Attachment 3 - Price Detail and Staff Matrix.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
Vessel Architecture Federal contract opportunity
Solicitation number
HTC71125RE129
Issued by
Department of Defense United States Transportation Command

About this file

The file is a Price Detail and Staff Matrix Excel spreadsheet for a Department of Defense United States Transportation Command solicitation (HTC711-25-R-E129) for Vessel Architecture. The document outlines a five-year contract structure with a base period and four option periods, each spanning from September 1 to August 31 of consecutive years (2025-2030). The pricing matrix is structured around four task areas: Contract Level & Project Management, Vessel Library Sustainment, Ship Library Sustainment Engineering, and Information Assurance.

The total proposed pricing remains consistent across all periods at $60,500 per year, composed of $60,000 for travel (not to exceed) and $500 for other direct costs (ODC). The total contract value over the five-year period is $302,500. Notably, while the document provides a detailed pricing framework, it does not include specific labor category rates or hours, indicating that offerors are expected to complete the matrix with their proposed labor categories, rates, and staffing levels. The document is marked as Controlled Unilateral Information (CUI) and Source Selection Sensitive, suggesting it is part of a competitive procurement process.

View the file

Other files for this federal contract opportunity

Other files attached to Vessel Architecture, newest first.
File Type Posted
Combined Synopsis_Solicitation HTC71125RE129 Amendment 0001.pdf PDF
Solicitation Amendment HTC71125RE1290001 SF 30.pdf PDF
Attachment 9 - HTC71125RE129 Vessel Architecture QA Matrix.pdf PDF
Attachment 8 - NDA.pdf PDF
RFP - HTC71125RE129.pdf PDF
Combined Synopsis_Solicitation HTC711-25-R-E129.pdf PDF
Attachment 7 - PWS.pdf PDF
Attachment 5 - PP Ref Sheet.docx DOCX document
Attachment 6 - PPQ.docx DOCX document
Attachment 4 - Past Performance Log.docx DOCX document
Attachment 2 - QASP.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rates

Proposed Labor Rates
Labor CategoriesBase PeriodOption Period 1Option Period 2Option Period 3Option Period 4
1 Sep 2025 - 31 Aug 20261 Sep 2026 - 31 Aug 20271 Sep 2027 - 31 Aug 20281 Sep 2028 - 31 Aug 20291 Sep 2029 - 31 Aug 2030
Proposed Contractor SiteProposed Contractor SiteProposed Contractor SiteProposed Contractor SiteProposed Contractor Site

&"Times New Roman,Regular"CUI

RFP HTC711-25-R-E129

Attachment 3

&"Times New Roman,Regular"Source Selection Sensitive - See FAR 2.101 and 3.104

CUI

Source Selection Sensitive When Filled In

Base Period

Price Detail & Staffing Matrix - Base Period - 1 Sep 2025 - 31 Aug 2026
Labor Category and Rates for Task Areas 1-4Totals By TaskCLIN STRUCTURE
Labor Category
Labor RateQuantityUnit of IssueUnit PriceCLIN
3.1 Task Area 1 – Contract Level & Project Management - Hours0
3.1 Task Area 1 – Contract Level & Project Management - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 00001 (FFP)
3.2 Task Area 2 – Vessel Library Sustainment - Hours0
3.2 Task Area 2 – Vessel Library Sustainment - - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 00002 (FFP)
3.3 Task Area 3 – Ship Library Sustainment Engineering - Hours0
3.3 Task Area 3 – Ship Library Sustainment Engineering - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 00003 (FFP)
3.4 Task Area 4 - Information Assurance - Hours
3.4 Task Area 4 - Information Assurance - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 00004 (FFP)
Total Hours Per Labor Category0000000
Total Labor Price$ - 0
Total Travel (NTE) PWS Para 4.7$ 60,000.001Lot$ 60,000.000005 (T&M)
Total ODC (NTE) PWS Para 4.8$ 500.001Lot$ 500.000006 (T&M)
Total Base Period Total$ 60,500.00

Indicate how many annual hours represent one FTE

Utilizing the labor categories in Column A on the Rates Tab, offeror shall list the labor categories and hours applicable to each task.
Offeror shall utilize the proposed labor rates in the Rates Tab for each labor category.
*Note* additional columns can be added as needed.

&"Times New Roman,Regular"CUI

RFP HTC711-25-R-E129

Attachment 3

&"Times New Roman,Regular"Source Selection Sensitive - See FAR 2.101 and 3.104

Source Selection Sensitive When Filled In

Option Period 1

Price Detail & Staffing Matrix - Base Period - 1 Sep 2026 - 31 Aug 2027
Labor Category and Rates for Task Areas 1-4Totals By TaskCLIN STRUCTURE
Labor Category
Labor RateQuantityUnit of IssueUnit PriceCLIN
3.1 Task Area 1 – Contract Level & Project Management - Hours0
3.1 Task Area 1 – Contract Level & Project Management - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 01001 (FFP)
3.2 Task Area 2 – Vessel Library Sustainment - Hours0
3.2 Task Area 2 – Vessel Library Sustainment - - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 01002 (FFP)
3.3 Task Area 3 – Ship Library Sustainment Engineering - Hours0
3.3 Task Area 3 – Ship Library Sustainment Engineering - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 01003 (FFP)
3.4 Task Area 4 - Information Assurance - Hours
3.4 Task Area 4 - Information Assurance - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 01004 (FFP)
Total Hours Per Labor Category0000000
Total Labor Price$ - 0
Total Travel (NTE) PWS Para 4.7$ 60,000.001Lot$ 60,000.001005 (T&M)
Total ODC (NTE) PWS Para 4.8$ 500.001Lot$ 500.001006 (T&M)
Total Base Period Total$ 60,500.00

Indicate how many annual hours represent one FTE

Utilizing the labor categories in Column A on the Rates Tab, offeror shall list the labor categories and hours applicable to each task.
Offeror shall utilize the proposed labor rates in the Rates Tab for each labor category.
*Note* additional columns can be added as needed.

&"Times New Roman,Regular"CUI

RFP HTC711-25-R-E129

Attachment 3

&"Times New Roman,Regular"Source Selection Sensitive - See FAR 2.101 and 3.104

Source Selection Sensitive When Filled In

Option Period 2

Price Detail & Staffing Matrix - Base Period - 1 Sep 2027 - 31 Aug 2028
Labor Category and Rates for Task Areas 1-4Totals By TaskCLIN STRUCTURE
Labor Category
Labor RateQuantityUnit of IssueUnit PriceCLIN
3.1 Task Area 1 – Contract Level & Project Management - Hours0
3.1 Task Area 1 – Contract Level & Project Management - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 02001 (FFP)
3.2 Task Area 2 – Vessel Library Sustainment - Hours0
3.2 Task Area 2 – Vessel Library Sustainment - - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 02002 (FFP)
3.3 Task Area 3 – Ship Library Sustainment Engineering - Hours0
3.3 Task Area 3 – Ship Library Sustainment Engineering - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 02003 (FFP)
3.4 Task Area 4 - Information Assurance - Hours
3.4 Task Area 4 - Information Assurance - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 02004 (FFP)
Total Hours Per Labor Category0000000
Total Labor Price$ - 0
Total Travel (NTE) PWS Para 4.7$ 60,000.001Lot$ 60,000.002005 (T&M)
Total ODC (NTE) PWS Para 4.8$ 500.001Lot$ 500.002006 (T&M)
Total Base Period Total$ 60,500.00

Indicate how many annual hours represent one FTE

Utilizing the labor categories in Column A on the Rates Tab, offeror shall list the labor categories and hours applicable to each task.
Offeror shall utilize the proposed labor rates in the Rates Tab for each labor category.
*Note* additional columns can be added as needed.

CUI

RFP HTC711-25-R-E129

Attachment 3

Source Selection Sensitive - See FAR 2.101 and 3.104

Source Selection Sensitive When Filled In

Option Period 3

Price Detail & Staffing Matrix - Base Period - 1 Sep 2028 - 31 Aug 2029
Labor Category and Rates for Task Areas 1-4Totals By TaskCLIN STRUCTURE
Labor Category
Labor RateQuantityUnit of IssueUnit PriceCLIN
3.1 Task Area 1 – Contract Level & Project Management - Hours0
3.1 Task Area 1 – Contract Level & Project Management - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 03001 (FFP)
3.2 Task Area 2 – Vessel Library Sustainment - Hours0
3.2 Task Area 2 – Vessel Library Sustainment - - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 03002 (FFP)
3.3 Task Area 3 – Ship Library Sustainment Engineering - Hours0
3.3 Task Area 3 – Ship Library Sustainment Engineering - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 03003 (FFP)
3.4 Task Area 4 - Information Assurance - Hours
3.4 Task Area 4 - Information Assurance - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 03004 (FFP)
Total Hours Per Labor Category0000000
Total Labor Price$ - 0
Total Travel (NTE) PWS Para 4.7$ 60,000.001Lot$ 60,000.003005 (T&M)
Total ODC (NTE) PWS Para 4.8$ 500.001Lot$ 500.003006 (T&M)
Total Base Period Total$ 60,500.00

Indicate how many annual hours represent one FTE

Utilizing the labor categories in Column A on the Rates Tab, offeror shall list the labor categories and hours applicable to each task.
Offeror shall utilize the proposed labor rates in the Rates Tab for each labor category.
*Note* additional columns can be added as needed.

CUI

RFP HTC711-25-R-E129

Attachment 3

Source Selection Sensitive - See FAR 2.101 and 3.104

Source Selection Sensitive When Filled In

Option Period 4

Price Detail & Staffing Matrix - Base Period - 1 Sep 2029 - 31 Aug 2030
Labor Category and Rates for Task Areas 1-4Totals By TaskCLIN STRUCTURE
Labor Category
Labor RateQuantityUnit of IssueUnit PriceCLIN
3.1 Task Area 1 – Contract Level & Project Management - Hours0
3.1 Task Area 1 – Contract Level & Project Management - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 04001 (FFP)
3.2 Task Area 2 – Vessel Library Sustainment - Hours0
3.2 Task Area 2 – Vessel Library Sustainment - - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 04002 (FFP)
3.3 Task Area 3 – Ship Library Sustainment Engineering - Hours0
3.3 Task Area 3 – Ship Library Sustainment Engineering - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 04003 (FFP)
3.4 Task Area 4 - Information Assurance - Hours
3.4 Task Area 4 - Information Assurance - Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 012Month$ - 04004 (FFP)
Total Hours Per Labor Category0000000
Total Labor Price$ - 0
Total Travel (NTE) PWS Para 4.7$ 60,000.001Lot$ 60,000.004005 (T&M)
Total ODC (NTE) PWS Para 4.8$ 500.001Lot$ 500.004006 (T&M)
Total Base Period Total$ 60,500.00

Indicate how many annual hours represent one FTE

Utilizing the labor categories in Column A on the Rates Tab, offeror shall list the labor categories and hours applicable to each task.
Offeror shall utilize the proposed labor rates in the Rates Tab for each labor category.
*Note* additional columns can be added as needed.

CUI

RFP HTC711-25-R-E129

Attachment 3

Source Selection Sensitive - See FAR 2.101 and 3.104

Source Selection Sensitive When Filled In

Total Proposed Price

PeriodTotal LaborTravelODCTotal Price
Base Period$ - 0$ 60,000.00$ 500.00$ 60,500.00
Option Period 1$ - 0$ 60,000.00$ 500.00$ 60,500.00
Option Period 2$ - 0$ 60,000.00$ 500.00$ 60,500.00
Option Period 3$ - 0$ 60,000.00$ 500.00$ 60,500.00
Option Period 4$ - 0$ 60,000.00$ 500.00$ 60,500.00
Total Proposed Price$ - 0$ 300,000.00$ 2,500.00$ 302,500.00

CUI

RFP HTC711-25-R-E129

Attachment 3

Source Selection Sensitive - See FAR 2.101 and 3.104

Source Selection Sensitive When Filled In

File details come from the government source that posted it. Updated .