVIDE WASTE AND RECYCLE

MATERIALS MANIFESTS TO C.O.R. ON A MONTHLY BASIS.

18. CONTRACTOR SHALL COMPLETE AND SUBMIT TO C.O.R. THE OUTAGE

REQUEST FORM FOR ANY UTILITY OUTAGES.

BUILDING IS

FULLY

SPRINKLERED

E ELECTRICAL

19. CONTRACTOR TO COMPLY WITH ALL VA COVID 19 VACCINATION AND

INFECTION CONTROL REQUIREMENTS.

N

FD FD

UPUP

DN

DN

DN

DN

UP

U P

U P

U P

U P

U P

AS-200

6.4

5.6

5.4

XX YY ZZ B B.9 C D D.1 EA F F.1 F.5 F.9 G H J K

9.9

10.8

11.7

H.1 K.9 L M M.1 M.5 M.9 N P P.9 Q R R.1 S T

AS-205

AS-205

AS-2041

AS-202

AS-202

AS-201

AS-201

AS-203

AS-200

AS-302

AS-302

AS-2061 2

AS-206 4 AS-20713 2

AS-203

PHYSICAL THERAPY GYM

BA002

HAIR CARE SHOP/SALON

BA037

STORAGE,

HAIR CARE

SHOP/SALON

BA037B

BATHING SUITE

BA013 TLT, BATHING SUITE

BA014B

STAIRS

BS003 STAIRS

BS004

FOYER

BB040

LOBBY VESTIBULE

BB039

TLT, BATHING SUITE

BA013B

BATHING SUITE

BA014

INTERIOR TRANSFORMER

BA012

MECH

BA011

BISTRO

BB015

OFFICE, DIRECTOR

BA038

ELEC

BA011B

CONFERENCE

BC033

MECH

BC022

TOILET

BC032

TOILET

BC031

SNOEZELEN

BC021

OFFICE

BC020

RECEIVING / BREAKDOWN

BA006

OFFICE

BC019

STAFF LOCKER ROOM

BC018

OFFICE

BC024

MULTIPURPOSE ROOM

BC029

GREAT ROOM

BC030

MEDIA CENTER

BC028

CONFERENCE ROOM

BC027

OFFICE

BC026

OFFICE

BC025

PUBLIC TLT

BB016

PUBLIC TLT

BB017

ELEVATOR EQUIPMENT ROOM

BB034

COMMUNICATIONS

CLOSET

BC023

CLEAN LINEN

BA010

CLEAN LINEN

BA009

CLEAN LINEN

BA008

CLEAN LINEN

BA007

RECEPTION

BB035

CORRIDOR

BA043

CORRIDOR

BB042

BA

6A

BS003B

BA007

BA008

BA009

BA010

BA011A

BA006C

BA

1A

BS

BA

1B

BA042

BA

BA

BA

BA014B

BA013B

BA

BA037B

BB034

BC

3A

BB

BB016

BB017

BC

BC

BC

3B

BC

BC

BC032

BC031

BC

BC

BC

BC

BC028

BS004A

BC

2A

BS

BA006B

BA043A

BA043B

BA011B

BA011C

BA

5B

BC022B

BC041

FD FD

BA

6D

BA046

BA

BS004B

BC029A

BC029B

BC

BC

BS003A

EQUIPMENT STORAGE

BA001

TEACHING TOILET

BA003

TEACHING BEDROOM

BA004

SPEECH THERAPY OFFICE

BA005

BA002

BA

BA

BA005

BA036

1.

1.

1.

1.

1.

1.

STAIRS

BS001

STAIRS

BS002

BB040

NEW WALLS EXISTING WALLS

NEW CONCRETE

SIDEWALK

DEDUCT ALTERNATE 1 DELETES ALL WORK

DESIGNATED IN SPECIFICATIONS 01 00 00, 1.3, B

1. DEDUCT ALTERNATE 1 DELETES ALL WORK AND ASSEMBLIES IN THE

SHADED AREAS, SEE SPECIFICATIONS 01 00 00, 1.3, B.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

GENERAL NOTES

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

BI

M

W

AC

O

R

EN

O

VA

TE

B

LD

G

FO

R

C

LC

/W

AC

O B

U

IL

D

IN

G

C

LC

.rv t 8/

/2

9:

:5

AM

GI-004

CONSTRUCTION

DOCUMENTS - 100%

BASEMENT PLAN DEDUCT

ALTERNATE 1

RENOVATE BLDG 10 FOR

CLC

4800 MEMORIAL DRIVE

08/19/2022 RHC RJP

674A4-21-105

SCALE: 1/8" = 1'-0"1 BASEMENT PLAN DEDUCT ALTERNATE 1

N

0 16 24 328

GRAPHIC SCALE

BUILDING IS

FULLY

SPRINKLERED

LEGEND

SHEET KEY NOTES

DW

DW

D N

U P

D N

D N

DryerDryerWasherWasher

AS-200

6.4

5.6

5.4

XX YY ZZ B B.9 C D D.1 EA F F.1 F.5 F.9 G H J K

9.9

10.8

11.7

H.1 K.9 L M M.1 M.5 M.9 N P P.9 Q R R.1 S T

AS-205

AS-204 2

AS-205

AS-2041

AS-202

AS-202

AS-201

AS-201

AS-203

AS-200

AS-302

AS-302

AS-2061 2

AS-206 4 AS-20713 2

AS-203

PANTRY

2A046

NURSE OFFICE

2A047

NURSE OFFICE

2C038

PANTRY

2C039

TLT

2B013

STAFF LOUNGE

2B014

LAUNDRY

2B020

SOILED UTILITY

2B019

CLEAN UTILITY

2B018

CONFERENCE

2B016

RESIDENT ROOM

2A000

RESIDENT TLT

2A000B

RESIDENT ROOM

2A001

RESIDENT TLT

2A001B

RESIDENT ROOM

2A002

RESIDENT ROOM

2A003

RESIDENT TLT

2A003B

RESIDENT ROOM

2A006

RESIDENT TLT

2A006B

RESIDENT ROOM

2A007 RESIDENT TLT

2A007B

RESIDENT ROOM

2A008

RESIDENT TLT

2A008B

RESIDENT ROOM

2A009

RESIDNT TLT

2A009B

STAIRS

2S001

STAIRS

2S003

RESIDENT ROOM

2C037

RESIDENT TLT

2C037B

RESIDENT ROOM

2C036

RESIDENT TLT

2C036B

RESIDENT ROOM

2C035

RESIDENT TLT

2C035B

RESIDENT ROOM

2C034

RESIDENT TLT

2C034B

RESIDENT ROOM

2C031

RESIDENT TLT

2C031B

RESIDENT ROOM

2C030RESIDENT TLT

2C030B

RESIDENT ROOM

2C029

RESIDENT TLT

2C029B

RESIDENT ROOM

2C028

RESIDENT TLT

2C028B

STAIRS

2S002

STAIRS

2S004

RECREATION

2B017

TEAM AREA

2A010

TEAM AREA

2C023

RESIDENT TLT

2C032B

RESIDENT ROOM

2C032

RESIDENT ROOM

2C033

RESIDENT TLT

2C033B

RESIDENT ROOM

2A004

RESIDENT ROOM

2A005

RESIDENT TLT

2A005B

RESIDENT TLT

2A004B

KITCHEN

2C040

KITCHEN

2A045

DINING ROOM

2C022

LIVING ROOM

2C021

LIVING ROOM

2A012

DINING ROOM

2A011

DEN

2B043

DEN

2B042

STORAGE, EQUIPMENT

2B015

2A000A2A

0C

2A001A2A

1C

2S003

2A002A

2A

2C 2A

3C

2A003A

2A004A

2A

4C

2A005A2A

5C

2A006A2A

6C

2A007A

2A

8C

2A008A

2A009A

2A

9C

2S001

2B043 2B042

2B013 2B020

2B014

2B019

2B015 2B018

2B016

2S004

2S002

2C028A

2C

8C 2C

9C

2C029A

2C030A

2C

1C

2C031A

2C032B

2C

2C

2C032A

2C033A

2C

3C

2C

4C

2C034A

2C035A

2C

5C 2C

6C

2C036A

2C037A 2C

7C

CORRIDOR

2A049B

CORRIDOR

2A049

CORRIDOR

2B048

CORRIDOR

2C050

MEDICATION

2C041

MEDICATION

2A044

2A

2C

2A

7C

2C

0C

CORRIDOR

2C051C

CORRIDOR

2C050B

CORRIDOR

2A049C

ELEC CLOSET

2C026

HSKP

2C027

HSKP

2A025

ELEC CLOSET

2A024

2C

2C

2A

2A

2C027

2C026

2A025

2A024

2B048A 2B048B

O2 STOR

2C052

O2 STOR

2A051

1.

2A051

2A009B

2A008B

2A007B

2A006B

2A005B

2A004B

2A003B

2A002B

2A001B

2A000B

RESIDENT TLT

2A002B

2C052

NEW WALLS EXISTING WALLS

NEW CONCRETE

SIDEWALK

DEDUCT ALTERNATE 2 DELETES ALL WORK

DESIGNATED IN SPECIFICATIONS 01 00 00, 1.3, C

1. DEDUCT ALTERNATE 2 DELETES ALL WORK AND ASSEMBLIES IN THE

DASHED AREAS, SEE SPECIFICATIONS 01 00 00, 1.3, C.

2. 3'-0"W X 6'-0"L ATTIC ACCESS HIDEAWAY STAIRS, MAINTAIN CEILING

ASSEMBLY RATING, BASIS OF DESIGN BILCO TYPE E.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

GENERAL NOTES

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

BI

M

W

AC

O

R

EN

O

VA

TE

B

LD

G

FO

R

C

LC

/W

AC

O B

U

IL

D

IN

G

C

LC

.rv t 8/

/2

:1

7:

A M

GI-005

CONSTRUCTION

DOCUMENTS - 100%

SECOND FLOOR DEDUCT

ALTERNATE 2

RENOVATE BLDG 10 FOR

CLC

4800 MEMORIAL DRIVE

08/19/2022 RHC RJP

674A4-21-105

SCALE: 1/8" = 1'-0"1 SECOND FLOOR DEDUCT ALTERNATE 2

N

0 16 24 328

GRAPHIC SCALE

BUILDING IS

FULLY

SPRINKLERED

LEGEND

SHEET KEY NOTES

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

RETAIN EXISTING TREE

RETAIN EXISTING TREE

NEW CONCRETE.

EXISTING SIDEWALK

EXISTING

BUILDINGS

NEW CONCRETE

SIDEWALK, SLAB

OR PAVEMENT,

RE: CIVIL

SWEETGUM TREE

(LIQUIDAMBAR STYRACIFLUA)

SAVIN JUNIPER

(JUNIPERUS SABINA)

GENERAL CONTRACTOR SHALL IDENTIFY & VERIFY ALL UTILITIES ON SITE PRIOR TO

CONSTRUCTION WITH WRITTEN AUTHORIZATION FROM THE VA.

1.

GENERAL CONTRACTOR TO PROTECT ALL MANHOLES, CLEAN-OUT VALVE BOXES,

FIRE HYDRANTS & ANY OTHER UTILITIES WITHIN THE SCOPE OF WORK.

2.

GENERAL CONTRACTOR SHALL PROTECT & SAVE ALL TREES, LANDSCAPING &

GRASSED AREAS NOT TO BE REMOVED.

3.

REFER TO TECHNOLOGY, STRUCTURAL AND MEP DRAWINGS FOR ADDITIONAL

INFORMATION NOT SHOWN ON THIS PLAN.

4.

A. RESEED ENTIRE WEST ENTRY AREA.

COR. TO CONFIRM TYPE SEED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

Office of Construction &

Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

GENERAL NOTES

ARCHITECT/ENGINEER OF RECORD

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

BI

M

W

AC

O

R

EN

O

VA

TE

B

LD

G

FO

R

C

LC

/W

AC

O B

U

IL

D

IN

G

C

LC

.rv t 8/

/2

:5

3:

A M

LS-001

CONSTRUCTION

DOCUMENTS - 100%

ENLARGED LANDSCAPE PLAN RENOVATE BLDG 10 FOR

CLC

4800 MEMORIAL DRIVE

08/19/2022 RHC RJP

674A4-21-105

N BUILDING IS

FULLY

SPRINKLEREDSCALE: 1/4" = 1'-0"1 ENLARGED LANDSCAPE PLAN

LEGEND

SHEET NOTES

Revisions: Date:

0 8 12 164

GRAPHIC SCALE

GENERAL

1. Refer to Architectural, Mechanical, Electrical, and Plumbing series drawings for floor elevations, slopes, drains, and location of depressed and elevated floor areas.

2. Structural series drawings shall be compared with drawings of other series; differences shall be referred to the Architect for instruction.

3. The general contractor is responsible for coordination of all resulting revisions to the structural system or other trades as a result of acceptance of contractor proposed alternatives or substitutions.

4. The general contractor and sub-contractors shall determine the scope of the structural work from the contract documents taken as a whole. The structural drawings shall not be considered separately for purposes of bidding the structural work. Due consideration shall be given to other structural work or work related to the structure, including necessary coordination described or implied by the Architectural, Civil and MEP drawings.

5. Safety Measures: At all times the Contractor shall be solely and completely responsible for the conditions of the job site, including, but not limited to:

A. Safety of the persons and property, B. Means and methods of construction, C. Compliance with applicable OSHA requirements and guidelines, D. All necessary independent engineering reviews of these conditions.

6. The contractor shall brace and/or shore the construction as required to provide a safe and true structure. Where bracing and/or shoring is indicated in the drawings, it is done so only as a courtesy to the contractor and shall not relieve the contractor of their responsibility to coordinate the work with the aforementioned provisions. The Architect's or Engineer's job site review is not intended to include review of the adequacy of the contractor's safety measures.

7. Principal openings in the structure are indicated on the contract documents. Refer to the architectural and MEP drawings for openings, sleeves, curbs, inserts, etc. not indicated on the structural drawings.

Submit new or modified opening locations to StructuresPE, LLP for review and approval.

8. The reproductive use of the structural contract documents or electronic files as structural shop drawing documents by the contractor or sub-contractors is not allowed. Submitting copies of the structural drawings is unacceptable and will be rejected.

9. Scales noted on the drawings are for general reference only. No dimensional information shall be obtained by direct scaling of the drawing.

10. These drawings do not, nor are intended to, locate property lines, building set backs nor height limitations. It is the contractor's responsibility to locate the building and construct it to, and within, applicable code restrictions. Further, it is the Civil Engineer's responsibility to address site drainage appropriate to the site and in consideration of adjoining properties.

11. The remodeling and/or rehabilitation of an existing building requires that certain assumptions be made regarding existing conditions. The contractor shall notify StructuresPE, LLP regarding dilapidated structural members, missing framing, framing that differs from the assumed existing conditions as indicated, or other items that the contractor believes is structurally insufficient.

CODES

1. The structure and components shown in these drawings have been designed under the guidelines of the structural requirements listed in the 2018 International Building Code with required amendments.

2. Minimum Design Loads & Associated Criteria for Buildings & Other Structures, ASCE/SEI 7-16

3. Structural Steel: AISC Steel Construction Manual, Sixteenth Edition

4. Structural Concrete: American Concrete Institute, ACI 318-14

5. Structural Masonry: 2016 Building Code for Masonry Structures, ACI530-16/ASCE5-16/TMS 402-16

6. Structural Wood: National Design Specification (NDS) for Wood Construction, 2018 Ediition, ANSI/AWC NDS-2018

7. Cold-formed Steel Framing: North American Specification for the Design of Cold-formed Steel Structural Members, S100-16

DEFERRED SUBMITTAL & DELEGATED DESIGN

1. Shop drawings for deferred submittals and delegated designs shall bear the seal of the designing professional engineer and shall be approved by the component designer prior to the cursory review by the Engineer of Record for loads imposed on the basic structure. The designing engineer is responsible for code conformance and all necessary connections not specifically called out on architectural or structural drawings. Shop drawing calculations shall be included in the submittal.

2. Deferred submittals and/or delegated designs for this project are as follows:

Awnings

Canopies Guardrails and Handrails Prefabricated stair units (metal or precast concrete) Cold-Formed Metal Framing Precast concrete members

DESIGN BASIS

1. Foundations:

The following allowable soil capacities are per the Geotechnical Report noted in the Foundation and Site Preparation section of the structural notes:

Drilled Straight Shaft Piers:

End Bearing Pressure: 40,000 psf (4 feet min. penetration*) Skin Friction**: 3,000 psf (axial)

* Minimum required penetration into specific bearing stratum. Testing laboratory shall confirm the proper bearing strata per Geotechnical report. See Pier Schedule for actual penetration required from structural design.

2. Gravity Loads:

The self weight of all specified structural components is included as dead load. Additional design gravity loads are as follows:

Superimposed Dead Loads (included, but not limited to):

MEP and Ceiling: 10 psf Roof Assemblies Above Decking: 10 psf Roof PV Panels: 5 psf Architectural Floor Finishes: 10 psf Sprinkler Systems: See Below

Fire sprinkler piping supported by the structural system is to be distributed so that the weight of the water-filled pipe divided by tributary area of the supporting member does not exceed 5 pounds per square foot, and the loading imparted to any one structural member does not exceed 50 pounds per linear foot. Each structural support of the piping shall be designed to support a load equal to the weight of the water-filled pipe plus 250 pounds.

Live Loads*:

Roof: 20 psf Lobbies, Corridors, Stairs, and Exits 100 psf Corridors above first level 80 psf

*Live loads are reduced in accordance with the Building Code, where permissible. Live loads which exceed 100 psf and live loads in areas of public assembly have not been reduced.

3. Wind Loads:

The structure has been designed in accordance with ASCE 7 including the following wind design parameters:

Ultimate Design Wind Speed (3 second gust) 120 miles per hour Risk Category III Wind Exposure B Internal Pressure Coefficient ± 0.18

See the following design wind pressures for exterior components and cladding materials not specifically designed by the registered design professional responsible for the design of the structure:

4. Earthquake Loads (does not control design): The structure has been designed in accordance with ASCE 7 including the following seismic design parameters:

Risk Category II Seismic Importance Factor I/E =1.0

Mapped Spectral Acceleration, Short Period S/S = 0.065 Mapped Spectral Acceleration, 1-Second Period S/1 = 0.042 Site Class D Spectral Response Coefficient, Short Period S/D/S = 0.069

Spectral Response Coefficient, 1-Second Period S/D/1 = 0.068 Seismic Design Category A Basic Seismic Force Resisting System SHEAR WALL Design Base Shear(s) V = C/S W/x (per ASCE7 Section 11.7)

Seismic Response Coefficient C/S = 0.01 Response Modification Factor R = 2

Analysis Procedure Used ELFP

5. Ground Snow Load: P/G = 5 psf.

6. Handrails and guardrails shall be designed in accordance with Table 1607.1 of the International Building Code as follows:

A. Handrail assemblies and guards shall be designed to support lateral load of 50 pounds per linear foot (PLF) applied in any direction at the top and to transfer this load through the supports to the structure.

B. Intermediate rails, balusters, and panel fillers shall be designed to support a horizontally applied normal load of 50 pounds on an area not to exceed one square foot including openings and space between rails. Reactions due to this loading are not required to be superimposed with those in note (a) above or note (c) below.

C. Handrail assemblies and guards shall be designed to support a load of 200 pounds applied in any direction at any point on the rail. These loads need not be assumed to act cumulatively with those in note (b) above.

7. Stair treads and stringers shall be designed for a uniform load of 100 PSF. Individual stair treads shall also be designed to support a 300 lb load on a 4 square inch area in a position that will cause maximum stress.

NET DESIGN WIND PRESSURE (PSF) FOR COMPONENTS & CLADDING

Refer to ASCE 7 for zone definition and locations.

NOTE 1: Effective areas between those given above, the pressure is permitted to be linearly interpolated.

NOTE 2: Net design wind pressures have been determined using Method 1 which represent the net pressures (sum of internal and external pressures) applied normal to building surfaces.

NOTE 3: Net design wind pressures provided above are ultimate wind loads based on the load combinations outlined in ASCE 7. Appropriate load factors should be applied based on the controlling design load combinations.

EFFECTIVE WIND AREA (SQ. FT.)

10 20 50 100

ZONE 1

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 4

5 5

ZONE 4

2 3

A

A

ISOMETRIC VIEW PLAN VIEW

ZONE

ZONE

A A

ABBREVIATIONS

ARCH ARCHITECT, ARCHITECTURAL

BOD BOTTOM OF DECK (METAL DECK ONLY)

BP BASEPLATE

CFMF COLD FORMED METAL FRAMING

CJP COMPLETE JOINT PENETRATION

CL CENTERLINE

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONT CONTINUOUS

DBA DEFORMED BAR ANCHOR

EJ EXPANSION JOINT

ENG ENGINEER

EOD EDGE OF DECK

EOS EDGE OF SLAB

EQ EQUAL

FFE FINISH FLOOR ELEVATION

FTG FOOTING

GT GIRDER TRUSS

HCA HEADED CONCRETE ANCHOR

HDG HOT-DIP GALVANIZED

HDR HEADER

HORIZ HORIZONTAL

HSS HOLLOW STEEL SECTION

INFO INFORMATION

KSI KIPS PER SQUARE INCH

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LSH LONG SIDE HORIZONTAL

LSV LONG SIDE VERTICAL

LW LIGHT WEIGHT

MAX MAXIMUM

MCJ MASONRY CONTROL JOINT

MEP MECHANICAL, ELECTRICAL, PLUMBING

MFR MANUFACTURER

MIN MINIMUM

NTS NOT TO SCALE

NW NORMAL WEIGHT

O.C. ON CENTER

O.H. OPPOSITE HAND

PCF POUNDS PER CUBIC FOOT

PJP PARTIAL JOINT PENETRATION

PLF POUNDS PER LINEAR FOOT

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

REF REFER, REFERENCE

REINF REINFORCED, REINFORCEMENT

REQ'D REQUIRED

SIM SIMILAR

SOG SLAB ON GRADE

SQ SQUARE

SS STAINLESS STEEL

T.O. TOP OF

T.O. WALL TOP OF WALL

TOC TOP OF CONCRETE

TOD TOP OF DECK (WOOD DECKING ONLY)

TOS TOP OF STEEL

TYP TYPICAL

U.N.O. UNLESS NOTED OTHERWISE

VERT VERTICAL

WWF WELDED WIRE FABRIC

SHEET INDEX

S0 SERIES STRUCTURAL NOTES

S1 SERIES PLANS

S2 SERIES ENLARGED PLANS

S3 SERIES CONCRETE

S4 SERIES CMU

S5 SERIES STEEL

S6 SERIES WOOD

S7 SERIES ELEVATORS

FO

O

TIN

G M

AR

K

T.O

. FO

O

TIN

G

ELEVATIO

N

PIER

M

AR

K

T.O

. PIER

ELEVATIO

N

INDICATES ISOLATED FOOTING

INDICATES STRAIGHT SHAFT PIER

PIER

M

AR

K

T.O

. PIER

ELEVATIO

N

INDICATES BELLED PIER

H

SS C

O

LUM

N

SIZE

BASEPLATE TYPE

INDICATES HSS COLUMN

W F C

O

LU

M N

SIZE

BASEPLATE TYPE

INDICATES WF COLUMN

INDICATES MOMENT CONNECTION

INDICATES SCHEDULED CMU WALLM#

INDICATES SLAB OR DECK

SPAN DIRECTION

W O O D C

O

LU

M N

SIZE

INDICATES WOOD COLUMN

FACTORED VERTICAL

BEAM END REACTION

NUMBER OF

SHEAR STUDS

75K W18X35 (XX) 50K

C = XX" H = 15KH = 15K

BEAM CAMBER

ADDITIONAL FACTORED

DRAG FORCE

INDICATES COMPOSITE STEEL BEAM

W12X19 INDICATES BOTTOM OF DECK (BOD)

ELEVATION. ROOF DECK SLOPES

LINEARLY BETWEEN NOTED ELEVATIONS.

BOD = 115'-0"

H D U

8-SD

S2.5

INDICATES REQUIRED HOLD-DOWN

AT ENDS OF WOOD SHEAR WALL

AT SUPPORTING CONCRETE SLAB

SYMBOLS LEGEND

INDICATES SCHEDULED WOOD SHEAR

WALL BELOW. SCHEDULED SHEATHING

AND NAILING IS REQUIRED FOR SHEAR

WALL LENGTH SHOWN. HOLD-DOWN

OCCURS AT TOP OF SHEAR WALL BELOW.

(17'-0")1

CMU

HATCH LEGEND

CONCRETE

EXISTING BUILDING

GROUT

PLYWOOD

STEEL

MEP EQUIPMENT

EN

D W

ALL PO

ST

H O

LD-D

O W

N

TYPE

EN

D W

ALL PO

ST

H O

LD-D

O W

N

TYPE

INDICATES SHEAR

WALL MARK

INDICATES MINIMUM

SHEAR WALL LENGTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved Project Director:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

INTERIORSARCHITECTURE

COX DESIGN ASSOCIATES

PLANNING

AUSTIN CHICAGO DENVER EL PASO

C U s e rs \T ilm a n S c h o b e r\ D o c u m e n ts

\2 .1

.C o x .W a c o B u ild in g

R ti lm a n

Z X

T

.r v t

/1

/2

:1

:1

P

M

S000

STRUCTURAL NOTES WACO BUILDING 10

EAST DORIS MILLER CIR

WACO, TX 76711

TS ZY

22.113

08/19/22Revisions: Date:

100% CD SET

X A

S

TFO E

N

E

I G

NNCE S

E

DE

AN L

R E

T A

ET

S

I

I

L

S S

E

R F

O P

O

89190

DANTE ANGELINI

08.18.2208.19.22

FOUNDATION AND SITE PREPARATION

1. Geotechnical information indicated in the structural drawings are intended to replicate the recommendations stated in the geotechnical report. The geotechnical report shall govern in the case of any discrepancies. Contractor shall comply with recommendations indicated therein and all clarifications and interpretations of the report shall be made by the Geotechnical Engineer.

2. The subsurface information and foundation design are based on a geotechnical report prepared by Terracon, Project Number 96095120, dated December 4, 2009. The contractor shall perform excavations, foundation construction, and preparation of the subgrade under the slab on grade in accordance with the recommendations contained in the geotechnical report and Contract Documents.

See DESIGN BASIS notes for design values from the report.

3. Place backfill behind retaining walls after concrete has attained a 28-day design strength. Brace building and pit walls below grade from lateral loads until attached floors and slabs on grade have attained a 28-day design strength.

4. Within the foundation outline and 5'-0" beyond, remove all fat clay and/or unstable, completely weathered limestone strata, all organics (I.E., roots, trees, grass, and other humus), any building foundations or rubble, and any other deleterious materials to a minimum depth of 24".

5. Foundation conditions noted during construction, which differ from those described in the geotechnical report shall be reported to the architect, geotechnical engineer and StructuresPE, LLP before further construction is attempted.

6. The floor subgrade shall be properly compacted and proofrolled and shall be free of standing water, mud and frozen soil.

7. A vapor barrier with a performance equivalent to a 15 mil stego wrap vapor barrier shall be placed beneath the slab on grade and shall be continuous under all grade beams. Refer to specifications, when provided, for additional information.

8. In areas where limestone is exposed at the cut surface, remove a depth of limestone to provide for at least 6" of compacted select fill. In areas where soil or completely weathered limestone is exposed, scarify at least six inches of the cut soil subgrade and recompact to at least 95% of the maximum dry density determined using Texas State Department of Highways and Public Transportation (SDHPT) Test Method TEX-113-E conducted with a laboratory compacted effort of 6.63 FT lbs/cu. in. Hold water contents within ± 2%.

9. Contractor shall bring the building pads to grade with select fill material conforming to the recommendations of the geotechnical report. Contractor shall certify the compaction of the select fill material according to the testing requirements of the geotechnical report.

10. Means and methods of utility attachment shall be the responsibility of the contractor and do not fall under the scope of these structural documents.

11. The foundation design assumptions do allow for a limited amount of potential vertical rise that will not affect structural stability. This allowance in design does not cover architectural, mechanical, electrical or plumbing features.

12. Do not allow water or debris to stand in trenches. It bottoms of trenches become softened due to rain or slurry or other water before concrete is placed, excavate softened material and replace with properly compacted backfill or concrete.

CONCRETE TESTING

1. Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.

A. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician, Grade 1, according to ACI CO-1 or an equivalent certification program.

B. Personnel performing laboratory tests shall be ACI-certified Concrete Strength Testing Technician and Concrete Laboratory Testing Technician - Grade I. Testing Agency laboratory supervisor shall be an ACI-Certified Concrete Laboratory Testing Technician - Grade II.

2. Concrete Tests: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements:

A. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 5 cu. yd., but less than 25 cu. yd., plus one set for each additional 50 cu. yd. or fraction thereof.

B. Testing Frequency: Obtain at least one composite sample for each 100 cu. yd or fraction thereof of each concrete mixture placed each day.

C. When frequency of testing will provide fewer than five compressive strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used.

3. Slump: ASTM C 143; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture. Perform additional tests when concrete consistency appears to change.

4. Air Content: ASTM C 231, pressure method, for normal-weight concrete; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture.

5. Concrete Temperature: ASTM C 1064; one test hourly when air temperature is 40 deg. F and below and when 80 deg. F and above, and one test for each composite sample.

6. Unit Weight: ASTM C 567, fresh unit weight of structural concrete; one test for each composite sample, but not less than one test for each days' pour of each concrete mixture.

7. Compression Test Specimens: ASTM C 31

A. Cast and laboratory cure two sets of two standard cylinder specimens for each composite sample.

B. Cast and field cure two sets of two standard cylinder specimens for each composite sample.

8. Compressive- Strength Tests: ASTM C 39; test one set of two laboratory-cured specimens at 7 days and one set of two specimens at 28 days.

A. Test one set of two field-cure specimens at 7 days and one set of two specimens at 28 days.

B. A compressive strength test shall be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated.

9. When strength of field-cured cylinders is less than 85 percent of companion laboratory-cured cylinders, Contractor shall evaluate operations and provide corrective procedures for protecting and curing in-place concrete.

10. Strength of each concrete mixture will be satisfactory if every average of any three consecutive compressive-strength tests equals or exceeds specified compressive strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi.

11. Test results shall be reported in writing to Architect, concrete manufacturer, and Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain Project identification name and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials, compressive breaking strength, and type of break for both 7- and 28-day tests.

12. Nondestructive testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Architect but will not be used as sole basis for approval or rejection of concrete.

13. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Architect. Testing and inspecting agency may conduct tests to determine adequacy of concrete by cored cylinders complying with AST C 42 or by other methods as directed by Architect.

CONCRETE

9. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

10. Correct deficiencies in the Work that test reports and inspections indicate do not comply with the Contract Documents.

1. Concrete in the following areas shall have the following characteristics:

28-day Max w/ Max Usage Strength (f'c) Slump (in.)A cm Ratio Air contentB/C Agg. Size

Drilled Piers: 3000 psi 5-7 0.50 -- 1" Pier Caps: 4000 psi 3-5 0.50 -- 1" Plinths: 4000 psi 3-5 0.50 3-6% 1" Elevated Slabs and Beams: 4000 psi 3-5 0.45 3-6% 1" Concrete Slab on Steel Deck: 3500 psi 3-5 0.45 -- 1"

A. Slump shall be measured before adding water reducing admixture or plasticizing mixture.

B. Do not allow air content to exceed 3 percent for trowel-finished floors or for concrete slabs receiving a polished finish.

C. Specified air content is only required when elements are permanently exposed to weather and outside of the conditioned building envelope perimeter.

2. The minimum amounts of cementitious material may be changed if a concrete performance mix is submitted to the structural engineer for approval two weeks prior to placing any concrete. The performance mix shall include the amounts of cement, fine and course aggregate, water and admixtures, as well as the water-cement ratio, slump, and strength data in accordance with ACI 318.

The use of a performance mix requires batch plant inspection, the cost of which shall be paid by the general contractor. Review of mix submittals by the Engineer of Record indicates only that information presented conforms generally with contract documents. Contractor or supplier maintains full responsibility for specified performance.

3. All concrete mix designs shall be reviewed and approved by the testing agency prior to sending to the engineer of record for approval.

4. Use the following cementitious materials, of the same type, brand and source throughout the Project:

Portland Cement: ASTM C 150, Type I/II

5. Fly ash may be used as a pozzolan to replace a portion of the portland cement in a concrete mix, subject to the approval of the structural engineer. Fly ash, when used, shall conform to ASTM C618, Type C or F. Concrete mixes using fly ash shall be proportioned to account for the properties of the specific fly ash used and to account for the specific properties of the fly ash concrete thus resulting. The ratio of the amount of the fly ash to the total amount of fly ash and cement in the mix shall not exceed the following:

Drilled Piers: 40 percent Architecturally Exposed Concrete Slabs: 10 percent All Other Concrete: 25 percent

6. Normal weight aggregates shall conform to ASTM C33 and be provided from a single source. Fine a ggregates shall be free of materials with deleterious reactivity to alkali in cement

7. Lightweight aggregate shall conform to ASTM C 330.

8. Water shall conform to ASTM C 94/C 94M and be potable.

9. Admixtures if used shall be subject to the approval of the structural engineer.

10.Water shall not be added to the concrete at the jobsite unless the total water quantity including the water added at the jobsite does not exceed the total water quantity of the reviewed mix design. It shall be the responsibility of the contractor to coordinate the requirements of the concrete supplier and pumper to meet this requirement and to ensure a pumpable and workable mix. The use of plasticizers, retardants, and other additives shall be at the option of the contractor subject to the approval of StructuresPE, LLP. Follow the recommendations of the manufacturer for the proper use of additives.

the use of calcium chloride or other chloride bearing salts is not permitted.

11.Mixing, transporting, and placing of concrete shall conform to ACI 301 and ASTM C 94.

12.Conformance to ACI 305.1 "Specification for Hot Weather Concreting" is required when air temperature is above 90 deg F.

13.Conformance to ACI 306 "Cold Weather Concreting" is required when a period for more than three (3) consecutive days, the average daily air temperature is below 40 deg F and the air temperature is not greater than 50 deg F for more than one-half of any 24 hour period.

14.The fire protection rating for this project is based upon the use of normal weight aggregate concrete made with carbonate aggregates. Carbonate aggregates consist mainly of calcium or magnesium carbonate, e.g., limestone or dolomite, and contain 40 percent or less quartz, chert and flint.

15.General contractor shall notify the architect and StructuresPE, LLP 48 hours prior to placement of concrete in the foundation.

16.During construction, the contractor shall provide temporary shoring of walls which are ultimately supported top and bottom. Such shoring shall not be removed until the supporting elements are in place, the concrete in the walls and supporting elements has attained the specified 28 day compressive strength (fc') and compaction of the backfill against the wall has been completed.

17.Detailing of concrete reinforcement bars and accessories shall conform to the recommendations of ACI 315 "Details and Detailing of Concrete Reinforcement" and ACI SP-66 "Detailing Manual". Placing of reinforcing bars shall conform to the recommendations of ACI 315R "Manual of Engineering" and placing drawings for reinforced concrete structures" and CRSI "Manual of Standard Practice".

18.No conduit or piping larger than 1" I.D. shall be run in structural concrete members unless shown on structural drawings.

19.All pipe sleeves in concrete members shall be schedule 40 pipe unless noted otherwise on the structural drawings. Location of the sleeves shall be as approved by the Structural Engineer. Provide 3 additional stirrups each side of each sleeve in beams and space as directed by the Engineer.

20.Reinforced steel shall be deformed new billet steel bars in…