Attachment 3- PWS SAFETY VALVES.pdf

PDF 207 KB Posted

Attached to
Safety Valves Maintenance Federal contract opportunity
Solicitation number
FA860123R0012
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Safety Valves Maintenance, newest first.
File Type Posted
Solicitation Amendment FA860123R00120001 SF 30.pdf PDF
Attachment 3 PWS SAFETY VALVES 2023 updated 24 Mar 23.pdf PDF
Questions and Answers from Site Visit.pdf PDF
Attachment 2- 52-212-2 Addendum to Evaluation Factors.pdf PDF
Attachment 4- Wage Determination.pdf PDF
RELEASED- Solicitation - FA860123R0012.pdf PDF
Attachment 5- Bid Schedule.xlsx XLSX spreadsheet
Attachment 1- Instruction To Offerors.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

REMOVE, PEPAIR/OVERHAUL. SET, TEST AND

REINSTALL SAFETY VALVES

FOR

BOILERS LOCATED

IN

AREA A AT BUILDINGS 31240 & 34019

AND

AREA B AT BUILDINGS 20770 & 20080

FA8601-23-R-0012

AT

Wright-Patterson AFB, Ohio

24 June 2022

SECTION I - DESCRIPTION OF SERVICES � GENERAL INFORMATION

1.1. SCOPE OF WORK

1.1.1. The contractor shall furnish all equipment, labor, and supervision required to perform annual inspections of all safety valves and relief valves for boilers at the designated locations on Wright-Patterson AFB as listed in Appendix A & B.

1.1.2. During removal, contractor shall seal pressure vessel openings during the period that the safety valves are removed. The contractor shall have 2 work weeks to arrive at each plant, after the plants shut down, to remove the safety valves. After removal of the safety valves, the contractor has four work weeks, from date of removal, to return the safety valves & install them.

1.1.3. All safety valves shall meet pressure-setting applications for the facility and shall be in accordance with ASME code. All safety valves shall be tested to make sure they lift at their proper pressure, & reset.

1.1.4. The contractor shall provide certification that each safety valve has been repaired, pressure tested, & function tested, by a certified safety valve facility. Each valve shall have tags having stamped capacity verification (code symbol stamp), attached to each safety valve for the facility.

1.1.5. During reinstallation of valves, all applicable connections shall be in place to include drains. All drain lines and drain line fittings shall be repaired or replaced, by the contractor. The contractor shall return the safety valves, which they removed for maintenance, to the place the contractor removed them from. The contractor shall install valves within 4 work weeks after removal, during normal outage periods.

1.1.6. The work also includes removal, repair/overhaul, set, test, and reinstallation of valves and when requested by the Contracting Officer or the Contracting Officer Representative (COR).

1.2. REPORT

1.2.1. The contractor shall submit a complete report to the Contract Officer Representative within 2 work weeks after returning and installing the valves. The report shall include each valve worked on, a listing of all replacement parts and part numbers for the valve, along with description of repairs/inspections on each valve. The contractor shall provide a copy of all maintenance, tests, repairs, parts, certifications, to include months, days, and year, and what was done on each valve. The contractor shall perform a pressure & functional test, as part of the maintenance & certification and submit a copy to the Contracting Officer�s Representatives.

1.3. SERVICE SUMMARY.

Performance Objectives

PWS

Paragraphs

Performance Threshold

(Standards)

Method Of Surveillance

Remedy

Response - Within 2 work weeks of outage.

1.1.2 2 Defects Allowed 100% Re-Performance

Repair/Overhaul 1.1.6 0 Defects Allowed 100% Re-Performance

Set and Test 1.1.2 - 1.1.6 0 Defects Allowed 100% Re-Performance

Reinstallation - Within 4 work weeks of removal.

1.1.5 2 Defects Allowed 100% Re-Performance

Report on each valve within 2 work weeks of returning and installation.

1.2.1 2 Defects Allowed 100% Re-Performance

1.4. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

1.4.1. No Government Furnished Property will be included as part of this contract.

1.5. SECURITY FORCE AND FORCE PROTECTION

1.5.1. Emergency Phone number on base is 911. If using a cell phone (937) 904-1415. Non- Emergency: Police (937) 257-5841 Fire (937) 257-3033

1.6. INSTRUCTIONS TO THE CONTRACTOR

1.6.1. The contractor performing valve repair shall have a Certificate of Authorization in the National Board Valve Repair (�VR� Stamp) Program. All requirements pertaining to the use of the National Board �VR� symbol are presented in the National Board Inspection Code (NBIC) Part RA-2200.

1.6.2. Contractor personnel shall comply with all requirements of the National Fire Codes and Air Force Regulations

1.6.3. The contractor shall not perform any welding or use any flame apparatus without obtaining clearance prior to work from the Fire Inspector. The Fire Inspector 88 ABW/CEFP shall be contacted via phone at (937) 257-4075 or (937) 904-3157. The contractor shall notify the Fire Inspector at least 24 hours in advance of the intended use of any flame apparatus. After receiving approval, when flame apparatus is in use, the contractor shall provide fire protection devices, such as non-combustible coverings and fire extinguishers as directed by the Fire Inspector. The contractor shall use a certified welder for all welding requirements.

1.6.4. The contractor shall conduct work so that Government property, personnel, and work areas shall be protected at all times from inconvenience, damage of any nature, or injury caused by this work.

1.6.5. Project Safety: The work shall be accomplished in accordance with the provisions of all Federal, State (Ohio Industrial Commission) and American Standard Safety Codes for parts of base safety and fire prevention, Air Force Regulations, and all other safety measures applicable as determined by the base ground safety office.

1.6.6. The contractor shall maintain a clean and orderly work area at all times.

1.6.7. Combustible wastes shall be disposed of according to Section 01 02 20 General Environmental Requirements (WPAFB) 2/09 at the end of each work day and shall not be allowed to accumulate.

1.6.8. The contractor shall provide transportation vehicles that comply with Federal, State and local regulations for size and weight limitations.

1.6.9. The Contractor shall not discharge fuels, oils, pesticides, or any other toxic or hazardous substance into the storm or sanitary sewers on base.

1.7. COORDINATION AND SCHEDULING

1.7.1. No written schedule required.

1.7.2. Prior to performance of work, the contractor shall contact the 88CEG/CEOES

Contracting Officer Representative in the office of Building 30022 at least 72 hours prior to starting any work on the safety valves.

1.7.3. The contractor shall visit the work area and become thoroughly familiar with all details of the work and working conditions, verify necessary dimensions at the facilities, and advise the Contracting Officer or the Contracting Officer Representative of any discrepancies within 1 work week before performing any work.

1.7.4. The accomplishment of all work set forth in this Performance Work Statement, shall be coordinated by the Contract Officer Representative based on the status of plant operations.

1.8. OUTAGE PERIODS

1.8.1. Area A starts outage period April 15th, weather dependent.

1.8.2. Area B, Bldg. 20770 starts large gas boilers outage period June 1st. Bldg. 20080 are normally accomplished during scheduled steam outages (COR will notify contractor when scheduled). Gas boilers at bldg. 20770 are normally accomplished during winter months (small gas boilers are to be done before 1 May)

1.9. WORK HOURS

1.9.1. Work shall be performed during normal working hours of 0715 to 1600 Monday through Friday, except Government Holidays and emergency situations as designated by the government. Government Holidays are the following:

New Year�s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington�s Birthday - 3rd Monday in February Memorial Day - last Monday in May Juneteenth- June 19th

Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran�s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December

1.9.2. �Continuation of Contractor Services during Base Exercises, Local Emergencies or Contingencies, and Implementation of Local Contingency Plans. It has been determined that none of the services specified in this PWS are required to be performed during (and/or in support of, whichever is appropriate) base exercises, local emergencies or contingencies or implementation of local contingency plans.

2. APPENDICES

2.1. Appendix A (Area A Valve Location data sheet)

2.2. Appendix B (Area B Valve Location data sheet)

2.3. Appendix C (Contractor Manpower Reporting Language)

2.4. Appendix D (Voluntary Protection Program)

Appendix A

Area A

VALVE LOCATIONS Building 31240, in Area A located at 2381 Oak Street (located near the intersection of Oak Street and Spruce Way) and Bldg. 34019 in Area A (located on Vincent Ave.)

BLDG. 31240

Location Manufacturer Type Boiler #3 Consolidated 1910 00KPI-5 3X4 500 PSI Boiler #3 Consolidated 1910-00KPI-5 3X4 515 PSI Boiler #5 Consolidated 1910LC/PI-T 4X6 500 PSI Boiler #5 Consolidated 1910LC/PI-T 4X6 515 PSI Boiler #6 Consolidated 1910LC/PI-T 4X6 500 PSI Boiler #6 Consolidated 1910LC/PI-T 4X6 515 PSI Nitrogen Tank (capacity 1079 Farris 27DA33-M40 1� 475PSI Boiler standby unit Consolidated 1910LC/PI-T 4X6 500 PSI Boiler standby unit Consolidated 1910LC/PI-T 4X6 515 PSI Boiler standby unit Consolidated 1910KC/PI-T 3X4 500 PSI Boiler standby unit Consolidated 1910KC/PI-T 3X4 515 PSI

Total of 11 safety valves and 1 relief valve *Note: Plant Operating Pressure is 410 psi at 440 degree temperature

BLDG. 34019

Location Manufacturer Type Nitrogen tank #1 Hydro-Seal 7127 scfm 1½ X 2 500 Nitrogen tank #2 Hydro-Seal 7127 scfm 1½ X 2 500 Boiler #1 Lonergan 7190 pph 1 X 2 490 Boiler #1 Consolidated 14563 pph 1½X3 500 Boiler #2 Lonergan 7190 pph 1 X 2 490 Boiler #2 Lonergan 12020 pph 1½X2 500 Boiler #3 Kunkle 7667 pph 1 X 1½ 475 Boiler #3 Kunkle 8059 pph 1 X 1½ 500

Total of 8 safety valves *Note: Plant Operating Pressure is 350 psi at 410 degree temperature

Appendix B

Area B VALVE LOCATIONS Building 20770 in Area B located at 2711 Kauffman Ave. (located near the intersection of National Road and Kauffman Ave.) & Bldg 20080, in Area B (located near the intersection of E Street and Monohan Way.

BLDG 20770

Location Manufacturer Type Boiler #3 Consolidated 1811NA20 4X6 430 Boiler #4 Consolidated 1811NA20 4X6 430 Boiler #3 Consolidated 1811NA20 4X6 435 Boiler #4 Consolidated 1811NA20 4X6 435 Boiler #1 Kunkle 252-P40 4X6 140 Boiler #2 Kunkle 252-P40 4X6 140 Boiler #1 Kunkle 252-P40 4X6 145 Boiler #2 Kunkle 252-P40 4X6 145 8� Reducing station outlet Consolidated 1511Q-0-2-20 6X8 145 8� Reducing station outlet Consolidated 1511Q-0-2-20 6X8 145

Total of 10 safety valves *Note: Plant operation pressure 400 psi gas boilers 125 psi gas and 120 psi on reducing station

BLDG 20080

Location Manufacturer Type 20080, SRV-1 Farris H26TA12S-170 8X10 140 20080, SRV-2 Farris H26TA12S-170 8X10 140

Total of 2 safety valves

* Note: operation pressures are 125 psi

Appendix C

Contractor Manpower Reporting Requirements

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.

*Reporting Period: Contractors are required to input data by 31 October of each year.

Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link.

However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

Appendix D

Voluntary Protection Program

APPLICABILITY: This section of the PWS applies to �Applicable Contractors� as defined below.

DEFINITIONS:

Applicable Contractor. A contractor whose employees worked at least 1,000 hours at the site in any calendar quarter within the last 12 months and is NOT directly supervised by the applicant (installation).

Days Away, Restricted, and or Transfer Case Incident Rate (DART). The number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.

Total Case Incidence Rate (TCIR) - Total number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.

Voluntary Protection Program - The Voluntary Protection Program (VPP) promotes effective worksite-based safety and health. In the VPP, management, labor, and OSHA establish cooperative relationships at workplaces that have implemented a comprehensive safety and health management system. Approval into VPP is OSHA�s official recognition of the outstanding efforts of employers and employees who have achieved exemplary occupational safety and health.

REQUIREMENTS:

Wright-Patterson AFB is in the process of pursuing VPP recognition or has already been recognized under the OSHA Voluntary Protection Program (VPP). VPP impacts all �applicable contractors� operating on Air Force Installations. The contractor shall be responsible for ensuring their employees and managers have a comprehensive understanding of VPP as well as full compliance with OSHA requirements. The contractor shall follow the safety and health rules of the installation or VPP site. Detailed information on VPP is available on the OSHA website at http://www/osha.gov/dcsp/vpp/index.html.

The contractor shall submit a Safety and Health Plan and corresponding site safety checklist to the Contracting Officer not later than 10 calendar days after contract award. The contractor�s plan shall include appropriate measures to ensure the contractor reacts promptly to investigate, correct, and track alleged safety and health violations and/or uncontrolled hazards in contractor work areas. The plan shall:

Demonstrate a management commitment to employee safety and health;

Identify the application of the safety and health plan to subcontractors;

Identify the roles and responsibilities of the following individuals with respect to safety and VPP: Management, Supervisors, Employees, and Safety Coordinator;

Identify applicable safety rules and regulations;

Include a worksite hazard analysis to include base-line hazard identification and required control measures;

Include a job site analysis to include hazards of tasks required to control measures;

Identify employee safety and health training requirements and the documentation process;

Include a workplace inspection frequency, to include identifying the individual conducting the inspections;

Include employee hazard reporting procedures;

Identify individual(s) responsible for corrective action of hazards;

Identify first aid/injury procedures;

Identify procedures for accident investigation and reporting;

Identify emergency response procedures; and

Identify the process for tracking controlled hazards in contractor work areas.

The contractor shall submit their Total Case Incidence Rate (TCIR) and Days Away, Restricted, and or Transfer Case Incident Rate (DART) rates and OSHA Form 300A annually to the contracting office for consolidation and submission as part of the installation�s annual VPP Safety and Health Management report. TCIR and DART rates are due by the 15th of January of each year.

The contractor�s Quality Control Plan shall identify the processes and procedures the contractor will use to track compliance with the Safety and Health Plan, and the process and procedures that will be used to correct violation. The contractor shall establish these VPP requirements for all subcontractors who qualify as applicable contractors under the resulting contract.