Attachment 3 - Price Schedule NC MHE Maintenance.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- SP451025Q1010
- Issued by
-
Defense Logistics Agency
About this file
This is a pricing template spreadsheet for a Material Handling Equipment (MHE) maintenance services contract in North Carolina. The template covers quarterly and annual preventive maintenance for various equipment including electric forklifts (3-4k, 5-10k, 12-19k, 30-39k, and 50-59k capacity), front end loaders, excavators, utility task vehicles, street sweepers, and mobile loading ramps. The spreadsheet is structured with a base year and two option years.
The pricing schedule includes line items for repair/replacement parts with a ROM value of $50,000 per year and 160 hours of unscheduled repair labor. The services will be performed at DLA Disposition Services locations at Fort Liberty and Camp Lejeune in North Carolina. The contract will be awarded as a firm-fixed-price, time and materials IDIQ contract set aside 100% for small businesses under NAICS 811310 with a size standard of $12.5M. Quotes are due March 4, 2025 at 3:00 PM EST, with questions due February 17, 2025. The minimum guarantee for the base period is $2,500 with a maximum value of 150% above the total estimated value.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 7 - Questions and Answers.docx | DOCX document | |
| Attachment 1 NC MHE Maintenance Equipment.xlsx | XLSX spreadsheet | |
| Attachment 5 - QASP NC MHE Maintenance.docx | DOCX document | |
| Attachment 6 - Past Performance Questionnaire.doc | DOC document | |
| Attachment 4 - PWS MHE NC Maintenance.docx | DOCX document | |
| Attachment 2 - NC MHE Maintenance Locations.xlsx | XLSX spreadsheet | |
| Lejeune Wage Determination 2015-4389.pdf | ||
| Liberty Wage Determination 2015-4377.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Price Schedule for CONUS MHE North Carolina Region
| CLIN | BASE Period - (12 Months) | Unit of Issue | Amount | Price | Extended Price |
| 0001 | Quarterly Preventive Maintenance: Electric Forklift, 3-4k | EA | 36 | $0.00 | |
| 0002 | Annual Preventive Maintenance: Electric Forklift, 3-4k | EA | 12 | $0.00 | |
| 0003 | Quarterly Preventive Maintenance: Forklift, 5-10k | EA | 30 | $0.00 | |
| 0004 | Annual Preventive Maintenance: Forklift, 5-10k | EA | 10 | $0.00 | |
| 0005 | Quarterly Preventive Maintenance: Forklift, 12-19k | EA | 9 | $0.00 | |
| 0006 | Annual Preventive Maintenance: Forklift, 12-19k | EA | 3 | $0.00 | |
| 0007 | Quarterly Preventive Maintenance: Forklift, 30-39k | EA | 9 | $0.00 | |
| 0008 | Annual Preventive Maintenance: Forklift, 30-39k | EA | 3 | $0.00 | |
| 0009 | Quarterly Preventive Maintenance: Forklift, 50-59k | EA | 1 | $0.00 | |
| 0010 | Annual Preventive Maintenance: Forklift, 50-59k | EA | 1 | $0.00 | |
| 0011 | Quarterly Preventive Maintenance: Front End Loader | EA | 18 | $0.00 | |
| 0012 | Annual Preventive Maintenance: Front End Loader | EA | 6 | $0.00 | |
| 0013 | Quarterly Preventive Maintenance: Excavator | EA | 1 | $0.00 | |
| 0014 | Annual Preventive Maintenance: Excavator | EA | 1 | $0.00 | |
| 0015 | Quarterly Preventive Maintenance: Utility Task Vehicle | EA | 6 | $0.00 | |
| 0016 | Annual Preventive Maintenance: Utility Task Vehicle | EA | 2 | $0.00 | |
| 0017 | Quarterly Preventive Maintenance: Street Sweeper | EA | 6 | $0.00 | |
| 0018 | Annual Preventive Maintenance: Street Sweeper | EA | 2 | $0.00 | |
| 0019 | Quarterly Preventive Maintenance: Mobile Loading Ramp | EA | 3 | $0.00 | |
| 0020 | Annual Preventive Maintenance: Mobile Loading Ramp | EA | 1 | $0.00 | |
| 0021 | Repair/Replacement Parts | ROM - UN | 50000 | $1.00 | $50,000.00 |
| 0022 | Labor for Unscheduled Repairs | ROM - HR | 160 | $0.00 | |
| Base Year Total | FALSE |
| OPTION 1 - (12 Months) | Unit of Issue | Amount | Price | Extended Price | |
| 1001 | Quarterly Preventive Maintenance: Electric Forklift, 3-4k | EA | 36 | $0.00 | |
| 1002 | Annual Preventive Maintenance: Electric Forklift, 3-4k | EA | 12 | $0.00 | |
| 1003 | Quarterly Preventive Maintenance: Forklift, 5-10k | EA | 30 | $0.00 | |
| 1004 | Annual Preventive Maintenance: Forklift, 5-10k | EA | 10 | $0.00 | |
| 1005 | Quarterly Preventive Maintenance: Forklift, 12-19k | EA | 9 | $0.00 | |
| 1006 | Annual Preventive Maintenance: Forklift, 12-19k | EA | 3 | $0.00 | |
| 1007 | Quarterly Preventive Maintenance: Forklift, 30-39k | EA | 9 | $0.00 | |
| 1008 | Annual Preventive Maintenance: Forklift, 30-39k | EA | 3 | $0.00 | |
| 1009 | Quarterly Preventive Maintenance: Forklift, 50-59k | EA | 1 | $0.00 | |
| 1010 | Annual Preventive Maintenance: Forklift, 50-59k | EA | 1 | $0.00 | |
| 1011 | Quarterly Preventive Maintenance: Front End Loader | EA | 18 | $0.00 | |
| 1012 | Annual Preventive Maintenance: Front End Loader | EA | 6 | $0.00 | |
| 1013 | Quarterly Preventive Maintenance: Excavator | EA | 1 | $0.00 | |
| 1014 | Annual Preventive Maintenance: Excavator | EA | 1 | $0.00 | |
| 1015 | Quarterly Preventive Maintenance: Utility Task Vehicle | EA | 6 | $0.00 | |
| 1016 | Annual Preventive Maintenance: Utility Task Vehicle | EA | 2 | $0.00 | |
| 1017 | Quarterly Preventive Maintenance: Street Sweeper | EA | 6 | $0.00 | |
| 1018 | Annual Preventive Maintenance: Street Sweeper | EA | 2 | $0.00 | |
| 0019 | Quarterly Preventive Maintenance: Mobile Loading Ramp | EA | 3 | $0.00 | |
| 0020 | Annual Preventive Maintenance: Mobile Loading Ramp | EA | 1 | $0.00 | |
| 1019 | Repair/Replacement Parts | ROM - UN | 50000 | $1.00 | $50,000.00 |
| 1020 | Labor for Unscheduled Repairs | ROM - HR | 160 | $0.00 | |
| First Option Year Total | $50,000.00 |
| OPTION 2 - (12 Months) | Unit of Issue | Amount | Price | Extended Price | |
| 2001 | Quarterly Preventive Maintenance: Electric Forklift, 3-4k | EA | 36 | $0.00 | |
| 2002 | Annual Preventive Maintenance: Electric Forklift, 3-4k | EA | 12 | $0.00 | |
| 2003 | Quarterly Preventive Maintenance: Forklift, 5-10k | EA | 30 | $0.00 | |
| 2004 | Annual Preventive Maintenance: Forklift, 5-10k | EA | 10 | $0.00 | |
| 2005 | Quarterly Preventive Maintenance: Forklift, 12-19k | EA | 9 | $0.00 | |
| 2006 | Annual Preventive Maintenance: Forklift, 12-19k | EA | 3 | $0.00 | |
| 2007 | Quarterly Preventive Maintenance: Forklift, 30-39k | EA | 9 | $0.00 | |
| 2008 | Annual Preventive Maintenance: Forklift, 30-39k | EA | 3 | $0.00 | |
| 2009 | Quarterly Preventive Maintenance: Forklift, 50-59k | EA | 1 | $0.00 | |
| 2010 | Annual Preventive Maintenance: Forklift, 50-59k | EA | 1 | $0.00 | |
| 2011 | Quarterly Preventive Maintenance: Front End Loader | EA | 18 | $0.00 | |
| 2012 | Annual Preventive Maintenance: Front End Loader | EA | 6 | $0.00 | |
| 2013 | Quarterly Preventive Maintenance: Excavator | EA | 1 | $0.00 | |
| 2014 | Annual Preventive Maintenance: Excavator | EA | 1 | $0.00 | |
| 2015 | Quarterly Preventive Maintenance: Utility Task Vehicle | EA | 6 | $0.00 | |
| 2016 | Annual Preventive Maintenance: Utility Task Vehicle | EA | 2 | $0.00 | |
| 2017 | Quarterly Preventive Maintenance: Street Sweeper | EA | 6 | $0.00 | |
| 2018 | Annual Preventive Maintenance: Street Sweeper | EA | 2 | $0.00 | |
| 2019 | Quarterly Preventive Maintenance: Mobile Loading Ramp | EA | 3 | $0.00 | |
| 2020 | Annual Preventive Maintenance: Mobile Loading Ramp | EA | 1 | $0.00 | |
| 2019 | Repair/Replacement Parts | ROM - UN | 50000 | $1.00 | $50,000.00 |
| 2020 | Labor for Unscheduled Repairs | ROM - HR | 160 | $0.00 | |
| Second Option Year Total | $50,000.00 | ||||
| TOTAL ALL OPTIONS |
&"-,Bold"&14FOR OFFICIAL USE ONLY&"-,Regular"&11
PROCUREMENT SENSITIVE - SOURCE SELECTION INFORMATION
File details come from the government source that posted it. Updated .