This is a Price Schedule for the Bureau of Reclamation's HVAC Replacement and Maintenance solicitation (140R4026Q0151). The price schedule establishes the pricing structure for a five-year contract with a base year plus four option years, organized into eleven Contract Line Item Numbers (CLINs) requiring firm fixed pricing for maintenance services and not-to-exceed pricing for unplanned repairs.

The base year (CLIN 00010-00030) includes HVAC replacement services comprising mobilization, removal and replacement of evaporative and rooftop heat pump units, Trane Controls integration, and associated taxes and fees, followed by Year 1 maintenance with equipment evaluation. Year 1 unplanned repairs (CLIN 00030) are capped at $50,000 not-to-exceed with actual cost reimbursement for field technician labor, senior field technician labor (hourly rates), materials, supplies, and taxes. Option Years 1-4 (CLINs 00040-00110) follow the same structure, each containing a firm fixed-price maintenance CLIN and a $50,000 not-to-exceed unplanned repairs CLIN with reimbursement for direct labor, materials, equipment, supplies, travel, and taxes evidenced by invoices. All pricing must include labor, incidental materials, tools, equipment, and applicable taxes required to complete the HVAC services. The schedule requires vendors to complete line item pricing across all CLINs, as offers will not be considered for award on partial pricing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule The offer will be considered for award on the following Price Schedule; however, the offer will not be considered for award on only part of the Price Schedule.

The offer is subject to the terms and conditions of this solicitation.

Line Item No.
Supplies or Services
Quantity
Unit
Unit Price
Amount
CLIN 00010
HVAC Replacement
1
AU
Firm Fixed Price
$
1
Mobilization
1
AU
$
$
2
Remove and replace evaporative unit
1
AU
$
$
3
Remove and replace rooftop heat pump
1
AU
$
$
4
Trane Controls integration
1
AU
$
$
5
Taxes and Other Fees
1
AU
$
$
CLIN 00020
HVAC Maintenance Base Year
1
AU
Firm Fixed Price
$
1
HVAC Maintenance for Year 1
1
AU
$
$
2
Evaluation of existing equipment and controls
1
AU
$
$
3
Other-indicate
CLIN 00030
HVAC Maintenance Base Year - HVAC Unplanned Repairs and Part Replacements. - This CLIN is a pre-determined amount where BOR will pay actual costs for labor hours, materials, equipment, and supplies, travel, and tax evidenced by invoices for direct labor, materials, equipment, and supplies, travel costs, and tax used to accomplish the HVAC unplanned repair services. Not-to-Exceed amounts cannot be exceeded without formal contract modification. Must comply with section 4.3 of SOW
1
AU
Not-To-Exceed
$50,000.00
1
Unplanned Repair Labor – Field Technician
NTE
HR
$
2
Unplanned Repair Labor – Senior Field Technician
NTE
HR
$
3
Unplanned Repair – Materials/Supplies
1
AU
Reimbursed at actual cost
4
Taxes and other Fees
1
AU
Reimbursed at actual cost
CLIN 00040
HVAC Maintenance Year 2 (Option Year 1)
1
AU
Firm Fixed Price
$
1
HVAC Maintenance for Year 2
1
AU
$
$
2
Other-indicate
1
AU
$
$
CLIN 00050
HVAC Unplanned Repairs and Part Replacements Year 2 (Option Year 1) --

This CLIN is a pre-determined amount where BOR will pay actual costs for labor hours, materials, equipment, and supplies, travel, and tax evidenced by invoices for direct labor, materials, equipment, and supplies, travel costs, and tax used to accomplish the HVAC unplanned repair services. Not-to-Exceed amounts cannot be exceeded without formal contract modification. Must comply with section 4.3 of SOW

1
AU
Not-To-Exceed
$50,000.00
1
Unplanned Repair Labor – Field Technician
NTE
HR
$
2
Unplanned Repair Labor – Senior Field Technician
NTE
HR
$
3
Unplanned Repair – Materials/Supplies
1
AU
Reimbursed at actual cost
4
Taxes and other Fees
1
AU
Reimbursed at actual cost
CLIN 00060
HVAC Maintenance Year 3 (Option Year 2)
1
AU
Firm Fixed Price
$
1
HVAC Maintenance for Year 3
2
Other indicate
1
AU
$
$
CLIN 00070
HVAC Unplanned Repairs and Part Replacements Year 3 (Option Year 2) --

This CLIN is a pre-determined amount where BOR will pay actual costs for labor hours, materials, equipment, and supplies, travel, and tax evidenced by invoices for direct labor, materials, equipment, and supplies, travel costs, and tax used to accomplish the HVAC unplanned repair services. Not-to-Exceed amounts cannot be exceeded without formal contract modification. Must comply with section 4.3 of SOW

1
AU
Not-To-Exceed
$50,000.00
1
Unplanned Repair Labor – Field Technician
NTE
HR
$
2
Unplanned Repair Labor – Senior Field Technician
NTE
HR
$
3
Unplanned Repair – Materials/Supplies
1
AU
Reimbursed at actual cost
4
Taxes and other Fees
1
AU
Reimbursed at actual cost
CLIN 00080
HVAC Maintenance Year 4 (Option Year 3)
1
AU
Firm Fixed Price
$
1
HVAC Maintenance for Year 4
1
AU
$
$
2
Other-indicate
1
AU
$
$
CLIN 00090
HVAC Unplanned Repairs and Part Replacements Year 4 (Option Year 3) --

This CLIN is a pre-determined amount where BOR will pay actual costs for labor hours, materials, equipment, and supplies, travel, and tax evidenced by invoices for direct labor, materials, equipment, and supplies, travel costs, and tax used to accomplish the HVAC unplanned repair services. Not-to-Exceed amounts cannot be exceeded without formal contract modification. Must comply with section 4.3 of SOW

1
AU
Not-To-Exceed
$50,000.00
1
Unplanned Repair Labor – Field Technician
NTE
HR
$
2
Unplanned Repair Labor – Senior Field Technician
NTE
HR
$
3
Unplanned Repair – Materials/Supplies
1
AU
Reimbursed at actual cost
4
Taxes and other Fees
1
AU
Reimbursed at actual cost
CLIN 00100
HVAC Maintenance Year 5 (Option Year 4)
1
AU
Firm Fixed Price
$
1
HVAC Maintenance for Year 5
1
AU
$
$
2
Other-indicate
1
AU
$
$
CLIN 00110
HVAC Unplanned Repairs and Part Replacements Year 5 (Option Year 4) --

This CLIN is a pre-determined amount where BOR will pay actual costs for labor hours, materials, equipment, and supplies, travel, and tax evidenced by invoices for direct labor, materials, equipment, and supplies, travel costs, and tax used to accomplish the HVAC unplanned repair services. Not-to-Exceed amounts cannot be exceeded without formal contract modification. Must comply with section 4.3 of SOW.

1
AU
Not-To-Exceed
$50,000.00
1
Unplanned Repair Labor – Field Technician
NTE
HR
$
2
Unplanned Repair Labor – Senior Field Technician
NTE
HR
$
3
Unplanned Repair – Materials/Supplies
1
AU
Reimbursed at actual cost
4
Taxes and other Fees
1
AU
Reimbursed at actual cost
Clin 00010-00110 Subtotal
$

TOTAL CONTRACT PRICE

Note: There are multiple sublines that will need a price breakout. The prices shall include all labor, incidental materials, tools, equipment, and applicable taxes and fees required to replace the HVAC system.