140R4023Q0005 – BGNDRF Semi-Annual Water Testing
PRICE SCHEDULE
Brackish Groundwater National Desalination Research Facility Semi-Annual Water Testing
Price Schedule
1. Offers will be considered for award on the following schedule, but no offer will be considered for award on only a part of the schedule. Provide prices in such a way that the full cost can be understood. Since the sample schedule may change after the contract is issued, the offers must show the individual prices for sample analysis, field blank analysis, and fees charged by sample or invoice.
2. Offers are subject to the terms and conditions of this solicitation.
Provide the unit price information for each type of sample type. If return shipping is a separate line item, provide shipping costs based on a 50-pound cooler with dimensions 15 inches (H) x 25 inches (L) x 15 inches (H) using first overnight rates. If rush analysis is available, provide information on costing information (e.g., % increase, $ increase).
| Item No. |
| Supplies / Services |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| 1. |
| Well water sample set. |
| 2.0 |
| EACH |
| $ |
| $ |
| 2. |
| Evaporation ponds water sample set – Spring List. |
| 1.0 |
| EACH |
| $ |
| $ |
| 3. |
| Evaporation ponds water sample set – Fall List. |
| 1.0 |
| EACH |
| $ |
| $ |
| 4. |
| Irrigation water sample set – Spring List. |
| 1.0 |
| EACH |
| $ |
| $ |
| 5. |
| Irrigation water sample set – Fall List. |
| 1.0 |
| EACH |
| $ |
| $ |
| 6. |
| Shipping (if not included in sample cost) |
| 1.0 |
| EACH |
| $ |
| $ |
| 7. |
| Rush Turnaround Time Cost |
| 1.0 |
| EACH |
| $ |
| $ |
Using the sampling schedule in Exhibit 1, provide the total cost for services for two wells and two additional samples that will be a combination of evaporation pond and/or irrigation samples. Additional samples will be on a separate CLIN and will be based on the unit cost for each sample type. There will be no more than four well samples, three evaporation ponds, and four irrigation samples.
| CLIN/Item No. |
| Supplies / Services |
| Quantity |
| Unit |
| Amount |
| Test Cycle (Fall 2022) Two Wells, One Evaporation Pond, and One Irrigation Sample. |
| 1.0 |
| LOT |
| $ |
| Test Cycle (Spring 2023) Two Wells, One Evaporation Pond, and One Irrigation Sample. |
| 1.0 |
| LOT |
| $ |
| 00020 |
| Optional Additional Testing for Well (Fall 2022) |
| 1.0 |
| EA |
| $ |
| 00030 |
| Optional Additional Testing for Well (Fall 2022) |
| 1.0 |
| EA |
| $ |
| 00040 |
| Optional Additional Testing for Well (Spring 2023) |
| 1.0 |
| EA |
| $ |
| 00050 |
| Optional Additional Testing for Well (Spring 2023) |
| 1.0 |
| EA |
| $ |
| 00060 |
| Optional Additional Testing for Evaporation Pond (Fall 2022) |
| 1.0 |
| EA |
| $ |
| 00070 |
| Optional Additional Testing for Evaporation Pond (Fall 2022) |
| 1.0 |
| EA |
| $ |
| 00080 |
| Optional Additional Testing for Evaporation Pond (Spring 2023) |
| 1.0 |
| EA |
| $ |
| 00090 |
| Optional Additional Testing for |
Evaporation Pond (Spring 2023)
| 00100 |
| Optional Additional Testing for Irrigation (Fall 2022) |
| 1.0 |
| EA |
| $ |
| 00110 |
| Optional Additional Testing for |
Irrigation (Spring 2023)
| Test Cycle (Fall 2023) Two Wells, One Evaporation Pond, and One Irrigation Sample. |
| 1.0 |
| LOT |
| $ |
| Test Cycle (Spring 2024) Two Wells, One Evaporation Pond, and One Irrigation Sample. |
| 1.0 |
| LOT |
| $ |
| 00130 |
| Optional Additional Testing for Well (Fall 2023) |
| 1.0 |
| EA |
| $ |
| 00140 |
| Optional Additional Testing for Well (Fall 2023) |
| 1.0 |
| EA |
| $ |
| 00150 |
| Optional Additional Testing for Well (Spring 2024) |
| 1.0 |
| EA |
| $ |
| 00160 |
| Optional Additional Testing for Well (Spring 2024) |
| 1.0 |
| EA |
| $ |
| 00170 |
| Optional Additional Testing for Evaporation Pond (Fall 2023) |
| 1.0 |
| EA |
| $ |
| 00180 |
| Optional Additional Testing for Evaporation Pond (Fall 2023) |
| 1.0 |
| EA |
| $ |
| 00190 |
| Optional Additional Testing for Evaporation Pond (Spring 2024) |
| 1.0 |
| EA |
| $ |
| 00200 |
| Optional Additional Testing for |
Evaporation Pond (Spring 2024)
| 00210 |
| Optional Additional Testing for Irrigation (Fall 2023) |
| 1.0 |
| EA |
| $ |
| 00220 |
| Optional Additional Testing for |
Irrigation (Spring 2024)
| Test Cycle (Fall 2024) Two Wells, One Evaporation Ponds, and One Irrigation Sample. |
| 1.0 |
| LOT |
| $ |
| Test Cycle (Spring 2025) Two Wells, One Evaporation Pond, and One Irrigation Sample. |
| 1.0 |
| LOT |
| $ |
| 00240 |
| Optional Additional Testing for Well (Fall 2024) |
| 1.0 |
| EA |
| $ |
| 00250 |
| Optional Additional Testing for Well (Fall 2024) |
| 1.0 |
| EA |
| $ |
| 00260 |
| Optional Additional Testing for Well (Spring 2025) |
| 1.0 |
| EA |
| $ |
| 00270 |
| Optional Additional Testing for Well (Spring 2025) |
| 1.0 |
| EA |
| $ |
| 00280 |
| Optional Additional Testing for Evaporation Pond (Fall 2024) |
| 1.0 |
| EA |
| $ |
| 00290 |
| Optional Additional Testing for Evaporation Pond (Fall 2024) |
| 1.0 |
| EA |
| $ |
| 00300 |
| Optional Additional Testing for Evaporation Pond (Spring 2025) |
| 1.0 |
| EA |
| $ |
| 00310 |
| Optional Additional Testing for |
Evaporation Pond (Spring 2025)
| 00320 |
| Optional Additional Testing for Irrigation (Fall 2024) |
| 1.0 |
| EA |
| $ |
| 00330 |
| Optional Additional Testing for |
Irrigation (Spring 2025)
| Test Cycle (Fall 2025) Two Wells, One Evaporation Pond, and One Irrigation Sample. |
| 1.0 |
| LOT |
| $ |
| Test Cycle (Spring 2026) Two Wells, One Evaporation Pond, and One Irrigation Sample. |
| 1.0 |
| LOT |
| $ |
| 00350 |
| Optional Additional Testing for Well (Fall 2025) |
| 1.0 |
| EA |
| $ |
| 00360 |
| Optional Additional Testing for Well (Fall 2025) |
| 1.0 |
| EA |
| $ |
| 00370 |
| Optional Additional Testing for Well (Spring 2026) |
| 1.0 |
| EA |
| $ |
| 00380 |
| Optional Additional Testing for Well (Spring 2026) |
| 1.0 |
| EA |
| $ |
| 00390 |
| Optional Additional Testing for Evaporation Pond (Fall 2025) |
| 1.0 |
| EA |
| $ |
| 00400 |
| Optional Additional Testing for Evaporation Pond (Fall 2025) |
| 1.0 |
| EA |
| $ |
| 00410 |
| Optional Additional Testing for Evaporation Pond (Spring 2026) |
| 1.0 |
| EA |
| $ |
| 00420 |
| Optional Additional Testing for |
Evaporation Pond (Spring 2026)
| 00430 |
| Optional Additional Testing for Irrigation (Fall 2025) |
| 1.0 |
| EA |
| $ |
| 00440 |
| Optional Additional Testing for |
Irrigation (Spring 2026)
| Test Cycle (Fall 2026) Two Wells, One Evaporation Pond, and One Irrigation Sample. |
| 1.0 |
| LOT |
| $ |
| Test Cycle (Spring 2027) Two Wells, One Evaporation Pond, and One Irrigation Sample. |
| 1.0 |
| LOT |
| $ |
| 00460 |
| Optional Additional Testing for Well (Fall 2026) |
| 1.0 |
| EA |
| $ |
| 00470 |
| Optional Additional Testing for Well (Fall 2026) |
| 1.0 |
| EA |
| $ |
| 00480 |
| Optional Additional Testing for Well (Spring 2027) |
| 1.0 |
| EA |
| $ |
| 00490 |
| Optional Additional Testing for Well (Spring 2027) |
| 1.0 |
| EA |
| $ |
| 00500 |
| Optional Additional Testing for Evaporation Pond (Fall 2026) |
| 1.0 |
| EA |
| $ |
| 00510 |
| Optional Additional Testing for Evaporation Pond (Fall 2026) |
| 1.0 |
| EA |
| $ |
| 00520 |
| Optional Additional Testing for Evaporation Pond (Spring 2027) |
| 1.0 |
| EA |
| $ |
| 00530 |
| Optional Additional Testing for |
Evaporation Pond (Spring 2027)
| 00540 |
| Optional Additional Testing for Irrigation (Fall 2026) |
| 1.0 |
| EA |
| $ |
| 00550 |
| Optional Additional Testing for |
Irrigation (Spring 2027)
Subtotal of Base and 4 Option Years
Any Applicable Taxes and/or fees
| 6-Month Extension (If needed) |
| Test Cycle (Fall 2027) Two Wells, One Evaporation Pond, and One Irrigation Sample. |
| 1.0 |
| LOT |
| $ |
End of Schedule