Attachment 3 - SOO J1-J14.pdf
PDF 6 MB Posted
- Attached to
- Central Utility Plant Operation & Maintenance Services Federal contract opportunity
- Solicitation number
- 75N99024R00015
About this file
This document appears to be an attachment to a federal solicitation for the operation and maintenance of the Central Utility Plant (CUP) serving the National Institutes of Health (NIH) campus in Research Triangle Park, North Carolina. The solicitation seeks a contractor to provide a full range of support services for the CUP, including operation, maintenance, and repair of the central utility systems, waste incineration plant, and Building 101 operations. Key requirements include emergency utility repair, HVAC and UPS maintenance for computer rooms, and campus relighting. The solicitation also includes detailed information and attachments describing the existing CUP facilities, equipment, and systems. Overall, this solicitation outlines the comprehensive facility and utility management services required for the NIH campus in North Carolina.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 8 - Sol 75N99024R00015 - Amend 003.zip | ZIP file | |
| Attachment 7 -Sol 75N99024R00015 - Amend 002.zip | ZIP file | |
| Attachment 6 - Sol 75N99024R00015 Amend 001.pdf | ||
| Combined Synopsis 75N99024R00015.pdf | ||
| Attachment 1 - FAR Provisions and Clauses.pdf | ||
| Attachment 4 - NIEHS Wastewater Permit 2021.pdf | ||
| Attachment 2 - Past Performance Questionnaire.pdf | ||
| Attachment 5 - NIEHS-EPA Air Permit 04226R37.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NIEHS CAMPUS SOLICITATION 75N99024R00015
RTP, NC Central Utility Plant (CUP) RFP
SECTION J –ATTACHMENTS
LIST OF ATTACHMENTS
Attachment Title J-1 Description of Existing CUP Facilities
J-2 Electrical Distribution Model
J-3 HTHW & CHW Routing Plan
J-4 Natural Gas Routing Plan
J-5 Sanitary Sewer Model
J-6 Storm Sewer Model
J-7 Domestic Cold-Water Model
J-8 NIEHS Valve Pits and Manholes
J-9 Central Utility Plant (CUP) Equipment List
J-10 NIEHS Campus Emergency Generators and Associated Equipment
J-11 Vivarium Environmental Parameters
J-12 NIEHS Health and Safety Branch – Procedures for Preforming Maintenance on Laboratory Hoods
J-13 Campus Backflow Preventer List
J-14 Outgoing Contractor’s Phase Out Plan
J-15 Durham County Wastewater Permit No. DCL-007
J-16 NCDENR Air Permit No. 04226R37
ATTACHMENT J-1 – DESCRIPTION OF CUP EXISTING FACILITIES
This Appendix provides the Contractor with an overview of the existing facilities at the NIEHS Campus site in which the Contractor shall have responsibilities under this contract. The overview provides only a general description of the functions, major systems in the buildings, and major and special equipment.
1. CENTRAL UTILITY PLANT
BUILDING 105
SQUARE FOOTAGE: 36,800
NO. FLOORS: 2
Description of Functions in Facility Building 105 is the Central Utility Plant (CUP), the central heating and cooling plant for NIEHS Campus and EPA Campus. The building contains the high temperature hot water generating plants, a small laboratory, chilled water plants, electrical switchgear rooms, control rooms, offices, training/conference room, and shower/restroom facilities.
The high temperature hot water generating plant contains four (4) 40 MBTUH high temperature hot water (HTHW) generators, generating HTHW at 400 degrees F at 350 psig; primary and secondary HTHW system variable speed pumping equipment; expansion and storage tanks for HTHW and chilled water systems; and compressed air systems for atomization air for oil firing of generators, soot blowing and control air for instrumentation and chiller control equipment in the chilled water plant.
The chilled water plant contains five (5) 3,500 ton water chillers, condenser water pumps, primary and secondary variable speed chilled water pumps. Cooling towers are located adjacent to the CUP building.
Building 105 contains the various user interface hardware and software applications that provide the means of manipulating utility and facility control systems.
The control room P120 contains the central control and monitoring equipment to operate and monitor all CUP equipment. The current control system is ABB infi90.
Critical Environmental Conditions: None Mechanical Systems As stated above, the HTHW generators each have a generating capacity of 40 MBTUH of HTHW at 400 degrees F and 350 psig.
The generators can fire natural gas (primary fuel), No 2 fuel oil secondary. There are two 120,000 gallon aboveground fuel oil storage tanks located adjacent to the CUP. The oil is transferred from the aboveground tanks to pumps within the CUP which increase the pressure and pumps the oil to the burners on the HTHW generators. Boiler controls are electronic.
The HTHW System was designed as a primary-secondary-tertiary system with the secondary system being the underground circulation loop distributing HTHW to the NIEHS Campus and the EPA Campus. The plant has the capability for multiple configurations including split-plant operation with two generators providing HTHW for the NIEHS Campus and two generators providing HTHW for the EPA.
The HTHW system is pressurized with a nitrogen cushion. Nitrogen is introduced into the HTHW expansion tanks and the make-up storage tanks from individual sources.
The central chilled water producing equipment consists of 3,500 ton electric motor driven centrifugal water chillers, cooling towers, primary and secondary chilled water pumps, condenser water pumps, expansion tanks, pump down units and controls.
The chilled water system also was designed as a primary-secondary-tertiary system and is pressurized with nitrogen in the make-up CHW expansion tanks. Like the HTHW plant the chilled water plant is capable of multiple configurations.
HVAC Systems The HTHW generating plant is heated with ceiling-hung unit heaters supplied with HTHW and AHU's supplied with low pressure steam. Ventilation is drawn into the plant through wall and ceiling louvers and motorized dampers. Air is exhausted through roof-mounted exhaust fans.
The chilled water plant is also heated by HTHW unit heaters AND steam unit heaters, supplied with fresh air through wall louvers and air exhausted through roof-mounted exhaust fans.
The electrical switchgear room is heated with HTHW unit heaters and electric unit heaters. The room is ventilated through supply air ducts with duct-mounted registers, in line supply air fans and a roof-mounted air intake penthouse and wall louvers. Air is exhausted through roof-mounted exhaust fans.
An air handling unit with a HTHW heating coil and chilled water coil provides heating and cooling to the office and conference areas, control room, shops and storage; and shower and locker areas. A wall-mounted air conditioner supplies supplemental cooling in the Central Automated Monitoring System control room.
Plumbing A domestic hot water heater provides hot water to fixtures. Re-circulating hot water pumps and piping keeps water at desired temperatures in the system In addition to the toilets and shower facilities, there are counter top-mounted sinks in several areas, drinking fountains, and miscellaneous.
Fire Protection The entire building is protected with a wet pipe sprinkler system. A dry pipe sprinkler system is located under the covered loading dock between Building 105 and 106.
Electrical Systems The plant's electrical distribution system is supplied by four 13.2 KV feeders. The 13.2 KV is reduced in voltage by transformers located in the building to a 4160 volt system which provides power to the chiller motors and a 480 volt system which serves the remaining loads in the building. Transformers further reduce the 480 volts down to 208 and 120 volts as needed.
Emergency Power Systems A diesel emergency generator, rated 1100 KW, located outside the electrical switchgear room, provides emergency power to operate one HTHW generator and its associated equipment, primary and secondary pumps, control systems, emergency lighting, and other miscellaneous equipment.
Fire Alarm System For Buildings 105, 106, and 107, the office areas, electrical switchgear room, and chilled water plant have smoke detectors and manual pull stations with both horns and visual signals, all tied into a fire alarm control panel. There are manual pull stations with horns and visual signals in the HTHW plant. The fire alarm system is monitored by the Simplex Fire Alarm System located in the Building 101 Security Office.
Major Equipment:
• High temperature hot water generators & related equipment
• Water chillers and related equipment
• Air compressors and related equipment
• Main electrical distribution switchgear, panel boards, and motor control centers
• Diesel emergency generators
Special equipment: None Special maintenance attention:
• HTHW generators
• Water chillers
• Cooling towers
• Primary and Secondary pumps
• Air compressors
• Emergency generators
Critical Systems:
• HTHW generators
• Water chillers
• Cooling towers
• Primary and Secondary pumps
• Air compressors
• Emergency generators
2. INCINERATOR PLANT
BUILDING 106
SQUARE FOOTAGE: 13,510 feet
NO. FLOORS: 2
Description of Functions in Facility The Incineration Plant, NIEHS Building 106, is used for the incineration of soiled animal bedding, animal carcasses, non-hazardous laboratory waste (paper and plastic), chemical waste, biohazard/medical waste (e.g., waste from health units) and radioactive waste. Other activities performed at the Incineration Plant include waste receiving, handling, and short term storage incidental to incineration. The Incineration Plant is equipped with all the required safety and environmental features for this type of facility, including emergency showers, eye washes, spill containment dikes, exhaust fans, and refrigerated storage areas. The Incineration Plant has been modified to accommodate joint NIEHS and EPA needs for incineration and waste management.
These modifications included upgrading pollution control devices thereby allowing the NIEHS/EPA to meet more stringent air emission regulations.
The NIEHS Incineration Plant operations, air emission source(s) and air cleaning devices(s) for the discharge of the associated air contaminants into the atmosphere are permitted by the North Carolina Department of Environment and Natural Resources, Division of Air Quality (AIR PERMIT NO. 4226R36) in accordance with the provisions of Article 21B of Chapter 143, General statutes of North Carolina (NCGS) as amended, and other applicable Laws, Rules and Regulations. The NIEHS is considered to be in fee class: Synthetic Minor, at Site Number:
05/32/00158 on the permit. The air permit lists the following equipment in the Incineration Plant:
• One natural gas-fired incinerator (1,000 pounds per hour (maximum), type 0, 1, 2, 3, 4, and 5 wastes, with four 1.00 million Btu per hour (maximum) primary burners and a 5.0 million Btu per hour (maximum) secondary burner [ID No. ES-106-6] with one spray tower (204 gallons per minute injection rate, ID No. CD-106-1) and one wet scrubber (17 gallon per minute minimum injection rate, ID No. CD Page 2 106-2)
• Two natural gas-fired incinerator, 350 pounds per hour (maximum), type 0, 1, 2, 3, 4, and 5 wastes, with four 0.35 million Btu per hour (maximum) primary burners and a 1.5 million Btu per hour (maximum) secondary burner [ID No. ES-106-3 and ES-106-6].
Critical Environmental Conditions:
• Walk-in Environmental rooms
• Incinerators and emissions equipment Systems Monitored by Central Control:
• Fire protection system and security Mechanical Systems There is a pathological waste incinerator. The incinerator is fired with natural gas, rated 1,000 pounds per hour of type IV waste. The incinerator has electric/electronic controls, a hydraulic ram loader, and a wet quench ash removal system. There is a wet scrubber emission system with a cooling tower to cool emissions before entering the scrubber.
A monorail system installed above the incinerator is used to transfer the animal waste feed and bedding containers to a door on the hydraulic ram loader for feeding this waste into the incinerator. The monorail is also used to lift and transport the ash containers to a waste container for hauling to disposal site.
There are pathological incinerators, gas fired, rated 350 pounds per hour each when burning type IV waste. These incinerators have a hydraulic box loading system. One of the incinerators is equipped to burn liquid waste chemicals and solvents generated in the laboratories. A storage tank and transfer pump is utilized to mix the liquid waste chemicals and fuel oil and for pumping the mixture to the burner on the incinerator.
There is a cart wash to clean the pathological waste transport carts. Steam is provided by a high temperature hot water to steam generator. Steam is also supplied to a heating coil in the domestic hot water heater. Condensation is returned to the generator by a boiler feed unit.
HVAC Systems A hot water heating system consisting of a high temperature hot water to heating hot water convertor, pumps, unit heaters, and door heaters supply heat for the building except the office.
Ventilation air for the building is provided by heating and ventilating units also supplied from the hot water heating system. The rooms are exhausted by roof-mounted exhaust fans. The toilet and shower rooms are exhausted by separate exhaust fans.
The offices are heated and air conditioned by a through the wall air conditioner with electric heat.
Plumbing There is a toilet, locker & shower room. Hot water is provided by a natural gas tankless hot water heater. Domestic and soft water is supplied from Building 105.
Fire Protection The general purpose pathological incinerator area is protected with sprinklers. There are fire hose racks in the other areas of the building.
Electrical Systems Electrical service for Building 106 is supplied from Building 105 to a 480/277 volt, 3 phase, 4-wire, motor control center with 400 amp mains. The motor control center provides power to the mechanical equipment and also serves a sub-motor control center and a 120/208 volt lighting panel.
Fire Alarm System Water flow switches sense water flow and heat. Detectors in the ceiling sense temperature for the fire protection system and actuate sound and visual alarm systems. The system is tied into a fire alarm panel which is monitored by the Simplex Fire Alarm System.
Major Equipment:
• One General-purpose pathological incinerator, 1000 pounds per hour, with controls, emission equipment, and monitoring equipment
• Two Pathological and radioactive waste incinerators, 350 pounds per hour each, with controls and monitoring equipment
• Monorail crane system with remote control
• Hot water heaters and steam boiler with accessory equipment
• Cart washer/sterilizer.
• Ash containers and vacuum cleaning systems.
• Refuse containers.
• Two Trucks, dual wheel, with hydraulic operated lift gate for hauling bagged refuse.
• Special hoppers for collection of soiled animal feed and bedding
• Skid steer loader for handling refuse.
• Electrical power distribution, outdoor lighting, alarm and control systems.
Special equipment: None Special maintenance attention:
• Incinerators and emissions and monitoring equipment Critical Systems: None Radioactive Waste Radioactive waste is defined as laboratory waste product that contains Nuclear Regulatory Commission (NRC) licensed material as defined by 10 CFR 20.1003 or contains accelerator-produced radioactive material. The NIEHS and the EPA are required to abide by their respective NRC material licenses regarding the radioisotope and activity limits for incineration. Any radioactive waste that contains RCRA regulated material is classified as a "mixed waste".
Incineration of mixed waste is prohibited at the Building 106 facilities.
Medical Waste Medical waste is defined as any waste generated in the diagnosis, treatment, or immunization of human beings or animals, in research pertaining thereto, or in the production or testing of biologicals that is listed below [40 CFR 60.51c]:
• Cultures and stocks of infectious agents and associated biologicals
• Human pathological waste
• Human blood and blood products
• Used sharps
• Animal waste
• Isolation wastes
• Unused sharps
3. ELECTRICAL SUBSTATION
BUILDING 107
SQUARE FOOTAGE: 5,560
NO. FLOORS: 2
Description of Functions in Facility Building 107, the Electrical Substation Building, contains main site electrical switchgear and is supplied from the connecting substation served by Duke Power Company with two 110,000-volt incoming services.
Systems Monitored by Central Control:
• Fire protection system and security Critical Environmental Condition: None HVAC Systems
• Ceiling-hung electric heat units
• Ceiling hung DX HVAC unit
• Roof exhaust fans
Plumbing Sump Pumps located in the basement serving both building 107 sumps and the electrical manholes immediately outside of the building.
Electrical Systems Electrical service for Building 107 is supplied from a 13,800-volt transformer to a 120/208 volt, 3 phase, 4 wire, motor control center with 400 amp main. The motor control center provides power to the mechanical equipment and also serves a step up transformer 120/208 volt to 480 volt for manhole sump pumps.
Government electric distribution is accomplished through switchgear to 13,800-volt feeders to the NIEHS Campus and the EPA Campus.
Emergency Power:
Battery backup for substation control power (electrical safeties) Fire Alarm System Manual pull stations and smoke detectors in the ceiling sense and actuate sound and visual alarm systems. The system is tied into a fire alarm panel which is monitored by the Simplex Fire Alarm System.
Major equipment: Electrical Switchgear Special Equipment: None Special Maintenance Attention: Electrical Switchgear Critical Systems: Electrical Switchgear
NIEHS CAMPUS SOLICITATION NIHOF2013531
ATTACHMENT J-2 – ELECTRICAL DISTRIBUTION MODEL
ATTACHMENT J-3 – HTHW & CHW ROUTING PLAN
ATTACHMENT J-4 – NATURAL GAS ROUTING PLAN
ATTACHMENT J-5 – SANITARY SEWER MODEL
ATTACHMENT J-6 – STORM SEWER MODEL
ATTACHMENT J-7 – DOMESTIC COLD WATER MODEL
ATTACHMENT J-8 –VALVE PITS AND MANHOLE LOCATIONS
ATTACHMENT J-9 – CUP EQUIPMENT LIST
CUP EQUIPMENT LIST
Fac# Building System Location Room Comments N9004 105-NC AHU ROOF SUBLOC:BREAK RM, NORTHSIDE AHU, SUPPLY'S ADMIN OFFICE\BREAK AND CONF RM N7821 105-NC AHU FL:01 SUBLOC:NIEHS ELECTRICAL RM P111 AHU, UNIT#2, 52 GPM CHW, 7500 CFM N7822 105-NC AHU FL:01 SUBLOC:NIEHS ELECTRICAL RM P111 AHU, UNIT#3, 52 GPM CHW, 7500 CFM
N7852 105-NC AHU FL:01 EPA BOILER ROOM - NORTH SUBLOC:OVERHEAD NORTHEND,
EASTSIDE P121 AHU, UNIT#5, 2K CFM, SERVES CHWL PUMP VFD, COOLING
N7853 105-NC AHU FL:01 EPA BOILER ROOM - NORTH SUBLOC:OVERHEAD SOUTHEND
EASTSIDE BY STAIRS P121 AHU, #6, 2K CFM, SERVES HTHWL PUMP VFD, COOLING
N7854 105-NC AHU FL:01 EPA BOILER ROOM - NORTH SUBLOC:MEZ, CONTROL RM P119 AHU, #7, 600 CFM, SERVES CONTROL ROOM, COOLING N7848 105-NC AHU FL:01 EPA BOILER ROOM - NORTH SUBLOC:OVERHEAD P121 AHU, #1, 12K CFM, SERVES BOILER PLANT, HEATING N7849 105-NC AHU FL:01 EPA BOILER ROOM - NORTH SUBLOC:OVERHEAD P121 AHU, #2, 12K CFM, SERVES BOILER PLANT, HEATING N7850 105-NC AHU FL:01 EPA BOILER ROOM - NORTH SUBLOC:OVERHEAD P121 AHU, #3, 12K CFM, SERVES BOILER PLANT, HEATING N7851 105-NC AHU FL:01 EPA BOILER ROOM - NORTH SUBLOC:OVERHEAD P121 AHU, #4, 12K CFM, SERVES BOILER PLANT, HEATING N1234 107-NC AHU FL:01 NIEHS STORAGE CAGE SUBLOC:OVERHEAD, WEST SIDE 107 AHU, DX UNIT N1229 106-NC AHU FL:01 TRASH INCINERATOR RM SUBLOC:EASTSIDE OVERHEAD I-106 HEATING & VENTALATION UNIT 1, 10000 CFM, 10HP, 480V N1230 106-NC AHU FL:01 TRASH INCINERATOR RM SUBLOC:EASTSIDE OVERHEAD I-106 HEATING & VENTALATION UNIT 2, 15000 CFM, 15HP, 480V N1233 106-NC AHU FL:01 PATHOLICAL INCINERATOR RM SUBLOC:WESTSIDE OVERHEAD P-101 HEATING & VENTALATION UNIT 3, 3000 CFM, 3HP, 480V N6241 105-NC AIR COMPRESSOR FL:01 EPA BOILER ROOM - NORTH P121 AIR COMPRESSOR #1, INGERSOL-RAND PACKAGE UNIT, 125 PSI, 40 HP N0322 105-NC AIR COMPRESSOR FL:01 NIEHS BOILER ROOM - NORTH SUBLOC:MEZZ P118 AIR COMPRESSOR, QUINCY, DUEL COMPRESSOR, 5001012
N6238 105-NC AIR COMPRESSOR FL:01 EPA BOILER ROOM - NORTH P121 AIR COMPRESSOR, COMBUSTION AIR COMPRESSOR#4, ATLAS COPCO PACKAGE
UNIT, 10 HP
N6239 105-NC AIR COMPRESSOR FL:01 EPA BOILER ROOM - NORTH P121 AIR COMPRESSOR, COMBUSTION AIR COMPRESSOR#5, ATLAS COPCO PACKAGE
UNIT, 10 HP
N0321 105-NC AIR COMPRESSOR FL:01 NIEHS BOILER ROOM - NORTH P117 AIR COMPRESSOR, COMBUSTION AIR COMPRESSOR#6, SERVES B-2 & B-3 N0815 106-NC AIR CONDITIONER FL:01 OFFICE SUBLOC:EASTSIDE, WINDOW UNIT I105 AIR CONDITIONER, 450 CFM, 18K BTU/HR COOLING, 17.05K BTU/HR HEATING N0816 107-NC AIR CONDITIONER FL:01 NIEHS STORAGE CAGE SUBLOC:WESTSIDE OF BLDG. 107 HEAT PUMP
N1375 104-NC AIR CONDITIONER FL:01 COMPUTER OFFICE SUBLOC:NORTHWEST CORNER,
OVERHEAD, BEHIND CAGE AHU, DX HEAT PUMP, SERVES COMPUTER RM, TRANE M#TWE180B400EL S#6433-WF-
4HD
N8436 104-NC AIR CONDITIONER FL:01 MECH ROOM FOR DATA CENTER LEIBERT-1 AIR HANDLING UNIT, DX HEAT PUMP, SERVES COMPUTER RM, LEIBERT
M#DH380AUAAEI S#
N8437 104-NC AIR CONDITIONER FL:01 MECH ROOM FOR DATA CENTER LEIBERT-2 AIR HANDLING UNIT, DX HEAT PUMP, SERVES COMPUTER RM, LEIBERT
M#DH380AUAAEI S#
N8438 104-NC AIR CONDITIONER FL:01 MECH ROOM FOR DATA CENTER LEIBERT-3 AIR HANDLING UNIT, DX HEAT PUMP, SERVES COMPUTER RM, LEIBERT
M#DH380AUAAEI S#
N8439 104-NC AIR CONDITIONER FL:01 MECH ROOM FOR DATA CENTER LEIBERT-4 AIR HANDLING UNIT, DX HEAT PUMP, SERVES COMPUTER RM, LEIBERT
M#DH380AUAAEI S#
N7610 105-NC AIR DRYER FL:01 NIEHS CHILLER ROOM - NORTH P116 AIR DRYER, REFRIGERATED, INGERSOLL RAND M# DRYSTAR N7611 105-NC AIR DRYER FL:01 EPA BOILER ROOM SUBLOC:SOUTH MEZZ P121 AIR DRYER, REFRIGERATED, INGERSOLL RAND M# DXR200RTE5, 80 PSI, 5 HP N7612 105-NC AIR DRYER FL:01 EPA BOILER ROOM SUBLOC:SOUTH MEZZ P121 AIR DRYER, REFRIGERATED, INGERSOLL RAND M# DXR200RTE5, 80 PSI, 5 HP N0323 106-NC AIR DRYER FL:01 PATHOLOGICAL INCINERATOR ROOM I102 INGERSOLL RAND, DRYSTAR AIR DRYER
N7618 105-NC AUTOMATIC
TRANSFER SWITCH FL:01 NIEHS ELECTRICAL ROOM P111 AUTOMATIC TRANSFER SWITCH #2, 05001525
N7619 105-NC AUTOMATIC
TRANSFER SWITCH FL:01 NIEHS ELECTRICAL ROOM P111 AUTOMATIC TRANSFER SWITCH #3, 05001524
N7621 105-NC AUTOMATIC
TRANSFER SWITCH FL:01 NIEHS ELECTRICAL ROOM P111 AUTOMATIC TRANSFER SWITCH #5, 05001520
Fac# Building System Location Room Comments
N10962 101-NC BACKFLOW
PREVENTER FL:01 SUBLOC:N WALL MRI-36 BACK FLOW PREVENTER M#950-XLT2 S#1308882
N5339 105-NC BACKFLOW
PREVENTER FL:01 P118 (005110945) 6" FEBCO 860 RPZ, MAKE-UP-BY-PASS PROCESS WATER
N5340 105-NC BACKFLOW
PREVENTER FL:01 P118 (0006161239) 6" FEBCO 860 RPZ, MAKE-UP PROCESS WATER
N9666 105-NC BACKFLOW
PREVENTER FL:01, NORTH PLANT CHILLER ROOM P112 (13239)1-1/2' Conbraco DCVA, Heat Exchanger P117
N5341 105-NC BACKFLOW
PREVENTER FL:01 SUBLOC:CHILLER & REF STORAGE P112 (270704) 3/4 WATTS 909 RPZ, MAKE-UP REFRIG RECOVERY TANK
N5342 105-NC BACKFLOW
PREVENTER FL:01 SUBLOC:S. CAMPUS MEZZ P118 (334511)MAKE-UP TO HTHW (334511) 2" WATTS 909 RPZ
N9667 105-NC BACKFLOW
PREVENTER FL:01, NORTH PLANT CHILLER ROOM P112 (361929) 3/4 ' WATTS 009M3QT RPZ, Hot water Make-Up P118
N5345 105-NC BACKFLOW
PREVENTER FL:01 SUBLOC:RISER ROOM (48327)FIRE PROTECTION BY-PASS FOR 6" DCVA (48327) 3/4 WATTS 007M1 DCVA
N5346 105-NC BACKFLOW
PREVENTER FL:01 SUBLOC:RISER ROOM (I-11749)FIRE PROTECTION (I-11749) 6" AMES 3000SS DCVA
N10847 110-NC BACKFLOW
PREVENTER FL:01 SUBLOC:MECH ROOM 116 (2") FEBCO, MODEL 825Y
N10848 110-NC BACKFLOW
PREVENTER FL:01 SUBLOC:MECH ROOM 116 (2") FEBCO, MODEL 825Y
N5331 NC-General BACKFLOW PREVENTER CORNER OF LAKEVIEW DR\JOURNAL LANE (R03297)FIRE PROTECTION, 8" WILKINS 475DA RPDA
N8872 101-NC BACKFLOW
PREVENTER FL:APH SUBLOC:OVERHEAD CHW PUMPS (061350) 1"WATTS 009M2QT RPZ, MAKE-UP TO CHILLER
N5316 101-NC BACKFLOW
PREVENTER FL:B00 MECH RM SUBLOC:WEST WALL BEHIND DOM HT WTR TNKS B005 (136606) 3" WATTS 909 RPZ, DOM HOT WTR MAKE-UP
N5317 101-NC BACKFLOW
PREVENTER FL:B00 MECH RM SUBLOC:WEST WALL BEHIND DOM HT WTR TNKS B005 (136612) 3" WATTS 909 RPZ, DOM HOT WTR MAKE-UP
N5318 101-NC BACKFLOW
PREVENTER
FL:B00 MECH RM SUBLOC:ABOVE LAB HEAT EXCHANGERS(180) ON
PLATFORM B005 (172007) 4" WATTS 909 RPZ, LAB HT WTR MAKE-UP
N5319 101-NC BACKFLOW
PREVENTER
FL:B00 MECH RM SUBLOC:ABOVE LAB HEAT EXCHANGERS(180) ON
PLATFORM B005 (172062) 4" WATTS 909 RPZ, LAB HT WTR MAKE-UP
N5321 101-NC BACKFLOW
PREVENTER FL:B00 MECH RM B005 (1915397)FIRE PROTECTION 3/4" WILKINS 950XL DCVA, BY-PASS FOR 6" WILKINS
N5322 101-NC BACKFLOW
PREVENTER FL:B00 MECH RM B005 (1934687)FIRE PROTECTION 3/4" WILKINS 950XL DCVA, BY-PASS FOR 6" WILKINS
N5312 101-NC BACKFLOW
PREVENTER FL:B00 MECH RM SUBLOC:SOUTH WALL B005 (245207) 6" WATTS 909 RPZ, DOMESTIC BLDG INLET, LAB COLD WTR, N5313 101-NC BACKFLOW
PREVENTER FL:B00 MECH RM SUBLOC:SOUTH WALL B005 (245208) 6" WATTS 909 RPZ, DOMESTIC BLDG INLET, LAB COLD WTR, N5314 101-NC BACKFLOW
PREVENTER
FL:B00 MECH RM SUBLOC:SOUTHEND, OVERHEAD ON PLATFORM BY
VFD'S B005 (246065) 6" WATTS 709 DCVA, DOMESTIC COLD WTR,
N5315 101-NC BACKFLOW
PREVENTER
FL:B00 MECH RM SUBLOC:SOUTHEND, OVERHEAD ON PLATFORM BY
VFD'S B005 (246082) 6" WATTS 709 DCVA, DOMESTIC COLD WTR,
N5320 101-NC BACKFLOW
PREVENTER
FL:B00 MECH RM SUBLOC:SOUTHEND, OVERHEAD AT REAR OF LAB
HT WTR HX'S B005 (269653) 1" WATTS 909 RPZ, HTHW PMP SEAL COOLING MAKE-UP"STANDBY", N5327 101-NC BACKFLOW
PREVENTER
FL:B00 MECH RM SUBLOC:OVERHEAD BETWEEN BLR1 AND HHW AIR
SEPERATOR TANK B005 (334357) 1" WATTS 909 RPZ, HHW MAKE-UP
N5328 101-NC BACKFLOW
PREVENTER
FL:B00 MECH RM SUBLOC:OVERHEAD BETWEEN BLR1 AND HHW AIR
SEPERATOR TANK B005 (399939) 1" WATTS 909 RPZ, HHW MAKE-UP
N5325 101-NC BACKFLOW
PREVENTER
FL:B00 MECH RM SUBLOC:WESTWALL OVERHEAD ON PLATFORM
BETWEEN DOM HT WTR TANKS B005 (V0551)FIRE PROTECTION 6" WILKINS 350DA DCDA
N5326 101-NC BACKFLOW
PREVENTER
FL:B00 MECH RM SUBLOC:WESTWALL OVERHEAD ON PLATFORM
BETWEEN DOM HT WTR TANKS B005 (V00560)FIRE PROTECTION 6" WILKINS 350DA DCDA
N5323 101-NC BACKFLOW
PREVENTER FL:E00 SUBLOC:STORAGE RM E011 (1966063)FIRE PROTECTION 3/4" WILKINS 950XL DCVA, BY-PASS FOR 6" WILKINS
N5324 101-NC BACKFLOW
PREVENTER FL:E00 SUBLOC:STORAGE RM E011 (N18602)FIRE PROTECTION 6" WILKINS 350DA DCVA
N2745 101-NC BACKFLOW
PREVENTER FL:F00 MECH RM SUBLOC:CENTER OF RM ACROSS FROM AIR COMP. F051 (03091) 3" WATTS 009 RPZ, LAB COLD WATER, N2746 101-NC BACKFLOW
PREVENTER FL:F00 MECH RM SUBLOC:CENTER OF RM ACROSS FROM AIR COMP. F051 (03104) 3"WATTS 009 RPZ, DOMESTIC COLD WATER, N2747 101-NC BACKFLOW
PREVENTER FL:F00 MECH RM SUBLOC:CENTER OF RM ACROSS FROM AIR COMP. F051 (03115) 3" WATTS 009 RPZ, DOMESTIC COLD WATER, N2748 101-NC BACKFLOW
PREVENTER FL:F00 MECH RM SUBLOC:CENTER OF RM ACROSS FROM AIR COMP. F051 (03524) 3" WATTS 009 RPZ, LAB COLD WATER, N5308 101-NC BACKFLOW
PREVENTER FL:F00 MECH RM SUBLOC:CENTER OF RM ACROSS FROM AIR COMP. F051 (1676431)FIRE PROTECTION 3/4" WILKINS 975XL RPZ, 8" BYPASS WILKINS, N5309 101-NC BACKFLOW
PREVENTER FL:F00 MECH RM SUBLOC:CENTER OF RM ACROSS FROM AIR COMP. F051 (1712346)FIRE PROTECTION 3/4" WILKINS 975XL RPZ, 8" BYPASS WILKINS, N5365 101-NC BACKFLOW
PREVENTER
FL:F00 MECH RM SUBLOC:NORTHWEST WALL BY DOOR NEXT TO
EXP\TNK F051 (401999) 3/4" WATTS 909 RPZ, REHEAT HOT WATER MAKE UP
N5366 101-NC BACKFLOW
PREVENTER FL:F00 MECH RM SUBLOC:NEAR HW EXP TNK\DFT F051 (402000) 3/4" WATTS 909 RPZ, PREHEAT HOT WATER MAKE UP
N5367 101-NC BACKFLOW
PREVENTER
FL:F00 MECH RM SUBLOC:NORTHWEST WALL BY DOOR NEXT TO
EXP\TNK F051 (426636) 3/4" WATTS 909 RPZ, REHEAT HOT WATER MAKE UP
N5368 101-NC BACKFLOW
PREVENTER FL:F00 MECH RM SUBLOC:NEAR HW EXP TNK\DFT F051 (427043) 3/4" WATTS 909 RPZ, PREHEAT HOT WATER MAKE UP
N5310 101-NC BACKFLOW
PREVENTER FL:F00 MECH RM F051 (M01889)FIRE PROTECTION, MAIN 8" WILKINS 375DA RPDA
N5311 101-NC BACKFLOW
PREVENTER FL:F00 MECH RM F051 (M02388)FIRE PROTECTION, MAIN 8" WILKINS 375DA RPDA
N5334 102-NC BACKFLOW
PREVENTER
FL:01 MECH RM SUBLOC:LOADING DOCK, NORTH WALL BY AIR
COMPRESSOR S115X (628163) 3/4" WATTS 909QT RPZ, CHILL WATER MAKE-UP
N10255 104-NC BACKFLOW
PREVENTER FL:01 SUBLOC: MECH ROOM,BY LOADING DOCK WALL W108X (382313)DOMESTIC WATER, 3/4" WATTS RPZ-009M3QT-
N9119 105-NC BACKFLOW
PREVENTER FL:01 SUBLOC: NP MEZZ (361929RP)MAKE-UP, HEATING HOT WATER SUPPLY 3/4" WATTS, 009-M3QT
N5347 106-NC BACKFLOW
PREVENTER FL:01 I106 1" WILKINS 975XL RPZ - 3628344
N5349 108-NC BACKFLOW
PREVENTER FL:01 MECH RM SUBLOC:NORTHSIDE, ON EAST WALL (432716) 1" WILKINS 975XL RPZ, UTILITY WTR, BOILER MAKE-UP
N5351 108-NC BACKFLOW
PREVENTER FL:01 MECH RM SUBLOC:NORTHSIDE, ON EAST WALL (477904) 2" WILKINS 975XL RPZ, LAB COLD WATER
N5350 108-NC BACKFLOW
PREVENTER FL:01 MECH RM SUBLOC:NORTHSIDE, ON EAST WALL (460488) 2" WILKINS 975XL RPZ, POTABLE WATER
N5352 109-NC BACKFLOW
PREVENTER LEFT SIDE OF P.O.R. CLINIC (2749081)FIRE PROTECTION BY-PASS 3/4 WILKINS 975XL RPZ
N5353 109-NC BACKFLOW
PREVENTER LEFT SIDE OF P.O.R. CLINIC (2787701)FIRE PROTECTION BY-PASS 3/4 WILKINS 975XL RPZ
N5354 109-NC BACKFLOW
PREVENTER FL:01 MECH RM#2 166 (A04662) 3/4" WATTS 009M3 RPZ, MAKE UP HUMIDIFIER
N5355 109-NC BACKFLOW
PREVENTER FL:01 189 (A32833) 1" WATTS 009M2 RPZ, MAKE UP COLD WATER LAB
N5356 109-NC BACKFLOW
PREVENTER FL:01 EQUIP MECH RM 131 (A36325) 1" WATTS 009M2 RPZ, MAKE UP HEAT BOILER
N5357 109-NC BACKFLOW
PREVENTER FL:01 189 (A40773) 1" WATTS 009M2 RPZ, MAKE UP HOT WATER LAB
N5358 109-NC BACKFLOW
PREVENTER FL:01 MECH RM#1 129 (A65109) 3/4" WATTS 009M3 RPZ, MAKE UP CHILLED WATER
N5359 109-NC BACKFLOW
PREVENTER FL:01 MECH RM#3 181 (A67580) 3/4" WATTS 009M3 RPZ, MAKE UP HUMIDIFIER
N5360 109-NC BACKFLOW
PREVENTER FL:01 LAB 152 (A82703) 3/4" WATTS 009M3 RPZ, MAKE UP HUMIDIFIER
N5361 109-NC BACKFLOW
PREVENTER LEFT SIDE OF P.O.R CLINIC (M04751)DOMESTIC CONTAINMENT, INSULATED ENCLOSURE 3" WILKINS 375 RPZ
N5362 109-NC BACKFLOW
PREVENTER LEFT SIDE OF P.O.R CLINIC (M04752)DOMESTIC CONTAINMENT, INSULATED ENCLOSURE 3" WILKINS 375 RPZ
N5363 109-NC BACKFLOW
PREVENTER LEFT SIDE OF P.O.R CLINIC (R01934)FIRE PROTECTION 6" WILKINS 475 RPDA
N5364 109-NC BACKFLOW
PREVENTER LEFT SIDE OF P.O.R CLINIC (R01967)FIRE PROTECTION 6" WILKINS 475 RPDA
N10251 NC-General BACKFLOW PREVENTER BLDG .101 SOUTHSIFE OF PARKING LOT, VALVE PIT (3581673)FIRE PROTECTION, BYPASS 3/4" WILKINS 975XLD RPZ
N10257 NC-General BACKFLOW PREVENTER BLDG. 101 SOUTH SIDE OF PARKING LOT (R03907)FIRE PROTECTION, 8"WILKINS 475DA RPDA
N10246 NC-General BACKFLOW PREVENTER SUBLOC: BESIDE BLDG.102 LOADING DOCK (3581695)FIRE PROTECTION 3/4" WILKINS 975XL RPZ
N10247 NC-General BACKFLOW PREVENTER SUBLOC: BESIDE BLDG.102 LOADING DOCK (3581697)FIRE PROTECTION 3/4" WILKINS 975XL RPZ
N10252 NC-General BACKFLOW PREVENTER BLDG. 102 HOT BOX (3656325)FIRE PROTECTION BY-PASS 3/4" WILKINS 975XLD RPZ
N5337 NC-General BACKFLOW
PREVENTER VALVE PIT #8 (J06186)FIRE PROTECTION 4" WILKINS 350 DCVA
N5338 NC-General BACKFLOW
PREVENTER VALVE PIT #8 (J06194)FIRE PROTECTION 4" WILKINS 350 DCVA
N10244 NC-General BACKFLOW PREVENTER SUBLOC: BESIDE BLDG.102 LOADING DOCK (R03905 )FIRE PROTECTION10" WILKINS 475 RPDA
N10245 NC-General BACKFLOW PREVENTER SUBLOC: BESIDE BLDG.102 LOADING DOCK (R03906)FIRE PROTECTION10" WILKINS 475 RPDA
N10248 NC-General BACKFLOW PREVENTER SUBLOC: BESIDE BLDG.102 LOADING DOCK (R03906)FIRE PROTECTION10" WILKINS 475 RPDA
N10249 NC-General BACKFLOW PREVENTER SUBLOC: BESIDE BLDG.102 LOADING DOCK (R03906)FIRE PROTECTION10" WILKINS 475 RPDAR03906
N10254 NC-General BACKFLOW
PREVENTER BLDG. 102 HOTBOX (R04169)FIRE PROTECTION, 8"WILKINS 475DA RPD
N5335 NC-General BACKFLOW
PREVENTER VALVE PIT #7 (W24498) 6" WILKINS 550 DCVA
N5336 NC-General BACKFLOW
PREVENTER VALVE PIT #7 (W32238) 6" WILKINS 550 DCVA
N10250 NC-General BACKFLOW PREVENTER BLDG. 105 WEST PARKING LOT, VALVE PIT #1 (3389942)FIRE PEOTECTION BY-PASS, 3/4" WILKINS 975XLD RPZ
N10256 NC-General BACKFLOW PREVENTER BLDG. 105 WEST PARKING LOT, VALVE PIT #1 (R03404)FIRE PROTECTION 8" WILKINS 475DA RPDA
N10253 NC-General BACKFLOW
PREVENTER BLDG. 108 HOT BOX (3696841)FIRE PROTECTION 3/4"WILKINS 975XLD RPZ
N10258 NC-General BACKFLOW
PREVENTER BLDG.108 HOTBOX (R04316)FIRE PROTECTION, 8" WILKINS 475DA RPDA
N5348 NC-General BACKFLOW PREVENTER VALVE PIT, PARKING LOT RIGHTSIDE, INGROUND (2DM1249)FIRE PROTECTION 8" AMES 2000 DCVA
N5332 NC-General BACKFLOW PREVENTER CORNER OF LAKEVIEW DR\JOURNAL LANE (3354572)FIRE PROTECTION, 3/4" WILKINS 975XLD RPZ, BY-PASS FOR 6" WILKINS
N5343 NC-General BACKFLOW
PREVENTER VALVE PIT#1 SUBLOC:WEST OF PARKING LOT (W32169) 4" WILKINS 550 DCVA
N5329 NC-General BACKFLOW
PREVENTER VAULT #6 (W32171)VAULT #6, FIRE PROTECTION 4" WILKINS 550 DCVA
N5344 NC-General BACKFLOW
PREVENTER VALVE PIT#1 SUBLOC:WEST OF PARKING LOT (W32229) 4" WILKINS 550 DCVA
N5330 NC-General BACKFLOW
PREVENTER VAULT #6 (W32230)VAULT #6, FIRE PROTECTION 4" WILKINS 550 DCVA
N0299 105-NC BATTERY CHARGER FL:01 NIEHS ELECTRICAL ROOM P111 SERVES 13.8 KV SWITCHGEAR CONTROL POWER, 05001987 N7622 105-NC BATTERY CHARGER FL:01 NIEHS ELECTRICAL ROOM P111 SERVES EMERGENCY DIESEL GENERATOR 1 N3704 105-NC BATTERY CHARGER FL:01 EPA ELECTRICAL ROOM P124 WITH DC CTRL PANEL, 05003614
N7924 106-NC BATTERY CHARGER FL:01 I101 FORK TRUCK , MAC 24V, 02001426
N0302 107-NC BATTERY CHARGER FL:01 MAIN ELECTRICAL ROOM 107 BATTERY CHARGER
N0293 101-NC BATTERY CHARGER FL:C00 C055 BATTERY CHARGER
N0292 101-NC BATTERY CHARGER FL:C00 C055 BATTERY CHARGER
N0294 101-NC BATTERY CHARGER FL:01 BATTERY CHARGER
N0483 109-NC BATTERY CHARGER FL:01 ELECTRIC CLOSET 164 EMERGENCY GENERATOR, BATTERY CHAGER
N0303 108-NC BATTERY CHARGER FL:01 103 BATTERY CHARGER
N0297 105-NC BATTERY POWER UNIT FL:01 NIEHS ELECTRICAL ROOM P112 FOR LP-P1, 1200W, 277V, 05001487 N0295 105-NC BATTERY POWER UNIT FL:01 NIEHS CHILLER ROOM - NORTH P112 LP-P2, 1200W, 277V, 05000640 N3708 105-NC BATTERY STATION FL:01 NIEHS ELECTRICAL ROOM P111 SERVES 13.8 KV SWITCHGEAR CONTROL POWER, N3709 105-NC BATTERY STATION FL:01 P111 SERVES EMERGENCY DIESEL GENERATOR 1
N3706 105-NC BATTERY STATION FL:01 P124 10 BATTERIES, TYPE 3CC-7, 150 AMP/HR
N3621 105-NC CATHODIC
PROTECTION FL:01 NIEHS ELECTRICAL ROOM P111 CATHODIC PROTECTION RECTIFIER 1, 05002349
N7634 105-NC CATHODIC
PROTECTION FL:01 P121 CATHODIC PROTECTION RECTIFIER 3, FUEL OIL TANKS
N8814 105-NC CHILLER FL:01 NIEHS CHILLER ROOM - SOUTH P112 CENTRAVAC DUPLEX 3500TON, TRANE M# CDHF_3500, S#L12B00465 N0379 105-NC CHILLER FL:01 NIEHS CHILLER ROOM - SOUTH P112 CARRIER 3500TON, R134A, 05003490 N0382 105-NC CHILLER FL:01 EPA CHILLER ROOM - SOUTH P123 YORK OM3500 TITAN CHILLER, R134A, 05003568 N0383 105-NC CHILLER FL:01 EPA CHILLER ROOM - SOUTH P123 YORK OM3500 TITAN CHILLER, R134A, 05003569 N0384 105-NC CHILLER FL:01 EPA CHILLER ROOM - SOUTH P123 YORK OM3500 TITAN CHILLER, R134A, 05003570 N8890 104-NC COND-RTN-UNIT FL:01 MECH ROOM FOR DATA CENTER, BEHIND LEIBERT UNITS CONDENSATE RETURN UNIT FOR THE LEIBERTS 1&2 N8891 104-NC COND-RTN-UNIT FL:01 MECH ROOM FOR DATA CENTER, BEHIND LEIBERT UNITS CONDENSATE RETURN UNIT FOR THE LEIBERTS 3&4 N7633 105-NC CONTROL PANEL FL:01 SOUTH PLANT P124 CONTROL PANEL#1, CSI, WALL LOUVER CONTROL PANEL FOR SOUTH PLANT N7842 105-NC CONTROL PANEL FL:01 NORTH PLANT P117 CONTROL PANEL#2, VFD HTHWL-1 AND HTHWL-2, 05003178 N7843 105-NC CONTROL PANEL FL:01 NORTH PLANT P117 CONTROL PANEL#3, VFD CHWL-1 AND CHWL-2, 05003177
N7862 105-NC CONTROL PANEL FL:01 SOUTH PLANT P121 CONTROL PANEL, FUEL OIL SYSTEM CONTROL
N3721 106-NC CONTROL PANEL FL:01 I106 H&V UNITS 1 AND 2 CONTROL PANEL
N7951 106-NC CONTROL PANEL FL:01 I107 DAC UNITS 2 AND 3 HVAC CONTROL PANEL
N7952 106-NC CONTROL PANEL FL:01 I101 H&V UNIT 3 CONTROL PANEL, 06000572
N9668 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Chilled Water DP Switch N9669 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Evaporator DP Switch N9670 105-NC CONTROLS FL:01, North Plant Chiller Room P112 CDW Return Actuator N9671 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Interstage Cooler DP Switch N9672 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Sub Cooler Level, Range 0 - 100% N9673 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Sub Cooler Level, Range 0 - 100% N9674 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Strainer Diff Pressure Switch N9675 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Interstage Valve Position, Range 0 - 100% N9676 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Compressor Vane Actuator, Range 0 - 100% N9677 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Chilled Water Temp Setpoint remote N9678 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Demand Limiter Remote N9679 105-NC CONTROLS FL:01, North Plant Chiller Room P112 CHW Pump #4 Aux. setpoint N9680 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Hot Gas Valve #1 Position, Range 0 - 100% N9681 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Hot Gas Valve #2 Position, Range 0 - 50% N9682 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Condenser Water DP Switch N9683 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Chilled Water DP Switch N9684 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Evaporator DP Switch N9685 105-NC CONTROLS FL:01, North Plant Chiller Room P112 CDW Return Actuator N9686 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Interstage Cooler DP Switch N9687 105-NC CONTROLS FL:01, North Plant Chiller Room P112 CHW Pump # 5 Aux Setpoint N9688 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Strainer Diff Pressure Switch N9689 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Balance Piston Intercooler Diff. Pressure, Range 0 - 100 psi N9690 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Chilled Water Temp Setpoint Remote N9691 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Demand Limiter Remote N9692 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Hot Gas Valve #1 Position, Range 0 - 100 % N9693 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Condenser Water DP Switch N9694 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Chilled Water DP Switch N9695 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Evaporator DP Switch N9696 105-NC CONTROLS FL:01, North Plant Chiller Room P112 CDW Return Actuator N9697 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Interstage Cooler DP Switch N9698 105-NC CONTROLS FL:01, North Plant Chiller Room P112 CHW Pump # 6 Aux Setpoint N9699 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Strainer Diff Pressure Switch N9700 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Chilled Water Temp Setpoint Remote N9701 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Demand Limiter Remote
N7637 105-NC CONTROLS FL:01 GAUGE CALIBRATION, CRITICAL
N1171 105-NC CONTROLS COOLING TOWER #1, NORTH LEVEL INDICATOR, CT1, 5003354
N1172 105-NC CONTROLS COOLING TOWER #1, NORTH LEVEL INDICATOR, CT1, 5003353
N1173 105-NC CONTROLS COOLING TOWER #2, NORTH LEVEL INDICATOR, CT2
N1174 105-NC CONTROLS COOLING TOWER #2, SOUTH LEVEL INDICATOR, CT2
N9702 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Low Natural Gas Pressure Switch, ASHCROFT N9703 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Low Natural Gas Pressure Switch, ASHCROFT
N7808 105-NC CONTROLS GAUGE CALIBRATION, NONCRITICAL
N9704 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Visual Level Indictor, ET-2, GEM N9705 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Digital Level Control, High Alarm @ 157" N9706 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Digital Level Control, Low Level Alarm @ 79" N9707 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Digital Level Controller, ET-2 N9708 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Pressure Transmitter, ET-2, Range 0-500 psig N9709 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Temperature Transmitter, ET-2, Range 80 - 370 F N9710 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Visual Level Indicator, ET-3 N9711 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Digital Level Control, HET-3 High Alarm 96" N9712 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Digital Level Device ET-3 Low Level Alarm N9713 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Digital Level Control, Low Low Level Alarm 72" N9714 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Digital Level Control, High High Alarm 104" N9715 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Pressure Transmitter, ET-3 Range 0-500 psig N9716 105-NC CONTROLS FL:01, North Plant Chiller Room P112 Temperature Transmitter, ET-3 Range 150 - 300 F
N7835 105-NC CONTROLS FL:01 P112 SQN-8X GAS MONITOR FOR CHILLER #1 AND #2
N7836 105-NC CONTROLS FL:01 P112 CHILLGUARD RT REFRIDGERANT MONITOR FOR CHILLER #3
N7926 106-NC CONTROLS GAUGE CALIBRATION, CRITICAL
N7973 106-NC CONTROLS GAUGE CALIBRATION, NONCRITICAL
N7991 107-NC CONTROLS GAUGE CALIBRATION, CRITICAL
N7993 107-NC CONTROLS GAUGE CALIBRATION, NONCRITICAL
N7638 105-NC COOLING TOWER COOLING TOWER #1, NORTH (NIEHS) COOLING TOWER, 5003445
N6307 105-NC COOLING TOWER COOLING TOWER #2, SOUTH (EPA) COOLING TOWER, 5003513
N7927 106-NC COOLING TOWER SERVICE YARD SUBLOC:NORTH SIDE OF BUILDING COOLING TOWER 3, INCENERATOR COOLING N0277 101-NC EMERGENCY LIGHT FL:STAIRWELL\HALLWAY LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N8862 101-NC EMERGENCY LIGHT FL:STAIRWELL\HALLWAY LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N8863 101-NC EMERGENCY LIGHT FL:STAIRWELL\HALLWAY LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N8864 101-NC EMERGENCY LIGHT FL:STAIRWELL\HALLWAY LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N8865 101-NC EMERGENCY LIGHT FL:STAIRWELL\HALLWAY LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N8866 101-NC EMERGENCY LIGHT FL:STAIRWELL\HALLWAY LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N8867 101-NC EMERGENCY LIGHT FL:HALLWAY\STAIRWELL LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N0280 102-NC EMERGENCY LIGHT FL:HALLWAY\STAIRWELL LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N0282 103-NC EMERGENCY LIGHT FL:HALLWAY\STAIRWELL LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N0278 104-NC EMERGENCY LIGHT FL:HALLWAY\STAIRWELL LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N1170 108-NC EMERGENCY LIGHT FL:HALLWAY\STAIRWELL 103 LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N0279 105-NC EMERGENCY LIGHT FL:HALLWAY\STAIRWELL LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP
N0281 106-NC EMERGENCY LIGHT FL:HALLWAY\STAIRWELL LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP N8868 107-NC EMERGENCY LIGHT FL:HALLWAY\STAIRWELL LIGHTS, EMERGENCY, BUILDING, BATTERY BACKUP
N10150 101-NC ENCLOSURE,
BACKFLOW SUBLOC: CORNER OF FACILITES LN & GASOLINE ALLEY BACKFLOW ENCLOSURE WITH HOTBOX HEATER & ELECTRIC PANEL
N10151 101-NC ENCLOSURE,
BACKFLOW SUBLOC: GASOLINE ALLEY NORTH OF BLDG 108 BACKFLOW ENCLOSURE WITH HOTBOX HEATER & ELECTRIC PANEL
N10152 101-NC ENCLOSURE,
BACKFLOW SUBLOC: VALVE PIT#1, WEST OF CUP BACKFLOW ENCLOSURE WITH HOTBOX HEATER & ELECTRIC PANEL
N10153 101-NC ENCLOSURE,
BACKFLOW SUBLOC: VALVE PIT#6 WEST OF BLDG 101 MAIN ENTRANCE BACKFLOW ENCLOSURE WITH HOTBOX HEATER & ELECTRIC PANEL
N10154 101-NC ENCLOSURE,
BACKFLOW SUBLOC: VALVE PIT#7, EAST SIDE OF BLDG 103 BACKFLOW ENCLOSURE WITH HOTBOX HEATER & ELECTRIC PANEL
N7589 101-NC ENCLOSURE,
BACKFLOW SUBLOC: AXCESS RD TO A LOADING DOCK ON CORNER BACKFLOW ENCLOSURE WITH HOTBOX HEATER & ELECTRIC PANEL
N7650 105-NC EXHAUST FAN ROOF EXHAUST FAN 1, 1.5 HP, 7K CFM
N7651 105-NC EXHAUST FAN ROOF EXHAUST FAN 10, 5HP, 30000 CFM
N7652 105-NC EXHAUST FAN ROOF EXHAUST FAN 11, 5HP, 30000 CFM
N7653 105-NC EXHAUST FAN ROOF EXHAUST FAN 12, 5HP, 30000 CFM
N7654 105-NC EXHAUST FAN ROOF EXHAUST FAN 13, 5HP, 30000 CFM, BELT(2)A-89
N7655 105-NC EXHAUST FAN ROOF EXHAUST FAN 14, 5HP, 30000 CFM, BELT(2)A-89
N0314 105-NC EXHAUST FAN ROOF EXHAUST FAN 1A, 2HP, 005002176, BELT(2)A-43
N0315 105-NC EXHAUST FAN ROOF EXHAUST FAN 1B, 2HP, 005000638, BELT(2)A-45
N0316 105-NC EXHAUST FAN ROOF EXHAUST FAN 1C, 2HP, 005002174
N0317 105-NC EXHAUST FAN ROOF EXHAUST FAN 1D, 2HP, 005001104
N7656 105-NC EXHAUST FAN ROOF EXHAUST FAN 2, 1.5 HP, 7K CFM
N7657 105-NC EXHAUST FAN ROOF EXHAUST FAN 2A, 16.83 KCFM, 1.5HP, 05002179
N7658 105-NC EXHAUST FAN ROOF EXHAUST FAN 2B, 16.83 KCFM, 1.5HP
N7659 105-NC EXHAUST FAN ROOF EXHAUST FAN 2C, 16.83 KCFM, 1.5HP
N7660 105-NC EXHAUST FAN ROOF EXHAUST FAN 2D, 16.83 KCFM, 1.5HP
N7661 105-NC EXHAUST FAN ROOF EXHAUST FAN 3, 1.5 HP, 7K CFM
N3711 105-NC EXHAUST FAN ROOF EXHAUST FAN 4, 2HP, 05001996
N7662 105-NC EXHAUST FAN ROOF EXHAUST FAN 4, 1.5 HP, 7K CFM
N3712 105-NC EXHAUST FAN ROOF EXHAUST FAN 5, 2HP, 05001997
N7663 105-NC EXHAUST FAN ROOF EXHAUST FAN 5, 5HP, 30K CFM
N7664 105-NC EXHAUST FAN ROOF EXHAUST FAN 6, 5HP, 30K CFM
N7665 105-NC EXHAUST FAN ROOF EXHAUST FAN 7, 5HP, 30K CFM
N7666 105-NC EXHAUST FAN ROOF EXHAUST FAN 8, 5HP, 30K CFM, BELT(2)A-89
N7667 105-NC EXHAUST FAN ROOF EXHAUST FAN 9, 5HP, 30K CFM
N0775 106-NC EXHAUST FAN ROOF I106 EXHAUST FAN 1, 9150 CFM, 480 V, 1.5 HP
N0776 106-NC EXHAUST FAN ROOF I106 EXHAUST FAN 2, 15000 CFM, 480 V, 3HP
N7939 106-NC EXHAUST FAN ROOF I101 EXHAUST FAN 3, 3000 CFM, 480 V, 1 HP
N7940 106-NC EXHAUST FAN ROOF I101 EXHAUST FAN 3A, 4800 CFM, 480 V, 2HP
N7941 106-NC EXHAUST FAN ROOF I102 EXHAUST FAN 4, 1750 CFM, 120 V, 1/4 HP
N7942 106-NC EXHAUST FAN ROOF I103 EXHAUST FAN 4A, 80 CFM, 120 V, 1/40 HP
N7943 106-NC EXHAUST FAN ROOF I103 EXHAUST FAN 4B, 80 CFM, 120 V, 1/40 HP
N7944 106-NC EXHAUST FAN ROOF I104 EXHAUST FAN 4C, 680 CFM, 120 V, 1/8 HP
N7945 106-NC EXHAUST FAN ROOF I106 EXHAUST FAN 5
N7946 106-NC EXHAUST FAN ROOF I106 EXHAUST FAN 5A
N0800 107-NC EXHAUST FAN ROOF EXHAUST FAN, BUILDING EXHAUST
N0801 107-NC EXHAUST FAN ROOF EXHAUST FAN, BUILDING EXHAUST
N0802 107-NC EXHAUST FAN ROOF EXHAUST FAN, BUILDING EXHAUST
N0803 107-NC EXHAUST FAN ROOF EXHAUST FAN, BUILDING EXHAUST
N0804 107-NC EXHAUST FAN ROOF EXHAUST FAN, BUILDING EXHAUST
N7948 106-NC EYE WASH FL:01 SUBLOC:INCENERATOR RM, SOUTHWALL BY DOOR EYEWASH
N7706 105-NC FACILITY HVAC FL:01 P117 VENT LOUVER BANK P117-1
N7707 105-NC FACILITY HVAC FL:01 P117 VENT LOUVER BANK P117-2
N7708 105-NC FACILITY HVAC FL:01 P117 VENT LOUVER BANK P117-3
N7709 105-NC FACILITY HVAC FL:01 P124 FILTERED LOUVER BANK P124-1
N7710 105-NC FACILITY HVAC FL:01 P124 FILTERED LOUVER BANK P124-2
N7711 105-NC FACILITY HVAC FL:01 P124 FILTERED LOUVER BANK P124-3
N7712 105-NC FACILITY HVAC FL:01 P124 FILTERED LOUVER BANK P124-4
N7713 105-NC FACILITY HVAC FL:01 P124 FILTERED LOUVER BANK P124-5
N7930 106-NC FACILITY HVAC FL:01 I102 MOTORIZED DAMPER W/ FILTERS, D-A, 54"x18"X20", 1300CFM N7934 106-NC FACILITY HVAC FL:01 I101 MOTORIZED DAMPER W/ FILTERS, D-C, 72"x24"X20", 2400CFM N7935 106-NC FACILITY HVAC FL:01 I101 MOTORIZED DAMPER W/ FILTERS, D-A, 72"x24"X20", 2400CFM, 0600646
N7936 106-NC FACILITY HVAC FL:01 I106 MOTORIZED DAMPER W/ FILTERS,
N7953 106-NC FACILITY HVAC FL:01 I106 MOTORIZED DAMPER FOR LARGE INCINERATOR
N1370 105-NC FAN COOLING TOWER #1 FAN, CT1, CELL A, 5003351
N1369 105-NC FAN COOLING TOWER #1 FAN, CT1, CELL B, 5003350
N1368 105-NC FAN COOLING TOWER #1 FAN, CT1, CELL C, 5003349
N0642 105-NC FAN COOLING TOWER #2 FAN, CT2, CELL A, 5003514
N0643 105-NC FAN COOLING TOWER #2 FAN, CT2, CELL B, 5003515
N0644 105-NC FAN COOLING TOWER #2 FAN, CT2, CELL C, 5003516
N0645 105-NC FAN COOLING TOWER #2 FAN, CT2, CELL D, 5003517
N7698 105-NC FAN FL:01 BREAK ROOM SUBLOC:OVERHEAD P116 FAN, IN-LINE FAN 1, RETURN FOR NP_AHU-1, 5010 CFM, 3 HP, 05001457
N7845 105-NC FAN FL:01 P123 SUPPLY VENT FAN 1, 5HP, 20K CFM, 005003694
N7846 105-NC FAN FL:01 P123 SUPPLY VENT FAN 2, 5HP, 20K CFM, 005003695
N7931 106-NC FAN FL:01 SUBLOC:SOUTHSIDE OF BLDG I101 DOOR AIR CURTAIN, 9000 CFM, 2.2 HP, 06000648 N7932 106-NC FAN FL:01 SUBLOC:SOUTHSIDE OF BLDG I107 DOOR AIR CURTAIN, MODEL AH-56, 56,250 CFM, 30 HP, 480 V, 06001458 N7933 106-NC FAN FL:01 I107 DOOR AIR CURTAIN, MODEL AH-56, 56,250 CFM, 30 HP, 480 V, 06000472
N9090 105-NC FILTER FL:01 P123 TOWER 1, CDW SIDE STREAM SEPARATOR, LAKOS FILTRATION M#HTH-1950V S#57732-
N8446 101-NC FILTER BANK FL:C00 GENERATOR RM SUBLOC:AIR INTAKES FILTER BANK, FRESH AIR INTAKES FOR GENERATOR ROOM (24X24)FILTER MEDIA
N8445 101-NC FILTER BANK FL:C00 TRANSFORMER RM SUBLOC:AIR INTAKES FILTER BANK, FRESH AIR INTAKES FOR ELECTRICAL TRANSFORMER ROOM
(24X24)FILTER MEDIA
N0849 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0850 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0851 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0852 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0853 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0854 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0855 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0856 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0857 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0858 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0859 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0860 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0861 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0862 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0863 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0864 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0865 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0866 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0867 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0868 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0869 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0387 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0388 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0393 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0385 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0399 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0400 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0395 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0396 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0397 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0398 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0389 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0390 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0392 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0394 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0401 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N0402 NC-General FIRE HYDRANT ROADS & GROUNDS HYDRANT, FIRE N7831 105-NC FUEL OIL SYSTEM FL:01 P121 PETROTAPE UNIT FOR FO STORAGE TANKS #1 AND #2 N8447 101-NC FUEL OIL SYSTEM FL:01 C-VAULT, GENERATOR ROOM C055 FUEL OIL SYSTEM, BLD 101 EMERGENATOR GENERATORS
N7823 105-NC FUEL OIL SYSTEM FL:01 NORTH PLANT P117 FUEL OIL SYSTEM
N7863 105-NC FUEL OIL SYSTEM FL:01 SOUTH PLANT P124 FUEL OIL SYSTEM
N9855 105-NC GAUGE FL:01, EPA CHILLER ROOM - SOUTH P112 Condenser Water In Temp gauge N9929 105-NC GAUGE FL:01, NIEHA BOILER ROOM - NORTH P112 Natural Gas Pressure Indicator, Range 0-60 psig, ASHCROFT N9930 105-NC GAUGE FL:01, NIEHA BOILER ROOM - NORTH P112 Natural Gas Pressure Guage for Burner, Range 0 - 10 psig, WIKA N9719 105-NC GAUGE FL:01, North Plant Chiller Room P112 Onicon Flow Meter, 24" CH-2 CDW Return, Range 0-20,000 GPM N9720 105-NC GAUGE FL:01, North Plant Chiller Room P112 Chiller 3 CDW Supply Temperature N9721 105-NC GAUGE FL:01, North Plant Chiller Room P112 Chiller 3 CDW Return Temperature N9722 105-NC GAUGE FL:01, North Plant Chiller Room P112 Condenser Water In Pressure Gauge N9723 105-NC GAUGE FL:01, North Plant Chiller Room P112 Condenser Water In Temp gauge N9724 105-NC GAUGE FL:01, North Plant Chiller Room P112 Condenser Water Out Temp Gauge N9725 105-NC GAUGE FL:01, North Plant Chiller Room P112 Chilled Water Return Pressure Gauge N9726 105-NC GAUGE FL:01, North Plant Chiller Room P112 Chilled Water Return Temp Gauge N9727 105-NC GAUGE FL:01, North Plant Chiller Room P112 Chilled Water Supply Pressure Gauge N9728 105-NC GAUGE FL:01, North Plant Chiller Room P112 Chilled Water Supply Temp Gauge N9729 105-NC GAUGE FL:01,…