Attachment 3 - Proposed Payment and Milestone Schedule.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- SUB-2025-10263
- Issued by
-
Department of Energy Office of Science
About this file
The file is an Attachment 3 - Proposed Payment and Milestone Schedule for Solicitation SUB-2025-10263, detailing a comprehensive project milestone schedule for an equipment enclosure for a PEM Megawatt-Scale Low Temperature Electrolyzer at the National Renewable Energy Laboratory (NREL). The document outlines seven key project milestones, including structural design and engineering drawings (at 90% and 100% completion), equipment enclosure manufacturing, photographic/video documentation, delivery to NREL, installation and commissioning support, and final "As Built" drawings.
The payment schedule indicates zero dollar values ($0.00) for each milestone, suggesting this may be a cost-reimbursement contract or that pricing details are contained in a separate document. The project is sponsored by the Department of Energy Office of Science and involves creating a 24 x 50 feet enclosure with 12-foot ceilings designed to house and climate control electrolyzer stacks and balance of plant equipment. The solicitation focuses on design, manufacturing, and delivery of a specialized research facility infrastructure component for advanced hydrogen electrolysis technology.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFX# SUB-2025-10263 | |||
| Proposed Payment Occurrence Table | |||
| Deliverable | Description | Proposed Completion Date/Milestone Schedule | Proposed Price |
| 6.1 | 90% Enclosure Structural Design and Engineering Drawings | $0.00 | |
| 6.2 | 100% Enclosure Structural Design and Engineering Drawings | $0.00 | |
| 6.3 | Complete Manufacture of Equipment Enclosures | $0.00 | |
| 6.4 | Enclosure Photographs or Video for Inspection | $0.00 | |
| 6.5 | Delivery of Enclosure at NREL Deliverable Address | $0.00 | |
| 6.6 | Instructions, materials, and support for Installation and Commissioning of Enclosure at NREL Deliverable Address. | ||
| 6.7 | Final and Complete “As Built” Enclosure Drawing with Construction Details | $0.00 | |
| Total Price | $0.00 |
File details come from the government source that posted it. Updated .