Attachment 3_Quote Sheet_FA813225Q0038.pdf

PDF 248 KB Posted

Attached to
CANCELED***X-Ray Producing System Maintenance
Solicitation number
FA813225Q0038
Issued by

About this file

This is a Solicitation for X-Ray Producing System Preventive and Remedial Maintenance at Tinker Air Force Base in Oklahoma, Solicitation # FA813225Q0038. The contract covers maintenance services for X-Ray Producing Systems across three maintenance groups: Aircraft Maintenance (AMXG), Commodities Maintenance (CMXG), and Propulsion Maintenance (PMXG) at the Oklahoma City Air Logistics Complex. The solicitation includes a base year from 1 Feb 2026 to 31 Jan 2027 and four additional option years, with each year containing two Contract Line Item Numbers (CLINs) for Preventive Maintenance (PM) and Remedial Maintenance (RM). Estimated annual remedial maintenance hours vary by maintenance group: 10 hours for AMXG, 32 hours for CMXG, and 20 hours for PMXG. Contractors must provide a fully-burdened labor rate, submit invoices through Wide Area Workflow (WAWF), and obtain Contracting Officer approval before performing remedial maintenance. All quotes must be valid for at least 90 days, with NET 30 payment terms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X-RAY PRODUCING SYSTEM

PREVENTIVE AND REMEDIAL MAINTENANCE

Tinker AFB, OK Solicitation # FA813225Q0038

Offerors are REQUIRED to return the portion of this CSS below with the completed information and authorized signature. Offeror may provide their company’s quotation sheet in addition to this response page.

SECTION 1 – OFFEROR INFORMATION

Company Name Address

CAGE Code and UEI Number

The Government cannot enter into contracts or agreements with contractors not registered in SAM. For registration information, visit the SAM website (https://www.sam.gov/) and follow the instructions in the Quick Start Guide For SAM Registration, which can be found under the Help Tab and User Guides submenu.

Small Business Size Web Page URL Point of Contact POC Phone # and email address

SECTION 2 – SERVICES AND PRICE

BASE YEAR

CLIN

Description/Product

Qty

Unit Price

Total Annual Price

0001AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

AMXG

BASE YEAR: 1 Feb 2026 – 31 Jan 2027

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Preventive Maintenance (PM) on the 76th Aircraft Maintenance Group’s (76 AMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

The Contractor shall be responsible for ensuring all services, parts, and Original Equipment Manufacturer (OEM) components provided under this contract are IAW the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and the PWS.

2 EA $ $

0001AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

AMXG

BASE YEAR: 1 Feb 2026 – 31 Jan 2027

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Remedial Maintenance (RM) on the 76th Aircraft Maintenance Group’s (76 AMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

LABOR RATE: $ _______________

Estimated 10 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

Prior to any RM request work, approval must be granted by the Contracting Officer (CO) before the Contractor can start work.

The Contractor shall be responsible for ensuring all services and parts provided under this contract are IAW the terms and conditions outlined in the contract and its attachments and conform to the manufacturer's equipment specifications.

The Contractor may be required to ship broken parts back to Contractor's facility for repair, if necessary.

All reimbursements will be paid in arrears of RM services.

Advance payments will not be authorized.

The Contractor is not entitled to the entire amount of this CLIN, but only in the amount approved by the CO.

Invoicing – The Contractor shall submit invoices in arrears of services provided using the Wide Area Workflow e-Business Suite (WAWF) Online Application, which can be found in the Procurement Integrated Enterprise Environment (PIEE;

https://wawf.eb.mil). Complete invoicing information will be found in DFARS Clause 252.232-7006, Wide Area Workflow Payment Instructions.

1 Lot DO NOT

COMPLETE THIS

BLOCK.

MULTIPLY YOUR

FULLY-BURDENED

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

ABOVE.

CLIN Description/Product Qty Unit Price Total Annual Price

0002AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

CMXG

BASE YEAR: 1 Feb 2026 – 31 Jan 2027

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Preventive Maintenance (PM) on the 76th Commodities Maintenance Group’s (76 CMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

The Contractor shall be responsible for ensuring all services, parts, and Original Equipment Manufacturer (OEM) components provided under this contract are IAW the terms

0002AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

CMXG

BASE YEAR: 1 Feb 2026 – 31 Jan 2027

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Remedial Maintenance (RM) on the 76th Commodities Maintenance Group’s (76 CMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

LABOR RATE: $ _______________

Estimated 32 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

Prior to any RM request work, approval must be granted by the Contracting Officer (CO) before the Contractor can start work.

The Contractor shall be responsible for ensuring all services and parts provided under this contract are IAW the terms and conditions outlined in the contract and its attachments and conform to the manufacturer's equipment specifications.

The Contractor may be required to ship broken parts back to Contractor's facility for repair, if necessary.

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

All reimbursements will be paid in arrears of RM services.

Advance payments will not be authorized.

The Contractor is not entitled to the entire amount of this CLIN, but only in the amount approved by the CO.

Invoicing – The Contractor shall submit invoices in arrears of services provided using the Wide Area Workflow e-Business Suite (WAWF) Online Application, which can be found in the Procurement Integrated Enterprise Environment (PIEE;

https://wawf.eb.mil). Complete invoicing information will be found in DFARS Clause 252.232-7006, Wide Area Workflow Payment Instructions.

The Contractor may be required to ship broken parts back to Contractor's facility for repair, if necessary.

0003AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

PMXG

BASE YEAR: 1 Feb 2026 – 31 Jan 2027

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Preventive Maintenance (PM) on the 76th Propulsion Maintenance Group’s (76 PMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

The Contractor shall be responsible for ensuring all services, parts, and Original Equipment Manufacturer (OEM) components provided under this contract are IAW the terms

0003AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

BASE YEAR: 1 Feb 2026 – 31 Jan 2027

NON-PERSONAL SERVICES: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform Remedial Maintenance (RM) on the 76th Propulsion Maintenance Group’s (76 PMXG) X-Ray Producing Systems in the Oklahoma City Air Logistics Complex (OC-ALC), Tinker AFB, OK, in accordance with (IAW) with the Performance Work Statement (PWS; Attachment 1). Equipment to be serviced is listed in the Equipment List. (Attachment 2)

LABOR RATE: $ _______________

Estimated 20 hours of RM per Year.

Rate must be a fully-burdened labor rate.

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

OPTION YEAR 1

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

Prior to any RM request work, approval must be granted by the Contracting Officer (CO) before the Contractor can start work.

The Contractor shall be responsible for ensuring all services and parts provided under this contract are IAW the terms and conditions outlined in the contract and its attachments and conform to the manufacturer's equipment specifications.

The Contractor may be required to ship broken parts back to Contractor's facility for repair, if necessary.

All reimbursements will be paid in arrears of RM services.

Advance payments will not be authorized.

The Contractor is not entitled to the entire amount of this CLIN, but only in the amount approved by the CO.

Invoicing – The Contractor shall submit invoices in arrears of services provided using the Wide Area Workflow e-Business Suite (WAWF) Online Application, which can be found in the Procurement Integrated Enterprise Environment (PIEE;

https://wawf.eb.mil). Complete invoicing information will be found in DFARS Clause 252.232-7006, Wide Area Workflow Payment Instructions.

1001AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

AMXG

OPTION 1: 1 Feb 2027 – 31 Jan 2028

*Please refer to CLIN 0001AA (base year) for description of services.

1001AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

AMXG

OPTION 1: 1 Feb 2027 – 31 Jan 2028

LABOR RATE: $ _______________

Estimated 10 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

*Please refer to CLIN 0001AB (base year) for description of

1 LOT DO NOT

FULLY-BURDENED

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

OPTION YEAR 2

1002AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

CMXG

OPTION 1: 1 Feb 2027 – 31 Jan 2028

*Please refer to CLIN 0002AA (base year) for description of

1002AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

CMXG

OPTION 1: 1 Feb 2027 – 31 Jan 2028

LABOR RATE: $ _______________

Estimated 32 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

*Please refer to CLIN 0002AB (base year) for description of

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

ABOVE.

1003AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

PMXG

OPTION 1: 1 Feb 2027 – 31 Jan 2028

*Please refer to CLIN 0003AA (base year) for description of services

1003AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

PMXG

OPTION 1: 1 Feb 2027 – 31 Jan 2028

LABOR RATE: $ _______________

Estimated 20 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

*Please refer to CLIN 0003AB (base year) for description of

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

2001AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

AMXG

OPTION 2: 1 Feb 2028 – 31 Jan 2029

2001AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

AMXG

OPTION 2: 1 Feb 2028 – 31 Jan 2029

LABOR RATE: $ _______________

Estimated 10 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

*Please refer to CLIN 0001AB (base year) for description of services.

1 LOT DO NOT

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

ABOVE.

2002AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

CMXG

OPTION 2: 1 Feb 2028 – 31 Jan 2029

2002AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

CMXG

OPTION 2: 1 Feb 2028 – 31 Jan 2029

LABOR RATE: $ _______________

Estimated 32 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

ABOVE.

2003AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

PMXG

OPTION 2: 1 Feb 2028 – 31 Jan 2029

2003AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

PMXG

OPTION 2: 1 Feb 2028 – 31 Jan 2029

LABOR RATE: $ _______________

Estimated 20 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

1 LOT DO NOT

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

OPTION YEAR 3

COLUMN) AND

PUT THE TOTAL

3001AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

AMXG

OPTION 3: 1 Feb 2029 – 31 Jan 2030

3001AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

AMXG

OPTION 3: 1 Feb 2029 – 31 Jan 2030

LABOR RATE: $ _______________

Estimated 10 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

*Please refer to CLIN 0001AB (base year) for description of services.

1 LOT DO NOT

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

ABOVE.

3002AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

CMXG

OPTION 3: 1 Feb 2029 – 31 Jan 2030

3002AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

CMXG

OPTION 3: 1 Feb 2029 – 31 Jan 2030

LABOR RATE: $ _______________

Estimated 32 hours of RM per Year.

not be more than the Labor Rate.

*Please refer to CLIN 0002AB (base year) for description of services.

1 LOT DO NOT

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

OPTION YEAR 4

3003AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

OPTION 3: 1 Feb 2029 – 31 Jan 2030

3003AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

PMXG

OPTION 3: 1 Feb 2029 – 31 Jan 2030

LABOR RATE: $ _______________

Estimated 20 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

4001AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

AMXG

OPTION 4: 1 Feb 2030 – 31 Jan 2031

4001AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

AMXG

OPTION 4: 1 Feb 2030 – 31 Jan 2031

LABOR RATE: $ _______________

Estimated 10 hours of RM per Year.

not be more than the Labor Rate.

*Please refer to CLIN 0001AB (base year) for description of

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

4002AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

CMXG

OPTION 4: 1 Feb 2030 – 31 Jan 2031

4002AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

CMXG

OPTION 4: 1 Feb 2030 – 31 Jan 2031

LABOR RATE: $ _______________

Estimated 32 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

ANNUAL PRICE

ABOVE.

4003AA X-RAY PRODUCING SYSTEM PREVENTIVE MAINTENANCE (PM)

PMXG

OPTION 4: 1 Feb 2030 – 31 Jan 2031

4003AB X-RAY PRODUCING SYSTEM REMEDIAL MAINTENANCE (RM)

PMXG

OPTION 4: 1 Feb 2030 – 31 Jan 2031

LABOR RATE: $ _______________

Estimated 20 hours of RM per Year.

Rate must be a fully-burdened labor rate.

TRAVEL LABOR RATE: $ _______________

This rate has no bearing on evaluation for award, but it will not be more than the Labor Rate.

LABOR RATE WITH

THE ESTIMATED

RM HOURS FOR

THE YEAR (IN RED

IN THE

DESCRIPTION

COLUMN) AND

PUT THE TOTAL

PRICING SUMMARY

Payment Terms / Discount Terms

NET 30 / _______% In _______ Days After Invoice Submission in WAWF

NOTES:

All quotes are valid for no less than 90 days.

SECTION 3 – CERTIFICATION OF RESPONSE

NAME OF OFFEROR’S REPRESENTATIVE TITLE

SIGNATURE DATE

Contractor is REQUIRED to sign this document and return 1 copy to issuing office. Contractor agrees to furnish and deliver all items set forth or otherwise identified above and on any additional sheets subject to the terms and conditions specified herein. Contractor is required to provide commercial product literature for all items quoted above as required/requested.

BASE YEAR

OPTION YEAR 1

OPTION YEAR 2

OPTION YEAR 3

OPTION YEAR 4

TOTAL PRICE

Base Year + Option Years

File details come from the government source that posted it. Updated .