Attachment 3_QASP.pdf
PDF 242 KB Posted
- Attached to
- MOBILITY PROTOTYPING
- Solicitation number
- N0016426RMP01
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a Task Order to provide Engineering and Professional Support Services to the Strategic and Theater Sealift Ships program office (PMS 385) under Solicitation No. N0016426RMP01. The QASP establishes the Government's systematic approach to monitor contractor performance and ensure compliance with the Statement of Work (SOW) and contractor quality control plan (QCP). Rather than focusing on compliance with processes, this results-oriented QASP evaluates whether the contractor achieves expected outcomes and performance objectives. The contractor is responsible for quality control of all work performed, including subcontractor work, through its own QCP. The Government will assess performance using the Contractor Performance Assessment Reporting System (CPARS) based on objective or measurable subjective data from sources including status reviews, cost performance reports, deliverable timeliness and accuracy, product quality, customer feedback, technical reviews, and configuration audits.
The evaluation structure requires the contractor to achieve at least a "Satisfactory" rating across five major elements: Quality of Product or Service, Cost Control and Reporting, Schedule and Timeliness, Management/Business Relations, and Regulatory Compliance. The initial QASP evaluation must be completed by the end of month ten of the base period, with the Contracting Officer's Representative (COR) submitting a written assessment by the end of week two of month ten and the Contracting Officer providing the overall rating by week four. Performance ratings include five levels (Exceptional, Very Good, Satisfactory, Marginal, and Unsatisfactory), with detailed criteria specified for each element. Surveillance methodologies include random monitoring, 100% inspection, periodic inspection, and customer feedback. Customer complaints must be submitted in writing with detailed specifications and signatures to the COR. The preliminary QASP evaluation rating will be used to determine whether to exercise Option periods under the task order. Formal CPARS evaluations are conducted annually.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N0016426RMP010001 SF 30.pdf | ||
| Exhibit A_CDRLs A001-A018.pdf | ||
| Solicitation - N0016426RMP01.pdf | ||
| Attachment 1_Past Performance Matrix.docx | DOCX document | |
| Attachment 2_Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. N0016426RMP01
QUALITY ASSURANCE SURVEILLANCE PLAN
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government-developed and applied document used to make sure the systematic quality assurance methods are used in the administration of this Task Order for Engineering and Professional Support Services to support the Strategic and Theater Sealift Ships program office (PMS 385). The intent is to ensure that the contractor performs in accordance with the performance objectives and the Government receives the quality of services called for in the contract.
The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards/quality levels identified in the SOW and the Contractor’s quality control plan (QCP).
This QASP defines the roles and responsibilities of Government personnel involved in the evaluation of the quality of contractor performance, identifies the performance objectives, and defines the methodologies used to monitor and evaluate the Contractor’s performance. The QASP also describes quality assurance documentation requirements and describes the analysis of quality assurance monitoring results.
2. AUTHORITY
Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance which provides for inspections and acceptance of the services and deliverables called for in service contracts to be executed by the Contracting Officer or a duly authorized representative.
3. SCOPE
The SOW structures the acquisition around "what" services or quality level is required, as opposed to "how" the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken to monitor and manage the Contractor’s performance to ensure the expected outcomes or performance objectives communicated in the SOW are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management, this analysis yields information that indicates whether expected outcomes for the project are being achieved by the Contractor.
Performance management represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A "results" focus provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor’s own QCP. Quality control is work output, not workers, and therefore includes all work performed under this task order regardless of whether the work is performed by Contractor employees or by Subcontractors.
The Contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the SOW. The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated Government representative. This QASP enables the Government to take advantage of the Contractor’s
QCP.
The Government will assess performance using the Contractor Performance Assessment Reporting System (CPARS) to determine how the Contractor is performing against communicated performance objectives. The
Contractor Performance Assessment Report (CPAR) assesses a Contractor’s performance, both positive and negative, and provides a record on a given contract during a specified period of time. More information pertaining to CPARS can be found at: https://www.cpars.gov. Each assessment will be based on objective data (or measurable, subjective data when objective data is not available) supportable by program and contract management data. CPAR performance expectations will be addressed in the Government and Contractor’s initial post-award meeting.
Potential sources of data may include the following:
- Status and progress reviews
- Production and management reviews
- Management and engineering process reviews (e.g. risk management, requirements management, etc.)
- Cost performance reports and other cost and schedule metrics
- Other program measures and metrics such as:
- Measures of progress and status of resources
- Measures of deliverable timeliness and accuracy
- Measures of product quality and process performance
- Fleet and sponsor feedback/comments and satisfaction ratings
- Systems engineering and other technical progress reviews
- Technical interchange meetings
- Physical and functional configuration audits
- Quality reviews and quality assurance evaluations
- Functional performance evaluations
- Subcontract Reports
A preliminary QASP evaluation/rating will be performed according to the schedule as noted below. The purpose of this review is to determine whether the Contractor is performing at least at a "Satisfactory" level for each major element assessed using Table 1. This methodology will be utilized as an important factor in determining whether to exercise any of the Options under the task order. Further, the formal CPARS ratings are used as reference material by others in source selection.
4. ROLES AND RESPONSIBILITIES
Procuring Contracting Officer (PCO) – An individual duly appointed with the authority to enter into contracts and make related determination and findings on behalf of the Government. PCOs are designated via a written warrant, which sets forth limitations of their respective authority. The PCO ensures performance of all necessary actions for effective contract administration ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the PCO that ensures the Contractor receives impartial, fair and equitable treatment under the contract. The PCO is ultimately responsible for the final determination of the acceptability of the Contractor’s performance. The PCO for this task order is identified in Section G.
Contracting Officer’s Representative (COR) – An individual appointed in writing by the PCO to act as their authorized representative to assist in technical administration. The limitations of authority are contained in a written letter of appointment which is a formal attachment to the contract. The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s technical performance. The COR provides QASP reports to the PCO. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the PCO for action.
Contract Specialist – An individual assigned by the PCO to provide daily administration of the contract.
The contract specialist provides input to the PCO and the COR as to the quality of performance for areas addressed in this QASP.
Subject Matter Expert (SME) – Individuals who may be assigned by the COR to perform limited technical oversight of specific projects, work areas, or Technical Instructions issued under the contract. A SME provides input to the COR as to the quality of technical performance for their respective area(s) of expertise. A SME cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.
5. SCHEDULE
The initial QASP evaluation will be finalized no later than the end of month ten (10) of the base period. In order to accomplish this, the following schedule applies:
COR Written Assessment is due to the Contracting Officer no later than the end of week two (2) of month ten (10) of the period of performance.
Initial QASP Evaluation - The Contracting Officer will review the COR Written Assessment, determine an overall performance rating for the period, and provide a copy to the Contractor no later than week four (4) of month ten (10) of the period of performance.
Interim Evaluations – The COR can provide feedback to the PCO at any time during the period of performance.
The PCO will provide this feedback to the Contractor upon receiving it, if the feedback indicates that the Contractor is not meeting the acceptable performance standards as defined herein.
6. IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The overall performance ratings and standards are included in Table (1), "Overall Performance Ratings". Table 3 provides the Task Performance Evaluation Criteria and Standards for each Major Performance Element. If the Contractor meets the required service or performance level, the Contractor will receive positive preliminary QASP and CPARS ratings. If the Contractor fails to meet the required performance level, the result will be negative QASP and CPARS ratings.
If the Contractor fails to meet the required performance level based on the preliminary review conducted in accordance with the QASP, the Government may not exercise the next Option period under the task order.
To meet the required performance level, the Contractor must receive at least a "Satisfactory" rating (see Table 1) for each of the five (5) major elements that are evaluated (Quality, Cost Control, Schedule and Timeliness, Management/Business Relations, Regulatory Compliance) for the performance period being evaluated. (See Table 3).
7. METHODOLOGIES TO MONITOR PERFORMANCE
SURVEILLANCE TECHNIQUES
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate Contractor performance when appropriate. The COR will use the following methods of surveillance:
- Random monitoring
- 100% Inspection
- Periodic Inspection
- Customer Feedback
CUSTOMER FEEDBACK
The Contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints, investigate and work with the PCO and Contractor to resolve the issue.
8. QUALITY ASSURANCE DOCUMENTATION
THE PERFORMANCE MANAGEMENT FEEDBACK LOOP
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in Table 1.
9. MONITORING SYSTEM
The Government’s QA surveillance, accomplished by the COR, in conjunction with the PCO, will be reported using the methodology described herein. QASP evaluations will be done as input to Option Exercise determinations.
Formal CPARS evaluations shall be conducted on an annual basis.
Table 1 – Overall Performance Rating
Rating Standard
Exceptional Performance meets contractual requirements and exceeds many requirements to the Government’s benefit
Very Good Performance meets contractual requirements and exceeds some requirements to the Government’s benefit
Satisfactory Performance meets contractual requirements. Contractor’s corrective actions to date are satisfactory.
Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet implemented satisfactory corrective measures.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. Contractor’s corrective actions to date are ineffective.
Table 2 – QASP Objectives
Assessment Period Acceptable Performance Definition
Schedule Incentives
Base Period
Overall Performance rating of at least "Satisfactory"
In accordance with the QASP Schedule.
Overall performance rating will be used in the consideration of exercise of Option 1.
Table 3 – Task Performance Evaluation Criteria and Standards
Element 1 – Quality of Product or Service
Unsatisfactory Marginal Satisfactory Very Good Exceptional
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem for which the Contractor’s corrective actions appear or were ineffective.
Deliverables are typically not well researched and contain many technical inaccuracies.
Rework is frequently required.
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions.
The Contractor’s proposed actions appear only marginally effective, or were not fully implemented.
Deliverables are occasionally not well researched and contain some technical inaccuracies.
Rework is occasionally required.
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear, or were, satisfactory.
Deliverables received are well researched, complete and technically accurate. No more than one revision is typically needed to accept the item.
Other deliverables meet all Contract requirements.
contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
Deliverables received are well researched, complete and technically accurate.
Other deliverables meet all Contract requirements.
contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
Deliverables received are always well researched, complete and technically accurate. They frequently exceed technical expectations.
Rework is not required. Other deliverables typically exceed all Contract requirements.
Element 2 – Cost Control & Reporting
Key criteria:
- Were billings current, accurate and complete?
Supporting detail is missing or incomplete.
Supporting detail contains occasional errors.
Invoices are timely and accurate. All supporting detail is provided.
accurate. All supporting detail is provided.
accurate. All supporting detail is provided.
Element 3 – Schedule & Timeliness
Frequently misses deadlines, or is slow or non-responsive to respond to Govt requests.
Occasionally misses deadlines, schedules or is slow or occasionally non-responsive to respond to Govt requests.
Routinely meets deadlines and schedules, quickly responds to Govt requests.
Routinely meets deadlines and schedules and occasionally delivers early and responds immediately to Govt requests.
Routinely delivers ahead of deadlines, schedules, and responds immediately to Govt requests.
Element 4a – Management/ Business Relations: Problem Resolution
Problems are unresolved, repetitive, or take excessive Govt effort to resolve.
Problems are generally resolved but take unusual Govt effort to resolve or take an excessive amount of time to resolve.
Problems are resolved quickly with minimal Govt involvement.
Problems occur infrequently and are generally resolved quickly with minimal Govt involvement.
Problems are non-existent or the Contractor takes corrective action without Govt involvement.
Element 4b – Management/ Business Relations: Responsiveness
Mgmt is unresponsive to Govt requests and concerns.
Mgmt is occasionally unresponsive to Govt requests and concerns.
Mgmt is responsive to Govt requests and concerns.
Mgmt is responsive to requests and concerns and occasionally proactive in anticipating concerns.
Mgmt takes proactive approach in dealing with Govt representatives and anticipates concerns.
Element 4c – Management/ Business Relations: Communication
Fails to communicate with Govt in an effective and timely manner.
Occasionally fails to communicate with Govt in an effective and timely manner.
Routinely communicates with Govt in an effective and timely manner.
Routinely communicates with Govt in an effective and timely manner and is frequently proactive in managing communications.
Takes proactive approach such that communications are almost always clear, effective and timely.
Element 5a – Regulatory Compliance
Key criteria:
- Has the Contractor complied with all contract clause requirements?
- Has the Contractor complied with specifications or other contractual requirements in the contract such as FAPIIS reporting, CAS reporting, safety requirements, environmental reporting, CybersecurityWork Force (CSWF) qualifications/continuous learning/reporting, Controlled Unclassified Information (CUI) requirements, GFP reporting, and standard and unique contract requirements specific to that contract?
Unsatisfactory Marginal Satisfactory Very Good Exceptional
Does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem for which the Contractor’s corrective actions appear or were ineffective.
Does not meet some contractual requirements.
The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only
Meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear, or were, satisfactory.
requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
marginally effective, or were not fully implemented.
Element 5b – Combating Trafficking in Persons Unsatisfactory Satisfactory
The Contractor has not informed the Contracting Officer and the Agency Inspector General of any credible information it has received that alleges a Contractor employee, subcontractor, subcontractor employee, or their agent has engaged in conduct that violates the policy.
Reference FAR 52.222-50
The Contractor has informed the Contracting Officer and the Agency Inspector General 100% of the time of any credible information it has received that alleges a Contractor employee, subcontractor, subcontractor employee, or their agent has engaged in conduct that violates the policy.
Reference FAR 52.222-50
File details come from the government source that posted it. Updated .