Attachment 3 (Sample Construction Cost Proposal Form).xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- CDC, Floorcovering Replacement at Chamblee and Roybal Campuses Federal contract opportunity
- Solicitation number
- 75D30123R72604
About this file
This document contains a sample construction cost proposal form and details of a related federal contract opportunity for floorcovering replacement services. The Centers for Disease Control and Prevention intends to make a single award of a firm fixed price construction contract for replacing flooring at select buildings on their Chamblee and Roybal campuses in Atlanta, Georgia. The cost proposal form provides a template for contractors to submit pricing for various flooring replacement line items at multiple buildings, including materials, labor, taxes, overhead, profit, and bonding. Items include different flooring types such as carpet, luxury vinyl tile, stair nosing, as well as preparatory work, adhesive, lifting costs, dumpster fees, and other expenses. The solicitation number is 75D30123R72604 and responses are due by the date specified in the related solicitation, which was not provided in this sample document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 00001 final.pdf | ||
| Attachment 6 (Specifications - COVER PAGE ONLY).pdf | ||
| Attachment 5 (Contractor Employee Non-Disclosure Agreement).docx | DOCX document | |
| Attachment 2 (Wage Determination).pdf | ||
| Attachment 1 (Statement of Work).pdf | ||
| Attachment 7 (Drawings - COVER PAGE ONLY).pdf | ||
| A19 - Solicitation Document.pdf | ||
| Attachment 4 (Contractor Non-Disclosure Agreement).docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONSTRUCTION COST PROPOSAL FORM | ||||||||
| Project No/Name: Chamblee Flooring Project | ||||||||
| No | ITEMS | MATERIALS | LABOR | |||||
| Quantity | Cost/ unit | Total | Hours | Cost/ hr | Total | TOTAL COST |
| 1 | Chamblee Campus - Building 103 | |||
| 2 | Note: Include 3% Attic Stock | |||
| 3 | CPT-1 | |||
| 4 | CPT-1 Attic Stock | |||
| 5 | CPT-2 | |||
| 6 | COT-2 Attic Stock | |||
| 7 | LVT-1 | |||
| 8 | LVT-1 Attic Stock | |||
| 9 | Lifting Cost | |||
| 10 | Demo | |||
| 11 | Flooring Preparation | |||
| 12 | Adhesive | |||
| 13 | Other - ?? | |||
| 14 | ||||
| 15 | Chamblee Campus - Building 107 | |||
| 16 | Note: Include 3% Attic Stock | |||
| 17 | CPT-1 | |||
| 18 | CPT-1 Attic Stock | |||
| 19 | LVT-1 | |||
| 20 | LVT-1 Attic Stock | |||
| 21 | Lifting Cost | |||
| 22 | Demo | |||
| 23 | Flooring Preparation | |||
| 24 | Adhesive | |||
| 25 | Other - ?? | |||
| 26 | ||||
| 27 | Chamblee Campus - Building 109 | |||
| 28 | Note: Include 3% Attic Stock | |||
| 29 | CPT-1 | |||
| 30 | CPT-1 Attic Stock | |||
| 31 | CPT-2 | |||
| 32 | CPT-2 Attiic Stock | |||
| 33 | LVT-1 | |||
| 34 | LVT-1 Attic Stock | |||
| 35 | B-1 | |||
| 36 | B-1 Attic Stock | |||
| 37 | Lifting Cost | |||
| 38 | Demo | |||
| 39 | Flooring Preparation | |||
| 40 | Adhesive | |||
| 41 | Other - ?? | |||
| 42 | ||||
| 43 | Roybal Campus - Building 17 | |||
| 44 | Note: Include 3% Attic Stock | |||
| 45 | LVT-1 | |||
| 46 | LVT-1 Attic Stock | |||
| 47 | Demo | |||
| 48 | Flooring Preparation | |||
| 49 | Adhesive | |||
| 50 | Other - ?? | |||
| 51 | ||||
| 52 | Roybal Campus - Building 16 | |||
| 53 | Note: Include 3% Attic Stock | |||
| 54 | CPT-1 | |||
| 57 | CPT-1 Attiic Stock | |||
| 58 | LVT-1 | |||
| 59 | LVT-1 Attic Stock | |||
| 60 | B-1 | |||
| 61 | B-1 Attic Stock | |||
| 62 | Lifting Cost | |||
| 63 | Demo | |||
| 64 | Flooring Preparation | |||
| 65 | Adhesive | |||
| 66 | Other - ?? | |||
| 67 | ||||
| 68 | Roybal Campus - Building 19 | |||
| 69 | Note: Include 2% Attic Stock | |||
| 70 | CPT-1 | |||
| 71 | CPT-1 Attic Stock | |||
| 72 | CPT-2 | |||
| 73 | CPT-2 Attiic Stock | |||
| 74 | CPT-3 | |||
| 75 | CPT-3 Attic Stock | |||
| 76 | CPT-4 | |||
| 77 | CPT-4 Attic Stock | |||
| 78 | CPT-5 | |||
| 79 | CPT-5 Attic Stock | |||
| 80 | CPT-6 | |||
| 81 | CPT-6 Attic Stock | |||
| 82 | CPT-7 | |||
| 83 | CPT-7 Attic Stock | |||
| 84 | LVT_! | |||
| 85 | LVT-1 Attic Stock | |||
| 86 | B-1 | |||
| 87 | B-1 Attic Stock | |||
| 88 | Stair Nosing/Risers | |||
| 89 | Stair Nosing/Risers Attic Stock | |||
| 90 | Lifting Cost | |||
| 91 | Flooring Preparation | |||
| 92 | Adhesive | |||
| 93 | Other - ?? | |||
| 94 | ||||
| 95 | Roybal Campus - Building 21 | |||
| 96 | CPT-1 | |||
| 97 | LVT_! | |||
| 98 | B-1 | |||
| 99 | B-1 Attic Stock | |||
| 100 | Lifting Cost | |||
| 101 | Demo | |||
| 102 | Flooring Preparation | |||
| 103 | Adhesive | |||
| 104 | Other - ?? | |||
| 105 | ||||
| 106 | General | |||
| 107 | Dumpster | |||
| 108 | Other - ?? | |||
| 109 | ||||
| 110 | DIRECT CONSTRUCTION COST | Materials Total | Labor Total | |
| 111 | ||||
| 112 | MATERIALS SALES TAX (If Applicable) | ????? | ||
| 113 | subtotal | |||
| 114 | CONTRACTOR LABOR, FICA, & OTHER | |||
| 115 | subtotal | |||
| 116 | CONTRACTOR OVERHEAD | |||
| 117 | subtotal | |||
| 118 | CONTRACTOR PROFIT | |||
| 119 | subtotal | |||
| 120 | BOND | |||
| 121 | subtotal | |||
| 122 | GRAND TOTAL COST |
File details come from the government source that posted it. Updated .