Attachment 3 - SOW - Removal and Installation of Filter Press.pdf

PDF 431 KB Posted

Attached to
Industrial Wastewater Treatment Plant Filter Press Replacement Federal contract opportunity
Solicitation number
FA487723QA268
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Industrial Wastewater Treatment Plant Filter Press Replacement, newest first.
File Type Posted
Q and A_23QA268.pdf PDF
WD_2015-5473 Rev 19.pdf PDF
Attach 1-CLIN_Pricing_Schedule.pdf PDF
Attachment 4 - Water Wash Plant Filter Press.pdf PDF
COMBO_Solicitation - IWWTP.pdf PDF
Attachment 2 - SALIENT CHARACTERISTICS Filter Press.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work For

Removal and Installation of a Filter Press

1.0. Description of Services. The contractor shall provide all tools, equipment, transportation, personnel, labor, supervision, and management to procure/provide, remove and install (1) Filter Press for AMARG Industrial Wastewater Pre-Treatment Plant, Building (BLDG.) 83106, located on the Aerospace Maintenance and Regeneration Group (AMARG) complex at Davis-Monthan Air Force Base (DMAFB), AZ.

1.1. Basic Services. The contractor will be required to remove (1) Filter Press from AMARG Industrial Wastewater Pre-Treatment Plant, Building (BLDG.) 83106 and Installation of (1) Filter Press for AMARG Industrial Wastewater Pre-Treatment Plant, Building (BLDG.) 83106.

Filter Press will be removed and placed on a prebuilt wooden pallet outside of BLDG. 83106.

1.2. Filter Press.

A. General Specs: In accordance with the manufacture, the Filter Press must be lifted from the top and only lifted from the manufacture install lifting lug.

a. Weight: 2,900lbs.

b. Length: 130”

c. Width: 48”

d. Height: 59”

e. Platform Height: 10’

1.3. New Filter Press installation share the general specs listed in 1.3 and will not exceed weight and dimensions. Installation of filter press; in accordance with the manufacture, the Filter Press must be lifted from the top and only lifted from the manufacture install lifting lug. Use of any other lifting method risk voiding the manufacture warranty—the contractor shall hold full responsibility if the approved lifting method is not followed.

1.4. AMARG Industrial Wastewater Pre-Treatment Plant, Building (BLDG.) 83106— please see attachment 3 for additional pictures.

A. Outdoor Space inside Industrial Wastewater Pre-Treatment Plant—make note of an overhead light:

1.5. Non-Personal Services. The government shall neither supervise contractor employees, nor control the method by which the contractor performs the required tasks. Under no circumstances shall the government assign tasks to or prepare work schedules for individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor’s responsibility to notify the Contracting Officer immediately.