This document is an Appendix B titled "GPRG ITM Mandatory Frequencies" that provides details on the inspection, functional testing, and maintenance requirements for the gas pressure reducing groups (GPRG) of the gas distribution system at Aviano Air Base, Italy.

The key details are:

  • The document specifies the mandatory inspection, functional testing, and maintenance frequencies for GPRG based on the upstream pressure and nominal flow rate.
  • For GPRG with nominal flow rate greater than 1200 kW, inspections are required every 0.04 years, functional tests every 0.04 years, and maintenance every 0.04 years.
  • For GPRG with nominal flow rate less than or equal to 1200 kW, inspections are required every 0.04 years, functional tests every 0.04 years, and maintenance every 0.04 years.

This Appendix B is referenced in the Performance Work Statement (PWS) for the Maintenance and Repair of Gas Distribution System at Aviano AB, Italy contract opportunity, Solicitation Number FA568224Q8089, issued by the U.S. Air Force United States Air Forces in Europe - Air Forces Africa.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX B

GPRG ITM Mandatory Frequencies

MAINTENANCE AND REPAIR OF GAS DISTRIBUTION SYSTEM

AT AVIANO AB, ITALY

Pressione a monte Upstream pressure

Bar

Portata nominale dei sistemi di controllo della pressione Nominal flow rate of Gas Pressure Reducing Groups

Qnom > 1200 KW Qnom ≤ 1200 KW

Ispezioni Inspections

Verifiche funzionali Functional Tests

Manutenzione Maintenance

Verifiche funzionali Functional Tests

Manutenzione Maintenance

0.04 < P ≤ 0.5 *) 1 ogni 2 anni 1 every 2 years

1 ogni 8 anni 1 every 8 years

1 ogni 3 anni 1 every 3 years

Secondo necessitá According to need 0.5 < P ≤ 5 *) 1 ogni anno

1 per year 1 ogni 7 anni 1 every 7 years

1 ogni 2 anni 1 every 2 years

5 < P ≤ 12 *) 1 ogni anno 1 per year

1 ogni 5 anni 1 every 5 years

1 ogni anno 1 every year

*) Le ispezioni devono essere effettuate nell’intervallo tra due verifiche funzionali successive *) The inspections must be performed in the interval between two subsequent functional tests

Nota Per i sistemi di controllo della pressione con portata nominale Qnom ≤ 1200 KW, il primo ciclo di verifiche funzionali dovrá essere eseguito entro il primo anno del presente contratto

Note For the Gas Pressure Reducing Groups with nominal flow rate Qnom ≤ 1200 KW, the first cycle of functional test shall be performed within the first year of present contract