BGNDRF Semi-Annual Water Testing
STATEMENT OF WORK
1. GENERAL INFORMATION
There are three objectives for the water analysis described in this Performance Statement of Work. The first objective is to give the clients of the Brackish Groundwater National Desalination Research Facility (BGNDRF) thorough information concerning well water (i.e. feed water) for the purposes of designing and configuring pilot scale water treatment technologies and measuring technology performance.
The second objective is to meet reporting requirements under the New Mexico Environment Department (NMED) discharge permit, DP-1472 for concentrate in the BGNDRF evaporation ponds and concentrate used for irrigations in the BGNDRF Agriculture Research Area (ARA). NMED monitors potential groundwater contaminates discharged at this facility.
The third objective is to present irrigation water quality data to clients working in the ARA for research purposes.
| 1.1 | SCOPE OF WORK. The Contractor shall provide all personnel, equipment, tools, materials, supervision and other items and services necessary to perform analysis of water and concentrate as described in this statement of work. Samples of water will come up to a total of four brackish water wells, three evaporation ponds, and from the water used for irrigations in the ARA. The number of samples may change for each event, so the Facility Manager will communicate with the contractor the total number of samples. There will be a baseline of four samples per event, but there maybe be as many as 11 samples (4 wells, 3 ponds, and 1-4 irrigation samples). The Contractor shall perform to the standards in this contract. The sampling frequencies and quantities of work are listed in Exhibit 1. |
| 1.2 | CONTRACTOR AND LABORATORY STANDARDS |
| 1.2.1 | Contractor’s employees performing analysis must have current and valid certifications in the analysis methods required under this contract. Proof of these certifications shall be submitted to the Contracting Officer prior to starting work under this contract. |
| 1.2.2 | Laboratory shall be accredited in accordance with the most recent National Environmental Laboratory Accreditation Conference (NELAC) standards for water analysis and certified by the state in which it is located. The laboratory must be in good standing with both, and not be under review or investigation. The Contractor must be participating in the EPA Quality Assurance Program. The Contractor will submit proof of laboratory certification and applicable Quality Assurance (QA) sample results as part of their proposal and any applicable updates prior to starting work under this contract. |
| 2. | GOVERNMENT–FURNISHED PROPERTY AND SERVICES |
| 2.1 | The government will obtain samples from up to four brackish water wells, up to three evaporation ponds, and from any water used for irrigations in the ARA using containers, coolers, and procedures provided by the Contractor. |
| 2.1.1 | Procedures will include minimum well run times prior to sampling water from each well. |
| 2.2 | The government will ship the water samples to the Contractor using the chain of custody protocol and forms provided by the Contractor. |
| 2.3 | The government will provide existing Excel spreadsheets of well water, evaporation pond, and irrigation test data for the Contractor to insert the newly acquired data described in this Statement of Work. |
| 3. | CONTRACTOR-FURNISHED ITEMS AND SERVICES |
| 3.1 | The Contractor shall provide clean sample containers (e.g., acid-washed bottles free of debris and residue, etc.) and arrange delivery of these containers via courier. Sample containers that require preservatives must have the preservative in a separate vial inside a sealed bag to prevent leakage during shipment. Contractor shall also provide chain of custody forms and any other necessary processing documents and a bag to seal the documents in for shipment. The Contractor must deliver the containers and necessary documents to the Brackish Groundwater National Desalination Research Facility at 500 La Velle Road, Alamogordo, NM 88310 within seven (7) calendar days after receipt of the Notice to Proceed, unless other arrangements are made. |
The Contractor will provide the Facility Manager of BGNDRF with instructions regarding how to sample, pack and ship the samples to the Contractor including any time limits that must be observed between the time of sampling and reception by the Contractor. Instructions will include chain of custody procedures.
Exhibit 1 presents the sampling frequencies, quantities and tests to be conducted by the Contractor.
| 4. | DELIVERABLES |
| 4.1 | REPORTS |
| 4.1.1 | In addition to Contractor-developed QA/QC reports, The Contractor will provide an Executive Summary Report for each sample type (Well water, evaporation pond, and irrigation). Do not combine these into a single report |
| 4.1.2 | Well Water Analysis Report |
| 4.1.2.1 | Contractor shall provide an electronic Level II QA/QC report after each test cycle. Each report will be comprised of a written narrative of detection highlights, observations, and analysis using the Contractor’s method. At a minimum, the report must contain tabulated results, receipt and analyses dates (including scanned copies of chains of custody), method numbers, sample descriptions, detection limits, and qualifiers (if needed), internal batch Quality Control (QC) analyses associated with the samples. The QC results include surrogate recoveries, matrix spike, method blanks, and laboratory control samples. |
| 4.1.2.2 | The written Executive Summary will generally be no more than five pages in length. It will be Microsoft Word compatible. This summary should provide a discussion of how the results compare to historical data, if any new compounds have been detected at levels above the NMAC 20.6.2.3103 Standard, and if any QA/QC issues have arisen. A sample summary can be provided upon request. |
| 4.1.2.3 | Contractor shall provide an updated electronic Microsoft excel spreadsheet of water test data after each complete cycle of testing. The spreadsheet data for each test cycle shall be added to existing data from prior years of testing. The data will be inserted chronologically, for ease of side-by-side comparisons of data. The spreadsheet will include updated electronic charts of the full range of data for each constituent tested. Charts of data shall closely match previous charts provided to the Contractor. |
| 4.1.3 | Evaporation Pond Analysis Report |
| 4.1.3.1 | Contractor shall provide an electronic Level II QA/QC report after each test cycle. Each report will be comprised of a written narrative of detection highlights, observations, and analysis using the Contractor’s method. At a minimum, the report must contain tabulated results, receipt and analyses dates (including scanned copies of chains of custody), method numbers, sample descriptions, detection limits, and qualifiers (if needed), internal batch Quality Control (QC) analyses associated with the samples. The QC results include surrogate recoveries, matrix spike, method blanks, and laboratory control samples. |
| 4.1.3.2 | The written Executive Summary will generally be no more than five pages in length. It will be Microsoft Word compatible. This summary should provide a discussion of how the results compare to historical data, if any new compounds have been detected at levels above the NMAC 20.6.2.3103 Standard, and if any QA/QC issues have arisen. A sample summary can be provided upon request. |
| 4.1.3.3 | Contractor shall provide an updated electronic Microsoft excel spreadsheet of water test data after each complete cycle of testing. The spreadsheet data for each test cycle shall be added to existing data from prior years of testing. The data will be inserted chronologically, for ease of side-by-side comparisons of data. The spreadsheet will include updated electronic charts of the full range of data for each constituent tested. Charts of data shall closely match previous charts provided to the Contractor. |
| 4.1.4 | Irrigation Analysis Report |
| 4.1.4.1 | Contractor shall provide an electronic Level II QA/QC report after each test cycle. Each report will be comprised of a written narrative of detection highlights, observations, and analysis using the Contractor’s method. At a minimum, the report must contain tabulated results, receipt and analyses dates (including scanned copies of chains of custody), method numbers, sample descriptions, detection limits, and qualifiers (if needed), internal batch Quality Control (QC) analyses associated with the samples. The QC results include surrogate recoveries, matrix spike, method blanks, and laboratory control samples. |
| 4.1.4.2 | The written Executive Summary will generally be no more than five pages in length. It will be Microsoft Word compatible. This summary should provide a discussion of how the results compare to historical data, if any new compounds have been detected at levels above the NMAC 20.6.2.3103 Standard, and if any QA/QC issues have arisen. A sample summary can be provided upon request. |
| 4.1.4.3 | Contractor shall provide an updated electronic Microsoft excel spreadsheet of water test data after each complete cycle of testing. The spreadsheet data for each test cycle shall be added to existing data from prior years of testing. The data will be inserted chronologically, for ease of side-by-side comparisons of data. The spreadsheet will include updated electronic charts of the full range of data for each constituent tested. Charts of data shall closely match previous charts provided to the Contractor. |
| 5. | SCHEDULE |
| 5.1 | NMED requires a semi-annual report from BGNDRF in accordance with discharge permit DP1472. In order to meet NMED reporting requirements, the Contractor’s final report from testing of evaporation pond and irrigation concentrate must be completed by the following dates each year: December 31st and July 1st of each year. The contractor must be able to meet 10-15 business day turnaround times. |
| 5.2 | The list of analytes in Exhibit 1 may change depending on NMED requirements. The list of analytes will change no more often than annually and will be communicated to the Contractor with enough time for a contract modification if necessary. |
| 5.3 | The well water sampling dates will correspond with concentrate sampling dates. |
| 5.4 | Contractor for each test cycle shall coordinate with the BGNDRF Facility Manager regarding the sampling date and shipping date for shipping samples to the Contractor’s laboratory. The Contractor shall provide the government sampling containers, sampling protocols, shipping containers, and chain of custody forms within 5 days of scheduled sampling date. The number of samples sent to the Contractor will depend on availability and use of the various streams, so the Contractor must contact the Facility Manager for the number of samples expected for each type (e.g., 4 wells, 3 ponds, 2 irrigation). Contractor will arrange and pay for shipping. Contractor will begin analysis of samples within the required limit set by each method. Upon receipt of samples, the Contractor shall complete analysis and submit required deliverables within 90 calendar days. |
BGNDRF Semi-Annual Water Testing
Exhibit 1: Water Tests
Note: Method references are provided, however, different methods may be acceptable if requested by the Contractor.
| No. |
| Water Analysis Test |
| NMAC 20.6.2.3103 Standard |
| Method Reference |
| Well Test(s) per Cycle |
| Evap. Pond Test(s) per Cycle - Spring |
| Evap. Pond Test(s) per Cycle - Fall |
| Irrigation Spring |
| Irrigation Fall |
General Chemistry
| 1 |
| Alkalinity, Bicarbonate |
| 9 |
| Cyanide |
| Y |
| EPA 335.2 SM4500CNE |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 10 |
| Dissolved Oxygen (See Note 1) |
| 11 |
| Fluoride |
| Y |
| EPA 300.0 |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 13 |
| Langelier Saturation Index |
| 14 |
| Nitrogen, Nitrate (as N) |
| Y |
| EPA 300.0 |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 15 |
| Nitrate+Nitrite (as N) |
| 16 |
| Nitrogen, Nitrite (As N) |
| Y |
| EPA 300.0 |
| 2 |
| 0 |
| 0 |
| 0 |
| 0 |
| 22 |
| Solids, Filterable “TDS” |
Metals and Major Cations
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 26 |
| Antimony |
| Y |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 27 |
| Arsenic |
| Y |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 28 |
| Barium |
| Y |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 29 |
| Beryllium |
| Y |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 31 |
| Cadmium |
| Y |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.7 / SW6020B |
| 2 |
| 0 |
| 0 |
| 0 |
| 0 |
| 33 |
| Chromium |
| Y |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.7 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.7 / SW6020B |
| 2 |
| 0 |
| 0 |
| 0 |
| 0 |
| 38 |
| Lead |
| Y |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.7 / SW6020B |
| 2 |
| 0 |
| 0 |
| 0 |
| 0 |
| EPA 200.7 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.7 / SW6020B |
| 2 |
| 0 |
| 0 |
| 0 |
| 0 |
| 42 |
| Mercury, Total |
| Y |
| EPA 245.1 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.7 / SW6020B |
| 2 |
| 0 |
| 0 |
| 0 |
| 0 |
| 46 |
| Selenium |
| Y |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 47 |
| Silica (SiO2) or Silicon (Si) |
| Hach Method 8185 (SiO2)/ SW6020B (Si) |
| 2 |
| 0 |
| 0 |
| 0 |
| 0 |
| 48 |
| Silver |
| Y |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.7 / SW6020B |
| 2 |
| 0 |
| 0 |
| 0 |
| 0 |
| EPA 200.7 / SW6020B |
| 2 |
| 0 |
| 0 |
| 0 |
| 0 |
| 51 |
| Thallium |
| Y |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 52 |
| Uranium |
| Y |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| EPA 200.8 / SW6020B |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
Radiology
| 54 |
| Gross Alpha |
| Y |
| EPA 900.0/9310 |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
Organics
| 55 |
| Total Organic Carbon (TOC) |
| 56 |
| Perfluorooctane sulfonic acid (PFOS) |
| Y |
| EPA 537 mod |
| 4 |
| 1 |
| 1 |
| 1 |
| 1 |
| 57 |
| Perfluorooctanoic acid (PFOA) |
| Y |
| EPA 537 mod |
| 4 |
| 1 |
| 1 |
| 1 |
| 1 |
| 58 |
| Perfluorohexanesulfonic Acid (PFHxS) |
| Y |
| EPA 537 mod |
| 4 |
| 1 |
| 1 |
| 1 |
| 1 |
| 59 |
| Benzene |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 60 |
| Carbon Tetrachloride |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 61 |
| Chloroform |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 62 |
| 1,1-dichloroethane |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 63 |
| 1,2-dichloroethane (EDC) |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 64 |
| 1,1-dichloroethylene (1,1-DCE) |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 65 |
| Ethylbenzene |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 66 |
| Ethylene Dibromide (EDB) |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 67 |
| Methylene Chloride |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 68 |
| 1,1,1-trichloroethane |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 69 |
| 1,1,2-trichloroethane |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 70 |
| 1,1,2,2-tetrachloroethane |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 71 |
| 1,1,2,2-tetrachloroethylene (PCE) |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 72 |
| 1,1,2-trichloroethylene (TCE) |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 73 |
| Toluene |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 74 |
| Vinyl Chloride |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 75 |
| Xylenes, Total |
| Y |
| SW 8260D |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 76 |
| Atrazine |
| Y |
| SW 8270E |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 77 |
| Benzo-a-pyrene |
| Y |
| SW 8270E |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 78 |
| PAHs: total naphthalene plus monomethylnaphthalenes |
| Y |
| SW 8270E |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 79 |
| Total Phenols |
| Y |
| SW 8270E |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
| 80 |
| Polychlorinated biphenyls (PCB’s) |
| Y |
| SW 8270E |
| 0 |
| 1 |
| 0 |
| 1 |
| 0 |
1. The Dissolved Oxygen tests will be performed by the BGNDRF staff using a government-owned test kit and procedures provided by the Contractor. Test results will be included in the final report presented by the Contractor.