Attachment 3 - Quality Assurance Surveillance Plan (QASP).pdf

PDF 278 KB Posted

Attached to
Potable Water Sampling & Analysis Services
Solicitation number
W51AA126QA081
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for a Drinking Water Sampling Contract at Tobyhanna Army Depot (TYAD), Contract Number 14 July 26. The contract is a Firm Fixed Price agreement with Contracting Officer Alicia Piercy and Contracting Officer's Representative Holly Halecki.

The contractor must provide comprehensive, regulatory-compliant drinking water sampling and analytical testing services at TYAD in strict alignment with the established Pennsylvania Department of Environmental Protection (PADEP) Sampling Plan under Public Water Systems ID PWS #2450053. The performing laboratory must maintain active PADEP certification for all required analytes and testing methodologies. Services include weekly sampling for Total Coliform, Escherichia coli, and Free Chlorine Residual; routine annual, quarterly, and tri-annual sampling for Synthetic Organic Compounds, Volatile Organic Compounds, Nitrate and Nitrite, Inorganic Compounds, Lead and Copper, Haloacetic Acids, Total Trihalomethanes, and Per and Polyfluoroalkyl Substances; and emergency sampling as directed. The contractor is solely responsible for entering, verifying, and submitting all analytical results into the PADEP Drinking Water Electronic Lab Reporting (DWELR) system within legally mandated regulatory timeframes, delivering completed laboratory reports in PDF format within 7-10 business days, and immediately notifying the Water Program Manager of any analytical results exceeding Maximum Contaminant Levels via telephone followed by email.

The Government will conduct surveillance using 100% inspection, random sampling, periodic inspection, and customer feedback mechanisms. The COR will submit monthly status reports by the 15th of each month documenting surveillance activities, performance analysis, and any nonconformances. Nonconformances are classified as Level 1 (Minor), Level 2 (Major) requiring a Corrective Action Plan, or Level 3 (Critical) representing serious internal control weaknesses with potential impact on contract performance. All surveillance documentation, including surveillance schedules, checklists, and nonconformance reports, will be maintained in the Procurement Integrated Enterprise Environment (PIEE) Surveillance and Performance Monitoring section. The QASP is a living document subject to change based on data analysis trends and contract modifications, with all changes requiring Contracting Officer approval.

View the file

Other files

File Type Posted
Attachment 2 - Wage Determination.pdf PDF
Attachment 1 - Performance Work Statement (PWS).docx DOCX document
Solicitation - W51AA126QA081.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan

For

Drinking Water Sampling Contract

Contract Number:

14 July 26

Contracting Officer: Alicia Piercy Purchasing Agent Contracting Specialist Tobyhanna Army Depot

Contracting Officer Representative (COR): Holly Halecki Environmental Protection Specialist Water Program Manager Tobyhanna Army Depot

TABLE OF CONTENTS

Subject Page Number

1. Overview……………………………………………………………………………………….1

2. Description of Services……………………………………………………………………

3. Roles and Responsibilities…………………………………………………………………….1

4. Contract Quality Requirements……………………………………………………………...2

5. Government Surveillance……………………………………………………………………..3

6. Nonconformance Reports (NCRs)…………………………………………………………

7. Deduct Plan…………………………………………………………………………………….5

8. Data Analysis…………………………………………………………………………………..5

9. Acceptance of Services………………………………………………………………………...6

10. COR Status Report………………………………………………………………………..…6

11. Contractor Manpower Reporting Application (CMRA)……………………………..…..6

12. Contractor Performance Assessment Reporting System (CPARS)…………………..…..6

13. Combating Trafficking in Persons………………………………………………………….6

14. COR/Quality Assurance Surveillance Files………………………………………………..6

15. QASP Changes……………………………………………………………………………….6

1. Overview.

1.1. Purpose. The purpose of this Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to ensure it receives the services under this contract as identified in the Performance Work Statement (PWS).

1.2. Intent. The intent of this QASP is to: 1) ensure Contractor performance meets or exceeds contract terms, conditions and specifications; 2) hold the Contractor accountable for quality control; and 3) encourage the Contractor to take appropriate steps to control and improve quality.

Accordingly, the Government will perform surveillance on the contract in accordance with this QASP but reserves the right to monitor the contract in any manner necessary, at any times necessary, and at all places necessary, to ensure that the rendered services conform to contract requirements. The Government also reserves the right to perform quality assurance at the Subcontractor level and perform quality assurance at the contractor's place of business, if applicable. Resolution of non-conforming services discovered at the Subcontractor level will be addressed with the prime Contractor.

2. Description of Services.

2.1. Scope of Work. The Contractor shall provide all personnel, equipment, tools, materials, supervision, quality control, and transportation necessary to execute a comprehensive, regulatory-compliant drinking water sampling and analytical testing program at Tobyhanna Army Depot (TYAD). All services must strictly align with the established TYAD Pennsylvania Department of Environmental Protection (PADEP) Sampling Plan under Public Water Systems

ID PWS #2450053.

The performing laboratory must maintain active certification by the Pennsylvania Department of Environmental Protection (PADEP) for all required analytes and testing methodologies.

The contractor is responsible for adapting to any regulatory changes, modifications, or updates mandated by the PADEP. These requirements are subject to change without prior notice aligning with state and federal environmental standards.

The contractor shall perform routine and specialized water sampling in accordance with the specified frequencies below (NOTE: these requirements can change at any time per PADEP regulations):

• Weekly Sampling – Total Coliform, Escherichia coli (E. coli), and Free Chlorine Residual.

• Routine (Annual, Quarterly, Tri-Annual per PADEP Sampling Requirements):

Synthetic Organic Compounds (SOCs), Volatile Organic Compounds (VOCs), Nitrate and Nitrite, Inorganic Compounds (IOCs), Lead and Copper, Haloacetic Acids (HAA5s), Total Trihalomethanes (TTHMs), Per and Polyfluoroalkyl Substances (PFAS) including PFOS, PFOA, PFNA, PFHxS, GenX, and PFBs.

• Emergency Sampling – Emergency sampling and expediated analytical services, as directed by the TYAD Water Program Manager, on an as-needed basis.

The contractor will be responsible for PADEP reporting and data submission (in Greenport).

• DWELR Submission – The Contractor is solely responsible for entering, verifying, and submitting all analytical results into the PADEP Drinking Water Electronic Lab Reporting (DWELR) systems within the legally mandated regulatory timeframe.

• Standard Deliverables – Completed laboratory analytical reports shall be transmitted electronically (must be in Adobe Acrobat PDF files) to the TYAD Water Program Manager within a reasonable contractually agreed-upon timeframe (typically within 7-10 business days after the analysis is completed).

• Exceedance Notification Protocol – In the event of any analytical result exceeding a Maximum Contaminant Level (MCL) or other regulatory action level, the Contractor shall immediately notify the TYAD Water Program Manager. Initial notification must be made via telephone call, followed immediately by an electronic email to the Water Program Manager.

2.2. Type of Contract: Firm Fixed Price Contract

1. Roles and Responsibilities. The COR is responsible for ensuring that the contractor performs the work required for this contract. This consists of the COR performing the following tasks:

a. The COR evaluates and documents contractor performance in accordance with the

QASP.

b. The COR notifies the KO of any significant performance deficiencies.

c. The COR recommends improvements to the QASP and throughout the life of the contract.

3.1. Government.

3.1.1. Contracting Officer (KO). The KO is the only person with the authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

3.1.2. Contracting Officer’s Representative (COR). The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies;

coordinate availability of Government furnished property and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regards to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

4. Contract Quality Requirements.

4.1. Contractor’s Quality Control Program. The Contractor’s quality control program (IAW FAR Part 46 and applicable 52.246 Clause(s)) is the means by which the Contractor assures that work complies with the requirement of the contract. The Contractor shall ensure services are performed in accordance with this PWS. The Contractor shall identify, prevent, and ensure non-recurrence of defective services.

4.2. Government Quality Assurance. The Government shall evaluate the Contractor’s performance under this contract in accordance with this QASP. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance and minimum acceptable defect rate(s).

5. Government Surveillance.

5.1. Methods of Surveillance. The following Methods of Surveillance will be utilized in monitoring the Contractors’ performance:

5.1.1. 100% Inspection

5.1.2. Random Sampling

5.1.3. Periodic Inspection

5.1.4. Customer Feedback. The following procedures will be followed when a complaint is received regarding the Contractor/Contractor Employees.

• The COR will investigate and determine the validity of the complaint.

• If the complaint is determined to be invalid, the COR will inform the person who submitted the complaint of the reason(s) as soon as practical.

• For validated complaints that are true contractual non-conformances, the procedures in paragraph 6 below will be followed.

5.2. Surveillance Schedule. A Surveillance Schedule will be created for each month of Contractor performance and filed in the Procurement Integrated Enterprise Environment (PIEE), Surveillance and Performance Monitoring (SPM), Surveillance Documents Section of the Contract File using the Add Smart Form function. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel.

5.3. Surveillance Instructions/Checklists. Surveillance Checklists will be completed when surveillances are conducted and filed in the PIEE, SPM, Surveillance Documents Section of the Contract File using the Add Smart Form function.

5.4. Surveillance Documentation. No later than the 15th of each month, surveillance documentation for the preceding month will be filed in the PIEE, SPM, Surveillance Documents Section. Surveillance documentation includes a COR Status Report, the Surveillance Schedule, all completed Surveillance Checklist(s) for the period the COR Status Report covers, Nonconformance Reports, if any, and Contractor Deliverables, if any.

6. Nonconformance Reports (NCRs). Nonconformance occurs when a Contractor fails to meet Contract or Task Order terms, conditions and/or specifications or the services are defective in some manner. All instances of nonconformance will be documented via a Nonconformance Report Worksheet, Attachment 2 and the Contracting Officer will notify the Contractor of the nonconforming performance via Letter. Resolution of nonconformance discovered at the Subcontractor level will be addressed with the prime Contractor. Nonconformance is classified as either: Level 1 (Minor); Level 2 (Major); or Level 3 (Critical). NCRs may contain multiple nonconformances, each characterized by a level and type. The level of the NCR should normally correspond to the highest level of nonconformance listed in the NCR. For example, if a NCR had one Level 3, one Level 2, and three Level 1 nonconformance’s, the NCR level would be Level 3. The exception might be when the aggregate of multiple nonconformances considered in whole associated to a more serious type of nonconformance defined in FAR 46.101 (e.g. if an NCR had three Level 2 nonconformances but the definition of critical nonconformance better describes the impact/effect when considered in whole, the NCR level would be 3).

6.1. Level 1 (Minor). Level 1 nonconformances are those that are ‘minor’ in nature such that they can be promptly corrected by the contractor, present no need for root cause analysis or determination if other contract requirements are affected, present no need for further preventive action, and do not materially reduce the usability of the supplies, services, construction, or deliverables. While the contractor must correct the nonconformance, further actions and Government follow-up are not required, and no written response from the contractor is needed.

6.2. Level 2 (Major). Level 2 nonconformance(s) are those that are ‘major’ in nature such that they are not promptly correctable, and/or warrant root cause analysis and preventive action, and/or need action by the contractor to determine if other contract requirements are affected.

These nonconformances are serious enough to warrant not only correction of the nonconformance, but also a written response from the contractor in the form of a Corrective Action Plan (CAP), and Government follow-up. The qualifying distinction between a Level 1 and Level 2 nonconformance is the need for a CAP and Government follow-up. A NCR identifying a Level 2 nonconformance may also be issued after repetitive Level 1 instances of the same or similar nonconformance demonstrate the contractor is failing to institute effective corrective action and/or failing to implement effective quality and/or internal control(s).

Repetitive Level 1/minor nonconformance of the same or similar requirement(s) increases the risk to the Government that continued, repetitious, or cumulative failures may materially reduce the usability of the supplies, services, construction, work, or deliverables for their intended purpose or is an indicator that root cause analysis and a CAP is required to fix the underlying conditions creating the nonconformance. Further, serious individual contractor employee misconduct discovered by the Government and traceable to contract requirements should normally result in a Level 2 nonconformance because the serious nature of misconduct necessitates contractor management to conduct root cause analysis, take preventive actions, and requires Government follow-up (characteristics of a Level 2 NCR). Further, issue a NCR with a Level 3 nonconformance for serious contractor employee misconduct only when there is a trend demonstrating a breakdown in contractor management or processes allowing serious misconduct to repetitively occur, or the misconduct poses a hazardous or unsafe condition for the personnel receiving the contracted supply, service, or construction, and misconduct can be traced to nonconformance of contract requirements.

6.3. Level 3 (Critical). Level 3 nonconformance(s) are those that are ‘critical’ in nature such that they represent a serious weakness in internal controls and/or have actual or potential significant impact(s) on contract performance and/or the supported unit/Government operations.

For these nonconformance(s), the qualifying distinction between a Level 2 and Level 3 nonconformance is the seriousness of the issue prompting the need for higher level management to address the nonconformance and resulting corrective action. Due to the nature of a Level 3 nonconformance, these types of nonconformance are candidates for contract remedies.

Therefore, before issuance of an NCR with a Level 3 nonconformance, consideration should be made whether an NCR or contract remedy is more appropriate. Issuing a Level 3 NCR in lieu of a contract remedy would normally be considered as the Government’s final attempt to work with the contractor to resolve a contractual nonconformance before contractual remedies are used.

However, issuance of a Level 3 NCR is not a requirement before using contractual remedies.

A NCR identifying a Level 3 nonconformance (or a contract remedy) may be issued after repetitive Level 2 instances of the same or similar nonconformance demonstrate the contractor is failing to institute effective corrective action or failing to implement effective quality/internal controls. Repetitive major nonconformances with the same or similar requirement(s) increase the risk to the Government that continued, repetitious, or cumulative failures may significantly impact the mission, or may result in hazardous/unsafe conditions.

6.4. Documenting NCRs. Use/fill out the Nonconformance Report Worksheet, Attachment 2, when nonconforming performance is identified. Documentation, as a minimum, will include: the Contract or Task Order number; reference to the specific contract requirement; the specific discrepancy to the requirement; where it was discovered; the date and time it was discovered; and the Contractor representative who was notified. Also, include a suspense date for Contractor response/corrective action for Level 2 and Level 3 NCRs. The Contracting Officer must ensure appropriate level review and approval of the NCR Worksheet and then address the NCR in Letter Format to the applicable level of Contractor management based on the seriousness of the nonconformance.

6.5. Tracking and Resolving NCRs. All NCRs will be included in the COR’s Status Report.

The Government considers Level 1 nonconformance closed as of the issuance of the Letter to the Contractor. However, your attention to address Level 1 Minor nonconformance is still required. Repetitive nonconformance of the same or similar requirement would be an indication the contractor failed to institute effective corrective action and/or failed to implement effective quality control and may result in a Level 2 NCR requiring submission of a CAP to the Government. The COR and KO shall track Level 2 and Level 3 NCRs to ensure the Contractor identifies and takes appropriate corrective action to the root cause and the specific nonconformance is corrected within the required timeline. The KO will make a final written determination of the Government’s remedies if the non-conformance is not corrected by the Contractor after receiving notice and a reasonable opportunity to correct the work.

7. Deduct Plan. This acquisition does not include a Deduct Plan.

8. Data Analysis. Data Analysis will be performed to identify trends in cost, schedule and/or performance risks. The results of Data Analysis will be documented in COR Status Reports and may be used to adjust surveillance schedules, increase or decrease surveillance, if deemed appropriate. Negative trends noted using Government data/observations could result in issuing the Contractor a Nonconformance Report.

Trends noted using Contractor data will not result in a Nonconformance Report unless the Contractor is not addressing the negative trend.

9. Acceptance of Services. When all services have been deemed acceptable and there is documented objective quality evidence to support acceptable performance the COR will accept the services provided and authorize payment of the Contractor. This is accomplished by approving the Contractor’s Receiving Reports in PIEE, WAWF.

10. COR Status Report. COR Status Reports will be submitted monthly, no later than the 15th of each month for the preceding frequency, to the Contracting Officer via PIEE, SPM, Surveillance Documents Section using the Add Smart Form function. COR Status Reports will provide a synopsis of the Contractors’ performance for the inclusive dates of the report. The synopsis will contain a summary of: surveillances performed; Customer Feedback, if any;

Nonconformance Reports, if any; an analysis of the Contractors’ performance; recommended adjustments to surveillance schedules; and any other pertinent contract information.

11. Contractor Manpower Reporting Initiative. In accordance with Office of the Secretary of Defense Memorandum, Revised Department of Defense Contractor Manpower Reporting Initiative, dated Oct 16, 2019, the Contractor must report contractor manpower to the System for Award Management website at https://www.sam.gov NLT 31 October each year. All data shall be reported in accordance with applicable Federal Acquisition Regulation and supplements. The COR shall verify that the Contactor has complied with the required contractor manpower reporting annually and document the results in their October COR Status Report.

12. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data (COR Status Reports, Completed Surveillance Checklists, Customer Feedback, Deliverables, if any, and Nonconformance Reports, if any) will be used to support CPARS ratings. CPARS will be completed in accordance with AFARS, Subpart 5142.15 – Contractor Performance Information. The COR shall document that CPARS, if required, was completed in the COR Status Report for the month in which the CPARS was completed.

13. Combating Trafficking in Persons (CTIP). In accordance with PGI 222.17 and FAR 52.222-50, the KO will be notified immediately of any information from any source that alleges a contractor employee, subcontractor and/or subcontractor employee has engaged in conduct that violates the United States Government “zero” tolerance policy regarding trafficking in persons.

14. COR/Quality Assurance Surveillance Files. The official COR/Quality Assurance Surveillance File will be maintained in PIEE, SPM IAW DoDI 5000.72, DoD Standard for COR Certification.

15. QASP Changes. This QASP is a living document and, as such, may be changed as needed based on Data Analysis (trends), contract modifications, etc. The COR will send any recommended changes to the KO for approval and the KO must approve all changes.

COR’s Signature: Holly Halecki Date: 14 July 26

Contracting Officer’s Signature:

Date: