Attachment 3 - Schedule of Supplies.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- SP3300-21-Q-0045
- Issued by
-
Defense Logistics Agency Distribution
About this file
This attachment to a federal solicitation provides pricing details for a sheet metal cassette storage rack system and related demolition and assessment services. The Defense Logistics Agency is seeking firm-fixed pricing to supply and install a new sheet metal rack storage system with 21 storage cassettes and rollable depalletizing stations, along with a gravity pallet conveyor system, in-line scale, vac-hoist bridge, and floor scale. The solicitation also includes options to demolish existing rack rows and sprinkler systems, and to demolish sections of pallet racking and modify an in-rack sprinkler system. Responses are due 270 days after award for the base requirements, with options to be completed 90-180 days later. However, pricing is listed as TBD, indicating this is an attachment seeking pricing details rather than a final solicitation document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Drawings - revised 18 May 21.pdf | ||
| Amendment 0002.pdf | ||
| Attachment 1 - SOW - revised 18 May 21.pdf | ||
| Site Visit Roster.pdf | ||
| Amendment 1.pdf | ||
| RFQ SP330021Q0045.pdf | ||
| Attachment 2 - Drawings.pdf | ||
| Attachment 1 - SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
ATTACHMENT 3 - SCHEDULE OF SUPPLIES SP3300-21-Q-0045
| CLIN | DESCRIPTION | QTY | UNIT ISSUE | UNIT PRICE | TOTAL PRICE |
| 0001 | SHEET METAL STORAGE RACK SYSTEM | 1 | ea | ||
| Breakdown of CLIN 0001 - Not Separately Priced (NSP) | |||||
| Supply and Install Sheet Metal Rack Storage Towers with 21 each 12’ x 5’ Storage Cassettes | 36 | ea | NSP | NSP | |
| Rollable Depalletizing Stations | 2 | ea | NSP | NSP | |
| Delivery: 270 Days After Date of Contract Award | |||||
| Total Price for CLIN 0001 | $ - 0 |
| 0002 | SHEET METAL PALLET PACKING SYSTEM | 1 | ea | ||
| Breakdown of CLIN 0002 - Not Separately Priced (NSP) | |||||
| Supply and Install 45 ft. gravity pallet conveyor | 1 | ea | NSP | NSP | |
| In-Line Pallet Scale Mounted on Middle Pallet Conveyor Section | 1 | ea | NSP | NSP | |
| Supply and install one vacu-hoist system with a 45 ft. long, 10 ft. wide bridge support structure. | 1 | ea | NSP | NSP | |
| Sheet Metal Storage Cassette Floor Mounted Scale to Weigh Pallets Prior to Storage in the System | 1 | ea | NSP | NSP | |
| Workstation tables with two 20 amp quadruplex 120 volt outlets | 2 | ea | NSP | NSP | |
| Delivery: 270 Days After Date of Contract Award | |||||
| Total Price for CLIN 0002 | $ - 0 |
| 0003 | Floor Capacity Study | 1 | ea | |
| Delivery: 270 Days After Date of Contract Award | ||||
| Total Price for CLIN 0003 | $ - 0 |
| 0004 | DEMO OF RACK ROWS 1-4 AND IN-RACK SPRINKLER SYSTEM | 1 | ea | ||
| Breakdown of OPTION CLIN 0004 - Not Separately Priced (NSP) | |||||
| Demo pallet rack rows 1-4 and in-rack sprinkler system | 102 | sections | NSP | NSP | |
| Delivery: 90 Days After Date of Contract Award | |||||
| The Government reserves the right to award the OPTION CLIN 0004 up to 180 days after the initial contract award. | |||||
| Total Price for CLIN 0004 | $ - 0 |
| 0005 | DEMO 1.5 RACK SECTIONS OF PALLET RACK AT THE SOUTH END OF RACK ROWS 5-12 AND IN-RACK SPRINKLER SYSTEM PIPING | 1 | ea |
| Breakdown of OPTION CLIN 0005 - Not Separately Priced (NSP) | |||
| Demo 1.5 rack sections of pallet rack at the south end of rows |
5-13 and reinstall sprinkler headers to rack systems to make the
| in-rack sprinkler system operational. | 13.5 | sections | NSP | NSP | |
| Delivery: 60 Days After Date of Contract Award | |||||
| The Government reserves the right to award the OPTION CLIN 0005 up to 180 days after the initial contract award. | |||||
| Total Price for CLIN 0005 | $ - 0 |
TOTAL PRICE FOR ALL CLINS (0001-0005) $ - 0
File details come from the government source that posted it. Updated .