This document provides details of a federal contract opportunity for construction services. The Department of Veterans Affairs National Cemetery Administration is seeking offers for the construction of a new rural cemetery in Cedar City, Utah through Solicitation Number 36C78623B0011. Offerors must completely prepare the site for construction, demolishing existing structures and furnishing all labor, materials, and equipment to develop the Cedar City National Cemetery according to provided drawings and specifications within four hundred and eighty calendar days of the notice to proceed. The estimated value of this contract is between $5,000,000 to $10,000,000. This is a 100% set-aside for small businesses with a NAICS code of 237990 and size standard of $39.5 million. Offers are due on or around August 25, 2022 and must be submitted through the System for Award Management database. The point of contact for inquiries is Shane Hilts of the Department of Veterans Affairs National Cemetery Administration.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
COVERSHEET
SCALE: NTS
N
SHEET INDEX
SHEET NO. DRAWING NO. SHEET TITLE
1 G-001 COVER SHEET
DEPARTMENT OF VETERANS AFFAIRS
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
NCA PROJECT NO. 942CM3001
2181 W. 1600 S., CEDAR CITY, UTAH 84721
V-101 TOPOGRAPHIC / UTILITY SURVEY
SITE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
7/22/2022Revisions: Date:
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of 61
Environment & Infrastructure Solutions, Inc.
BID DOCUMENT SUBMITTAL
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
C O
L
O
R
A
D
O
L
I
C
E
N
S
E
D
A
R
C
H
I T
E
C
T
S E A
N
M
F
IT
Z
P
A
T
R
I C K
7/22/22
C-101 SITE PLAN
A-501
A-502 MEMORIAL WALL DETAILS 1
SFTM
SITE
ARCHITECT / ENGINEER CONSULTANT ENGINEER LANDSCAPE ARCHITECT
VALI COOPER INTERNATIONAL, LLC WOOD ENVIRONMENT & INFRASTRUCTURE MRWM LANDSCAPE ARCHITECTS
SOLUTIONS, INC.
DENVER, CO 80249 KENNESAW, GA 30144 ALBUQUERQUE, NM 87102
CONTACT: SEAN FITZPATRICK CONTACT: SORAYA AGUDELO CONTACT: BRIAN VERARDO
SEAN@VALIINT.COM SORAYA.AGUDELO@WOODPLC.COM BVERARDO@WRMWLA.COM
720-491-7559 470-763-1332 505-268-2266
SURVEYOR SITE OWNER BIOLOGICAL ASSESSMENT
PLATT & PLATT INC VA NCA TRANSCON EVIRONMENTAL, INC
CONTACT: DAVE CLARKE CEDAR CITY, UT DRAPER, UT
CEDAR CITY, UT 84720 CONTACT: STEVE DAVIS CONTACT: ERICA WRIGHTMAN
PLATT@INFOWEST.COM STEVE.DAVIS@VA.GOV EWRIGHTMAN@TRANSCON.COM
435-586-6151 202-632-4833 801-649-5141 X317
A-101 FLOOR & ROOF PLANS AND PLAZA LAYOUT
A-201 EXTERIOR ELEVATIONS
A-301 BUILDING & WALL SECTIONS
E-601 ELECTRICAL SCHEDULES
LI101 IRRIGATION PLAN
E-001 ELECTRICAL NOTES & LEGENDS
E-101 ELECTRICAL SITE PLAN
A-202 COLUMBARIUM & MEMORIAL WALL ELEVATIONS
A-401
COLUMBARIUM & MEMORIAL WALL ENLARGED PLANS, CAPS & DETAILS
CODE OF CONDUCT
1. BURIAL CEREMONIES WILL BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT. COORDINATE
DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED REPRESENTATIVE TO ACCOMMODATE
SCHEDULED BURIALS. CONTRACTOR SHALL OBTAIN THE SCHEDULE FOR THE NEXT DAY SERVICES PRIOR TO
THE CLOSE OF BUSINESS EACH DAY. ALLOWABLE WORK TO BE DETERMINED BY THE CEMETERY DIRECTOR.
2. BECAUSE OF THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK
AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED IN
APPROVED CONTAINERS AND ROUTINELY DISPOSED OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF
EACH DAY AND/OR MORE FREQUENTLY AS REQUIRED.
3. THE CONTRACTORS STAFF AND SUBCONTRACTORS STAFF SHALL NOT: DRESS IN SLEEVELESS SHIRTS OR
SHORT PANTS, WEAR CLOTHING WITH INAPPROPRIATE LOGOS, PLAY MUSIC, TALK LOUD, PLACE PERSONAL
ITEMS ON HEADSTONES, LEAN AGAINST OR SIT ON HEADSTONES.
4. THE EFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMAL AND SHALL BE COORDINATED WITH THE
CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH
PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS.
5. DO NOT WORK UPON NOR STORE ANY MATERIALS ON OCCUPIED GRAVE PLOTS. ALL EFFORT WILL BE MADE
TO MAINTAIN DISTANCE FROM OCCUPIED GRAVE PLOTS.
1. TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PERFORMED BY PLATT & PLATT, INC CIVIL
ENGINEERS AND SURVEYORS DATED 22 MAY 2019. THE GENERAL CONTRACTOR SHALL VERIFY ALL
SURVEY INFORMATION.
2. ALL ELEVATIONS ARE NAVD 88 VERTICAL DATUM BASED ON GPS OBSERVATION.
3. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE INFORMATION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL UTILITIES
PRIOR TO BEGINNING ANY WORK. IF UTILITIES OTHER THAN THOSE SHOWN HEREON ARE ENCOUNTERED, THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY AND TAKE APPROPRIATE MEASURES TO
PROTECT THE LINE(S) AND ENSURE CONTINUED SERVICE. DAMAGE CAUSED TO EXISTING UTILITIES BY
THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
THE CONTRACTOR SHALL VERIFY THE CONNECTION POINTS OF NEW UTILITIES TO EXISTING UTILITIES
PRIOR TO BEGINNING CONSTRUCTION.
4. THE CONTRACTOR SHALL INSTALL TREE PROTECTION BARRICADES PRIOR TO BEGINNING EARTHWORK
OPERATIONS.
5. THE CONTRACTOR SHALL NOTIFY THE CO/COR IF UNSUITABLE MATERIAL IS DISCOVERED PRIOR TO
BEGINNING ANY REMOVAL OPERATION. (SEE SPECIFICATION SECTION 31.20.00)
6. THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREA WITH SOD OR MULCH, NOT SHOWN FOR
ASPHALT OR CONCRETE, WITHIN LIMITS OF DEMOLITION AND PROPOSED WORK. THIS INCLUDES
STAGING AREA AND LAYDOWN AREAS.
7. ALL AREAS DISTURBED DUE TO CONSTRUCTION ACTIVITIES SHALL BE RESTORED, FOR AREAS
REQUIRING SEEDING, THE CONTRACTOR AT HIS EXPENSE IS RESPONSIBLE FOR PROVIDING TEMPORARY
IRRIGATION UNTIL ACCEPTANCE BY THE GOVERNMENT. WATER FOR IRRIGATION WILL BE PROVIDED BY
THE CONTRACTOR AT HIS EXPENSE.
8. CONTRACTOR SHALL GRADE ALL DISTURBED AREAS TO DRAIN FOR POSITIVE FLOW PRIOR TO FINAL
APPROVAL.
9. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND TEMPORARY SUPPORTS, ETC. IS
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
10. IN PERFORMING CONSTRUCTION OBSERVATION VISITS TO THE JOB SITE, THE ENGINEER SHALL HAVE
NEITHER CONTROL OVER NOR RESPONSIBILITY FOR THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK.
11. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING
THE WORK IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR, WHO IS ALSO RESPONSIBLE FOR
COMPLYING WITH ALL HEALTH AND SAFETY PRECAUTIONS AS REQUIRED BY ANY REGULATORY AGENCY.
12. MATERIAL QUANTITIES ARE ESTIMATED FOR INFORMATION PURPOSES ONLY. CONTRACTOR IS
RESPONSIBLE FOR VERIFYING ALL QUANTITIES OF REPAIRED OR REPLACED MATERIALS.
13. THERE SHALL BE AT ALL TIMES, WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED
OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE. THIS COMPETENT PERSON SHALL
BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. HE SHALL BE AWARE AND
KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. HE SHALL BE EMPOWERED TO
IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
14. CONTRACTOR SHALL PREPARE AND SUBMIT A WELDING PLAN TO THE CONTRACTING OFFICER'S
TECHNICAL REPRESENTATIVE PRIOR TO PERFORMING ANY FIELD WELDING. FOLLOWING APPROVAL ALL
WELDS SHALL BE PERFORMED IN ACCORDANCE WITH THE APPROVED PLAN.
15. CONTRACTOR TO CONSTRUCT ROADS AND OTHER PAVED AREAS IN SUCH A MANNER AS TO ENSURE
THAT NO AREAS RESULT IN PONDING OF WATER.
GENERAL NOTES
PROJECT TEAM
COLUMBARIUM AND MEMORIAL WALL SECTIONS
A-503 MEMORIAL WALL DETAILS 2
A-504 COLUMBARIUM DETAILS 1
A-505 COLUMBARIUM DETAILS 2
A-506 DETAILS
A-507 SITE AMENITY DETAILS
A-508 SIGNAGE ELEVATION DETAILS
A-509 SIGNAGE PANEL DETAILS & CONSTRUCTION SIGNAGE
A-510 SIGNAGE STRUCTURAL DETAILS
A-511 FENCING DETAILS 1
4 V-102 TOPOGRAPHIC / UTILITY SURVEY W/O TREES
2 G-101 FENCING AND CONSTRUCTION STAGING PLAN
5 D-101 DEMOLITION PLAN
7 C-102 GRADING & UTILITY PLAN
8 C-103 INITIAL EROSION & SEDIMENTATION CONTROL PLAN
9 C-104 INTERMEDIATE EROSION & SEDIMENTATION CONTROL PLAN
10 C-201 ROADWAY PLAN AND PROFILE
11 C-202 STORM DRAIN PROFILES
C-403
GRAVESITE NUMBERING PLAN - SECTIONS 1, 2, 3 AND 4
C-501 GRAVESITE DETAILS 1 OF 2
C-502 GRAVESITE DETAILS 2 OF 2
C-503 SITE DETAILS 1 OF 2
C-504 SITE DETAILS 2 OF 2
C-505 EROSION CONTROL DETAILS
LI501 IRRIGATION DETAILS 1
LI502 IRRIGATION DETAILS 2
LI503 IRRIGATION DETAILS 3
LP101 PLANTING PLAN
A-512 FENCING DETAILS 2
S-504 TYPICAL MASONRY DETAILS
S-502 COLUMBARIUM AND WALLS STRUCTURAL DETAILS
S-503 ORNAMENTAL FENCE STRUCTURAL DTLS
S-001 STRUCTURAL GENERAL NOTES
S-101 COMMITTAL SHELTER FOUNDATION PLAN
S-102 FOUNDATION AND RETAINING WALL PLANS
S-501 COMMITTAL SHELTER DETAILS
A-513 MISC. SITE DETAILS
CEDAR CITY, UT
1. A QUALIFIED BIOLOGIST* RETAINED BY THE CONTRACTOR SHALL PERFORM A PRE-CONSTRUCTION PROTOCOL
SURVEY FOR UTAH PRAIRIE DOGS (UPD) TO LOOK FOR SIGNS (FRESH DIGGING, BURROWS, SCAT) OF
HABITAT/PRESENCE WITHIN THE PROJECT SITE AS WELL AS SUITABLE HABITAT WITHIN THE 1,000-FOOT
PROJECT BUFFER NO MORE THAN SEVEN DAYS PRIOR TO INITIAL CONSTRUCTION.
2. "IF UPD OR ITS SIGN (BURROWS, FRESH DIGGING, SCAT) IS IDENTIFIED WITHIN THE PROJECT SITE (8.14 ACRES)
PRIOR TO OR DURING CONSTRUCTION, STOP WORK IMMEDIATELY UNTIL FURTHER NOTICE AND CONTACT USFWS
AT 801-975-3330 TO REINITIATE CONSULTATION."
3. PRIOR TO THE START OF CONSTRUCTION ACTIVITIES, ALL WORKERS WILL BE INFORMED OF THE POTENTIAL
PRESENCE OF UTAH PRAIRIE DOGS WITHIN THE PROJECT SITE AND IN THE NEARBY AREAS. THE WORKERS
SHALL BE INFORMED OF THE THREATENED STATUS OF THE SPECIES, IDENTIFICATION, LEGAL PROTECTIONS, AVOIDANCE AND MINIMIZATION MEASURES, BEST MANAGEMENT PRACTICES, AND APPLICABLE CONSERVATION
MEASURES FOR THE PRAIRIE DOG.
4. ALL PROJECT EMPLOYEES WILL BE ADVISED AS TO THE DEFINITION OF “TAKE” AND THE POTENTIAL PENALTIES
(UP TO $200,000 IN FINES AND ONE YEAR IN PRISON) FOR TAKING A SPECIES LISTED UNDER THE ENDANGERED
SPECIES ACT. TAKE IS DEFINED AS “TO HARASS, HARM, PURSUE, HUNT, SHOOT, WOUND, KILL, TRAP, CAPTURE, COLLECT, OR TO ATTEMPT TO ENGAGE IN ANY SUCH CONDUCT; MAY INCLUDE SIGNIFICANT HABITAT
MODIFICATION OR DEGRADATION IF IT KILLS OR INJURES WILDLIFE BY SIGNIFICANTLY IMPAIRING ESSENTIAL
BEHAVIORAL PATTERNS INCLUDING BREEDING, FEEDING, OR SHELTERING.”
5. LIMIT CONSTRUCTION ACTIVITIES TO DAYLIGHT HOURS TO THE EXTENT POSSIBLE.
6. OBSERVE POSTED SPEED LIMIT SIGNS ON LOCAL ROADS AND OBSERVE A 15-MILE-PER-HOUR SPEED LIMIT
ALONG INGRESS/EGRESS ROUTES.
7. PROPERLY DISPOSE OF AND REMOVE GARBAGE FROM THE CONSTRUCTION SITE AREA REGULARLY DURING THE
CONSTRUCTION PERIOD.
8. CONSTRUCTION PERSONNEL WILL NOT DISCHARGE FIREARMS OR POSSESS PETS WITHIN THE PROJECT SITE
AND 1,000-FOOT BUFFER.
*QUALIFIED BIOLOGIST (I.E., A BIOLOGIST WITH A BACHELOR'S DEGREE OR GRADUATE DEGREE IN BIOLOGY, ECOLOGY, WILDLIFE BIOLOGY, MAMMALOGY, OR RELATED FIELDS; OR HE/SHE MUST HAVE DEMONSTRATED PRIOR FIELD
EXPERIENCE USING ACCEPTED RESOURCE AGENCY TECHNIQUES TO SURVEY FOR UTAH PRAIRIE DOGS (UPDS), A
MINIMUM OF 20 HOURS OF DOCUMENTED FIELD EXPERIENCE SURVEYING AND MONITORING UPDS AND SIGNS, AND/OR
COMPLETION OF THE OFFICIAL UPD TRAINING EVERY FOUR YEARS) OR CERTIFICATION AS A UPD SPECIALIST BY THE
USFWS (REQUIRES COMPLETION OF UPD TRAINING).
WHEN PRAIRIE DOG OR ITS SIGN ARE IDENTIFIED WITHIN THE 350-FOOT USFWS PROTOCOL BUFFER OF THE PROJECT
SITE (8.14 ACRES), THESE ADDITIONAL CONSERVATION MEASURES WILL BE IMPLEMENTED TO AVOID AND MINIZINE
EFFECTS ON THE PRAIRIE DOG AND ITS HABITAT:
1. RETAIN A QUALIFIED BIOLOGIST, BIOLOGICAL MONITOR, TO BE PRESENT DURING CONSTRUCTION ACTIVITIES
WHEN WORK OCCURS WITHIN 350-FEET OF OCCUPIED PRAIRIE DOG HABITAT.
2. THE CONTRACTOR SHALL STOP WORK IF A PRAIRIE DOG IS ENCOUNTERED WITHIN THE PROJECT SITE AND
PERCEIVED TO BE IN HARM'S WAY. CONSTRUCTION ACTIVITIES WILL CEASE UNTIL IT IS DETERMINED THAT THE
PRAIRIE DOG WILL NOT BE HARMED OR THAT IT HAS LEFT THE CONSTRUCTION AREA ON ITS OWN. THE
CONTRACTOR SHALL NOTIFY USFS AS WELL AS THE NCA COR/PM IF PRAIRIE DOGS ARE HARMED.
3. INSTALL APPROVED TEMPORARY FENCING MATERIAL PRIOR TO CONSTRUCTION ACTIVITIES WITHIN 350-FEET OF
OCCUPIED PRAIRIE DOG HABITAT TO DETER PRAIRIE DOGS FROM ENTERING THE PROJECT SITE AND AVOID
ENTRAPPING PRAIRIE DOG WITHIN THE LIMITS OF CONSTRUCTION. THE FENCING WILL HAVE A MINIMUM HEIGHT
OF 2 FEET FROM THE GROUND SURFACE AND BE BURIED ADEQUATELY. THE CONTRACTOR SHALL ENSURE THAT
ANY CONSTRUCTION BARRIER FENCING IS MAINTAINED.
4. AVOID WILDLIFE ENTRAPMENT BY COMPLETELY COVERING, OR PROVIDING ESCAPE RAMPS FOR, ALL EXCAVATED
STEEP-WALLED HOLES OR TRENCHES MORE THAN 1-FOOT-DEEP AT THE END OF EACH WORK DAY.
5. PROJECT EMPLOYEES WILL INSPECT THE WORK AREA AND ANY EQUIPMENT OR MATERIAL LEFT ON SITE
OVERNIGHT FOR PRAIRIE DOGS PRIOR TO THE START OF CONSTRUCTION ACTIVITIES EACH DAY.
6. AVOIDABLE MAINTENANCE OF CONSTRUCTION EQUIPMENT SHALL BE PERFORMED OFF-SITE LOCATION 350-FEET
AWAY FROM IDENTIFIED UPD COLONIES.
7. CONTRACTOR SHALL COORDINATE WITH USFWS FOR FINAL INSPECTIONS AND APPROVALS OF THE
FINAL UPD FENCING.
CONTRACTOR / AGENCY COORDINATION REQUIREMENTS
US FISH & WILDLIFE SERVICES
WEST VALLEY CITY, UT
CONTACT: KATE NOWAK
KATE_NOVAK@FWS.GOV
801-975-3330 X132
C-401 ENLARGED SITE PLAN
C-402 ENLARGED GRADING PLAN
S-201 ORNAMENTAL FENCE ELEVATION
T-101 TELECOMMUNICATIONS PLANS AND DETAILS
SECTION
NUMBERS
IGC'S 2055
MEMORIALS 384
SIZEBURIAL TYPE
4X4
TOTAL
QUANTITY
N/A N/A
PRV'S 1864X10
PPC'S 29993X8
OSV'S 1614X10SEC 1
COLUMBARIUM NICHES 1280N/A N/A
ACREAGE
0.74
N/A
0.19
1.33
0.18
N/A
PHASE 1
QUANTITY
BURIAL SUMMARY
FIRM PANEL
VICINITY MAP
SCALE: NTS
N
C-203 SANITARY SEWER PLAN AND PROFILE
C-506 UTILITY DETAILS 1 OF 2
E-102 ELECTRICAL PLANS - RESTROOM AND PUMP HOUSE
C-511 UNDERGROUND DETENTION FACILITY 1 OF 2
C-512 UNDERGROUND DETENTION FACILITY 2 OF 2
C-507 UTILITY DETAILS 2 OF 2
SEC 2
SEC 4
SEC 3
PPC'S N/A3X8 1.33414SEC 5
PPC'S N/A3X8 1.33390SEC 6
C-404 GRAVESITE NUMBERING PLAN - SECTIONS 5 AND 6
AutoCAD SHX Text
1075 BIG SHANTY ROAD, NW, SUITE 100 KENNESAW, GEORGIA 30144 (770) 421-3400
AutoCAD SHX Text 00404366
G
ETTYSBU
R G
PLAQ
U
E
GRAVESITE
LOCATOR
KIOSK
BIVO
UAC O
F THE DEAD
PLAQ
UE
PATRIOTIC
SLOGAN
EH-1
LOCKING BAR
BLACK PRIVACY SLATS PROVIDING
APPROXIMATELY 75% WIND LOAD
AND SCREENING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
G-101
CAP MJL
FENCING AND CONSTRUCTION
STAGING PLAN
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
WMH
20.00' P.U.E.
20.00'
WATERLINE
EASEMENT
P.O.B. PARCEL 1
348.22'
N57° 2 9' 0
7"E 128.76'
PARCEL 2
(VACATED EASEMENT)
S89° 51' 05"W 389.12' 40.90'
S ' 2
"E
.8
N90° 00' 00"E 364.70'
S89° 29' 35"W 147.14'
S2 7°
5'
9"
W
.1
7'
SECTION LINE
BBE REBAR
AND CAP
20.00' WATER LINE
ACCESS AND
MAINTENANCE
EASEMENT
66.00'
ROADWAY
& UTILITY EASEMENT
21 22
28 27
BASIS OF BEARINGS
1/4 CORNER
SECTIONS 21 & 28
BBE MONUMENT
S89° 51' 05"W
BBE REBAR
AND CAP
N89° 51' 05"E 150.02'
SECTION CORNER
ICSM
PR
O
VI
DE
NC
E
CE
NT
ER
D
RI
VE
1600 SOUTH STREET
(DEDICATED
PUBLIC RIGHT-OF-W
AY)
FLOW
15.00' P.U.E.
15.00' P.U.E.
15.00' P.U.E.
SURFACE DITCH
S.I.T.L.A
PROVIDENCE QUANTUM
BUILDERS, L.C.
CEDAR CITY
CORPORATION
UTAH STATE
BUILDING
OWNERSHIP
AUTHORITY
CEDAR CITY
CORPORATION
EXIT 57 PROPERTIES,
LLC
CEDAR CITY
CORPORATION
20.00' P.U.E.
20.00' P.U.E.
SCM
FIRE HYDRANT
N ' 3
.6
N4 4°
1'
"E
.4 6'
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
06028.00
6029.00
.0
.0
.0
6033.00
6034.00
6035.00
6036.00
6037.00
6038.00
6039.00
6040.00
6041.00
6042.00
6043.00
6044.00
6045.00
.0
.0
.0
.0
.0
6051.00
.0
.0
6048.00
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
06062.00
.0
.0
OHP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
Feet
0 50 100
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
7/22/2022Revisions: Date:
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of 61
BID DOCUMENT SUBMITTAL
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
LEGEND
TREE 1" TO 6" Ø
TREE 7" TO 24" Ø
TREE 25" Ø AND UP
DENOTES 5/8" DIAMETER BY 20" REBAR WITH YELLOW
PLASTIC STAMPED PLATT & PLATT, INC. L.S. 164659
EXISTING CORNERS ARE AS NOTED HERON.
OVERHEAD POWER LINE
POWER POLE
V-101
TOPOGRAPHIC / UTILITY SURVEY
PR
OF
ES
SI
ONA
L LAND SURVEYOR
* HATU FO ETAT
S
MEPDMC
AutoCAD SHX Text
USA VETERANS ADMINISTRATION 8.14 ACRES
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text LEGAL DESCRIPTION - PARCEL 1 BEGINNING AT A POINT S.89°51’05”W. 150.02 FEET ALONG THE SECTION 05”W. 150.02 FEET ALONG THE SECTION W. 150.02 FEET ALONG THE SECTION LINE FROM THE SOUTHEAST CORNER OF SECTION 21, TOWNSHIP 36 SOUTH, RANGE 11 WEST, SLB&M, THENCE S.89°51'05"W. 389.12 FEET ALONG SAID SECTION LINE, THENCE S.27°55'19"W. 485.17 FEET, THENCE S.89°29'35"W. 147.14 FEET, THENCE N.0°22'37"E. 483.68 FEET, THENCE N.44°41'33"E. 396.46 FEET, THENCE N.57°52'19"E. 130.34 FEET, THENCE N.90°00'00"E. 362.90 FEET. THENCE S.1°09'20"E. 403.91 FT. TO THE POINT OF BEGINNING. CONTAINING 8.14 ACRES OF LAND. PARCEL 2 - ACCESS RIGHT-OF-WAY TOGETHER WITH A 60.00 FOOT ROADWAY AND UTILITY EASEMENT, 30.00 FEET EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: BEGINNING AT A POINT LOCATED N.01°09'20"W. 516.97 FEET AND N.90°00'00"W. 515.84 FEET FROM THE SOUTHWEST CORNER OF SECTION 22, TOWNSHIP 36 SOUTH, RANGE 11 WEST, SLB&M, THENCE N.60°14'52"E. 132.55 FEET TO A CURVE TO THE RIGHT HAVING A RADIUS OF 297.00 FEET AND A CENTRAL ANGLE OF 30°26'55", THENCE NORTHEASTERLY ALONG SAID CURVE 157.83 FEET TO THE P.T., THENCE S.89°18'13"E. 284.56 FEET TO A CURVE TO THE RIGHT HAVING A RADIUS OF 300.00 FEET AND A CENTRAL ANGLE OF 27°54'31", THENCE SOUTHEASTERLY ALONG SAID CURVE 146.13 FEET TO THE P.T., THENCE S.61°23'42"E. 83.50 FEET TO THE POINT OF ENDING. SAID POINT ALSO BEING ON THE WEST RIGHT-OF-WAY LINE OF PROVIDENCE CENTER DRIVE. ALSO TOGETHER WITH AN ACCESS EASEMENT OVER AND ACROSS THE FOLLOWING DESCRIBED PROPERTY: BEGINNING AT A POINT LOCATED N.01°09'20"W. 516.97 FEET AND N.90°00'00"W. 515.84 FEET FROM THE SOUTHWEST CORNER OF SECTION 22, TOWNSHIP 36 SOUTH, RANGE 11 WEST, SLB&M, S.02°37'28"E., 113.54 FEET, THENCE S.57°53'18"W. 68.92 FEET, THENCE N.02°37'28"W. 150.44 FEET, THENCE N.60°14'52"E. 67.41 FEET, THENCE S.02°37'28"E. 33.71 FEET TO THE POINT OF BEGINNING. (VACATED BY PUBLIC ROAD DEDICATION) 1600 SOUTH STREET DESCRIPTION (PER ROAD DEDICATION PLAT) BEGINNING AT A POINT ON THE EAST SECTION LINE OF SECTION 21, TOWNSHIP 36 SOUTH, RANGE 11 WEST OF THE SALT LAKE BASE AND MERIDIAN, SAID POINT BEING N.01°09'20"W. ALONG SAID SECTION LINE AND 585.87 FEET FROM THE SOUTHEAST CORNER OF SAID SECTION 21 AND RUNNING THENCE N.89°18'13"W. 32.50 FEET TO THE POINT OF CURVATURE OF A 267.00 FOOT RADIUS CURVE TO THE LEFT; THENCE 113.36 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 24°19'34"; THENCE S.66°22'13"W. 395.14 FEET TO THE POINT OF CURVATURE OF A 580.00 FOOT RADIUS CURVE TO THE LEFT; THENCE 214.64 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 21°12'11"; THENCE S.45°10'02"W. 318.38 FEET; THENCE N.44°49'58"W. 66.00 FEET; THENCE N.45°10'02"E. 318.38 FEET TO THE POINT OF CURVATURE OF A 646.00 FOOT RADIUS CURVE TO THE RIGHT; THENCE 239.06 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 21°12'11"; THENCE N.66°22'13"E. 395.14 FEET TO THE POINT OF CURVATURE OF A 333.00 FOOT RADIUS CURVE TO THE RIGHT; THENCE 141.38 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 24°19'34"; THENCE S.89°18'13"E 58.67 FEET TO THE POINT OF CURVATURE OF A 333.00 FOOT RADIUS CURVE TO THE RIGHT; THENCE 154.07 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 26°30'35"; THENCE S.62°47'38"E. 70.49 FEET TO THE POINT OF CURVATURE OF A 30.00 FOOT RADIUS CURVE TO THE LEFT; THENCE 46.07 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 87°59'45" TO A POINT ON THE WESTERLY RIGHT-OF-WAY OF PROVIDENCE CENTER DRIVE (A 90.00 FOOT WIDE PUBLIC STREET); THENCE SOUTHWESTERLY ALONG SAID RIGHT-OF-WAY THE FOLLOWING TOW (2) COURSES; (1) S.29°12'23"W. 13.21 FEET TO THE POINT OF CURVATURE OF A 1084.93 FOOT RADIUS CURVE TO THE LEFT; THENCE (2) 109.82 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 5°47'59" TO THE POINT OF CUSP OF A 30.00 FOOT RADIUS CURVE THE CENTER OF WHICH BEARS N.66°35'50"W.; THENCE NORTHWESTERLY 45.13 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 86°11'49"; THENCE N.62°47'38"W. 71.80 FEET TO THE POINT OF CURVATURE OF A 267.00 FOOT RADIUS CURVE TO THE LEFT; THENCE 123.54 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 26°30'35"; THENCE N.89°18'13"W 26.17 FEET TO THE POINT OF BEGINNING. CONTAINS 90422.94 SQFT OR 2.076 ACRES. (ENTRY NO. 00726076, AT BOOK 1438, PAGE 1643, 18TH OF MARCH 2019, IRON COUNTY RECORDS) PROPERTY ADDRESS: 2181 WEST 1600 SOUTH, CEDAR CITY, UTAH 84720
AutoCAD SHX Text fax 435-586-8567
AutoCAD SHX Text
CIVIL ENGINEERS & SURVEYORS
AutoCAD SHX Text
PLATT, INC.
AutoCAD SHX Text
PLATT &
AutoCAD SHX Text phone 435-586-6151
AutoCAD SHX Text
195 N. 100 E., CEDAR CITY, UTAH 84720
AutoCAD SHX Text
ROBERT
AutoCAD SHX Text
B. PLATT
164659
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
WMH
20.00' P.U.E.
20.00'
WATERLINE
EASEMENT
P.O.B. PARCEL 1
348.22'
N57° 2 9' 0
7"E 128.76'
PARCEL 2
(VACATED EASEMENT)
S89° 51' 05"W 389.12' 40.90'
S ' 2
.8
N90° 00' 00"E 364.70'
S89° 29' 35"W 147.14'
S2 7°
5'
9"
W
.1
7'
SECTION LINE
BBE REBAR
AND CAP
20.00' WATER LINE
ACCESS AND
MAINTENANCE
EASEMENT
66.00'
ROADWAY
& UTILITY EASEMENT
21 22
28 27
BASIS OF BEARINGS
1/4 CORNER
SECTIONS 21 & 28
BBE MONUMENT
S89° 51' 05"W
BBE REBAR
AND CAP
N89° 51' 05"E 150.02'
SECTION CORNER
ICSM
PR
O
VI
DE
NC
E
CE
NT
ER
D
RI
VE
1600 SOUTH STREET
(DEDICATED
PUBLIC RIGHT-OF-W
AY)
FLOW
15.00' P.U.E.
15.00' P.U.E.
15.00' P.U.E.
SURFACE DITCH
S.I.T.L.A
PROVIDENCE QUANTUM
BUILDERS, L.C.
CEDAR CITY
CORPORATION
UTAH STATE
BUILDING
OWNERSHIP
AUTHORITY
CEDAR CITY
CORPORATION
EXIT 57 PROPERTIES,
LLC
CEDAR CITY
CORPORATION
20.00' P.U.E.
20.00' P.U.E.
SCM
FIRE HYDRANT
N ' 3
.6
N4 4°
1'
"E
.4 6'
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
06028.00
6029.00
.0
.0
.0
6033.00
6034.00
6035.00
6036.00
6037.00
6038.00
6039.00
6040.00
6041.00
6042.00
6043.00
6044.00
6045.00
.0
.0
.0
.0
.0
6051.00
.0
.0
6048.00
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
06062.00
.0
.0
OHP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
Feet
0 50 100
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
7/22/2022Revisions: Date:
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of 61
BID DOCUMENT SUBMITTAL
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
V-102
TOPOGRAPHIC / UTILITY SURVEY
W/O TREES
PR
OF
ES
SI
ONA
L LAND SURVEYOR
* HATU FO ETAT
S
MEPDMC
LEGEND
DENOTES 5/8" DIAMETER BY 20" REBAR WITH YELLOW
PLASTIC STAMPED PLATT & PLATT, INC. L.S. 164659
EXISTING CORNERS ARE AS NOTED HERON.
OVERHEAD POWER LINE
POWER POLE
AutoCAD SHX Text
USA VETERANS ADMINISTRATION 8.14 ACRES
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text LEGAL DESCRIPTION - PARCEL 1 BEGINNING AT A POINT S.89°51’05”W. 150.02 FEET ALONG THE SECTION 05”W. 150.02 FEET ALONG THE SECTION W. 150.02 FEET ALONG THE SECTION LINE FROM THE SOUTHEAST CORNER OF SECTION 21, TOWNSHIP 36 SOUTH, RANGE 11 WEST, SLB&M, THENCE S.89°51'05"W. 389.12 FEET ALONG SAID SECTION LINE, THENCE S.27°55'19"W. 485.17 FEET, THENCE S.89°29'35"W. 147.14 FEET, THENCE N.0°22'37"E. 483.68 FEET, THENCE N.44°41'33"E. 396.46 FEET, THENCE N.57°52'19"E. 130.34 FEET, THENCE N.90°00'00"E. 362.90 FEET. THENCE S.1°09'20"E. 403.91 FT. TO THE POINT OF BEGINNING. CONTAINING 8.14 ACRES OF LAND. PARCEL 2 - ACCESS RIGHT-OF-WAY TOGETHER WITH A 60.00 FOOT ROADWAY AND UTILITY EASEMENT, 30.00 FEET EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: BEGINNING AT A POINT LOCATED N.01°09'20"W. 516.97 FEET AND N.90°00'00"W. 515.84 FEET FROM THE SOUTHWEST CORNER OF SECTION 22, TOWNSHIP 36 SOUTH, RANGE 11 WEST, SLB&M, THENCE N.60°14'52"E. 132.55 FEET TO A CURVE TO THE RIGHT HAVING A RADIUS OF 297.00 FEET AND A CENTRAL ANGLE OF 30°26'55", THENCE NORTHEASTERLY ALONG SAID CURVE 157.83 FEET TO THE P.T., THENCE S.89°18'13"E. 284.56 FEET TO A CURVE TO THE RIGHT HAVING A RADIUS OF 300.00 FEET AND A CENTRAL ANGLE OF 27°54'31", THENCE SOUTHEASTERLY ALONG SAID CURVE 146.13 FEET TO THE P.T., THENCE S.61°23'42"E. 83.50 FEET TO THE POINT OF ENDING. SAID POINT ALSO BEING ON THE WEST RIGHT-OF-WAY LINE OF PROVIDENCE CENTER DRIVE. ALSO TOGETHER WITH AN ACCESS EASEMENT OVER AND ACROSS THE FOLLOWING DESCRIBED PROPERTY: BEGINNING AT A POINT LOCATED N.01°09'20"W. 516.97 FEET AND N.90°00'00"W. 515.84 FEET FROM THE SOUTHWEST CORNER OF SECTION 22, TOWNSHIP 36 SOUTH, RANGE 11 WEST, SLB&M, S.02°37'28"E., 113.54 FEET, THENCE S.57°53'18"W. 68.92 FEET, THENCE N.02°37'28"W. 150.44 FEET, THENCE N.60°14'52"E. 67.41 FEET, THENCE S.02°37'28"E. 33.71 FEET TO THE POINT OF BEGINNING. (VACATED BY PUBLIC ROAD DEDICATION) 1600 SOUTH STREET DESCRIPTION (PER ROAD DEDICATION PLAT) BEGINNING AT A POINT ON THE EAST SECTION LINE OF SECTION 21, TOWNSHIP 36 SOUTH, RANGE 11 WEST OF THE SALT LAKE BASE AND MERIDIAN, SAID POINT BEING N.01°09'20"W. ALONG SAID SECTION LINE AND 585.87 FEET FROM THE SOUTHEAST CORNER OF SAID SECTION 21 AND RUNNING THENCE N.89°18'13"W. 32.50 FEET TO THE POINT OF CURVATURE OF A 267.00 FOOT RADIUS CURVE TO THE LEFT; THENCE 113.36 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 24°19'34"; THENCE S.66°22'13"W. 395.14 FEET TO THE POINT OF CURVATURE OF A 580.00 FOOT RADIUS CURVE TO THE LEFT; THENCE 214.64 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 21°12'11"; THENCE S.45°10'02"W. 318.38 FEET; THENCE N.44°49'58"W. 66.00 FEET; THENCE N.45°10'02"E. 318.38 FEET TO THE POINT OF CURVATURE OF A 646.00 FOOT RADIUS CURVE TO THE RIGHT; THENCE 239.06 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 21°12'11"; THENCE N.66°22'13"E. 395.14 FEET TO THE POINT OF CURVATURE OF A 333.00 FOOT RADIUS CURVE TO THE RIGHT; THENCE 141.38 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 24°19'34"; THENCE S.89°18'13"E 58.67 FEET TO THE POINT OF CURVATURE OF A 333.00 FOOT RADIUS CURVE TO THE RIGHT; THENCE 154.07 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 26°30'35"; THENCE S.62°47'38"E. 70.49 FEET TO THE POINT OF CURVATURE OF A 30.00 FOOT RADIUS CURVE TO THE LEFT; THENCE 46.07 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 87°59'45" TO A POINT ON THE WESTERLY RIGHT-OF-WAY OF PROVIDENCE CENTER DRIVE (A 90.00 FOOT WIDE PUBLIC STREET); THENCE SOUTHWESTERLY ALONG SAID RIGHT-OF-WAY THE FOLLOWING TOW (2) COURSES; (1) S.29°12'23"W. 13.21 FEET TO THE POINT OF CURVATURE OF A 1084.93 FOOT RADIUS CURVE TO THE LEFT; THENCE (2) 109.82 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 5°47'59" TO THE POINT OF CUSP OF A 30.00 FOOT RADIUS CURVE THE CENTER OF WHICH BEARS N.66°35'50"W.; THENCE NORTHWESTERLY 45.13 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 86°11'49"; THENCE N.62°47'38"W. 71.80 FEET TO THE POINT OF CURVATURE OF A 267.00 FOOT RADIUS CURVE TO THE LEFT; THENCE 123.54 FEET ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 26°30'35"; THENCE N.89°18'13"W 26.17 FEET TO THE POINT OF BEGINNING. CONTAINS 90422.94 SQFT OR 2.076 ACRES. (ENTRY NO. 00726076, AT BOOK 1438, PAGE 1643, 18TH OF MARCH 2019, IRON COUNTY RECORDS) PROPERTY ADDRESS: 2181 WEST 1600 SOUTH, CEDAR CITY, UTAH 84720
AutoCAD SHX Text fax 435-586-8567
AutoCAD SHX Text
CIVIL ENGINEERS & SURVEYORS
AutoCAD SHX Text
PLATT, INC.
AutoCAD SHX Text
PLATT &
AutoCAD SHX Text phone 435-586-6151
AutoCAD SHX Text
195 N. 100 E., CEDAR CITY, UTAH 84720
AutoCAD SHX Text
ROBERT
AutoCAD SHX Text
B. PLATT
164659
R G
PLAQ
U
E
GRAVESITE
LOCATOR
KIOSK
BIVO
UAC O
F THE DEAD
PLAQ
UE
PATRIOTIC
SLOGAN
EH-1
G
ETTYSBU
R G
PLAQ
U
E
GRAVESITE
LOCATOR
KIOSK
BIVO
UAC O
F THE DEAD
PLAQ
UE
PATRIOTIC
SLOGAN
EH-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
D-101
CAP MJL
DEMOLITION PLAN
4-01
4-02
4-03
4-04
4-05
4-06
4-07
4-08
4-09
4-10
4-11
4-12
4-13
4-14
4-15
3-01
3-023-03
3-04 3-05
3-06 3-07
3-08
2-01
2-02
2-03
1-01
1-02
1-03
1-04
SECT. 4
SECT. 4
SECT. 3
SECT. 3
SECT. 2
SECT. 1
G
ETTYSBU
R G
PLAQ
U
E
GRAVESITE
LOCATOR
KIOSK
BIVO
UAC O
F THE DEAD
PLAQ
UE
PATRIOTICSLOGAN
SECT. 1
SECT. 2
EH-1
3-09
3-10
5-01
5-02
5-03
5-04
5-05
5-06
5-07
5-08
5-09
5-10
5-11
5-12
5-13
5-14
5-15
6-01
6-02
6-03
6-04
6-05
6-066-07
6-08
6-09
6-10
6-11
6-12
6-13
6-14
SECT. 5
SECT. 5SECT. 6
SECT. 6
GRAVESITE GRID MONUMENTS
MONUMENT
4-15
4-14
4-13
4-12
4-11
4-10
4-08
4-07
4-06
4-05
4-04
4-03
4-02
4-09
4-01
NORTHING
96,850.86
96,829.53
96,808.21
96,822.73
96,801.40
96,780.08
96,773.27
96,751.94
96,766.46
96,745.14
96,723.81
96,738.33
96,717.01
96,794.60
96,695.68
EASTING
106,989.52
106,968.42
106,947.32
107,017.96
106,996.86
106,975.76
107,025.29
107,004.20
107,074.83
107,053.73
107,032.63
107,103.26
107,082.17
107,046.39
107,061.07
GRAVESITE GRID MONUMENTS
MONUMENT
1-04
1-03
1-02
1-01
NORTHING
96,908.09
96,885.34
96,879.95
96,857.21
EASTING
107,046.14
107,023.63
107,074.57
107,052.07
GRAVESITE GRID MONUMENTS
MONUMENT
2-03
2-02
2-01
NORTHING
96,846.14
96,829.07
96,800.96
EASTING
107,097.38
107,080.50
107,108.95
GRAVESITE GRID MONUMENTS
MONUMENT
3-10
3-08
3-07
3-06
3-05
3-04
3-03
3-02
3-01
3-09
NORTHING
96,882.50
96,854.36
96,825.93
96,826.23
96,797.80
96,798.10
96,769.66
96,764.28
96,741.53
96,854.06
EASTING
107,020.82
107,049.25
107,021.12
107,077.69
107,049.56
107,106.13
107,077.99
107,128.94
107,106.43
106,992.69
GRAVESITE SECTION MARKERS
MONUMENT
SECT. 1
SECT. 1
SECT. 2
SECT. 2
SECT. 3
SECT. 3
SECT. 4
SECT. 4
SECT. 5
SECT. 5
SECT. 6
SECT. 6
NORTHING
96,878.46
96,919.06
96,870.34
96,815.63
96,770.72
96,732.57
96,722.56
96,676.35
96,629.43
96,669.95
96,623.74
96,669.81
EASTING
107,087.16
107,056.99
107,093.19
107,123.70
107,130.95
107,121.17
107,117.07
107,082.74
107,036.32
107,076.41
107,030.69
106,849.79
GRAVESITE GRID MONUMENTS
MONUMENT
5-15
5-14
5-13
5-12
5-11
5-10
5-08
5-07
5-06
5-05
5-04
5-03
5-02
5-01
5-09
NORTHING
96,803.94
96,782.62
96,761.29
96,775.81
96,754.48
96,733.16
96,726.35
96,705.02
96,719.55
96,698.22
96,676.89
96,691.41
96,670.09
96,648.76
96,747.68
EASTING
106,943.10
106,922.00
106,900.91
106,971.54
106,950.44
106,929.34
106,978.88
106,957.78
107,028.41
107,007.31
106,986.21
107,056.85
107,035.75
107,014.65
106,999.98
GRAVESITE GRID MONUMENTS
GRAVESITE GRID MONUMENTS
MONUMENT NORTHING EASTING
6-04 6-14
6-13
6-12
6-11
6-06
6-05
6-03
6-10
6-02
6-09
6-01
6-08
6-07
96,630.68 96,757.73
96,736.41
96,729.60
96,708.28
96,673.34
96,652.01
96,645.21
96,686.95
96,623.88
96,701.47
96,602.55
96,680.14
96,658.82
106,940.50 106,897.39
106,876.29
106,925.83
106,904.73
106,982.70
106,961.60
107,011.13
106,883.63
106,990.03
106,954.26
106,968.93
106,933.16
106,912.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
C-101
CAP MJL
SITE PLAN
R G
PLAQ
U
E
GRAVESITE
LOCATOR
KIOSK
BIVO
UAC O
F THE DEAD
PLAQ
UE
PATRIOTICSLOGAN
EH-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
C-102
GRADING & UTILITY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
Ds1 Ds1
Du Du
Sd1
TYPICAL LIMITS OF
DISTURBANCE SECTION
(N.T.S.)
Sd1 Sd1
Sd1
Sd1
Co
Ds1 Du
Ds1 Du
Co
Sd1
C-103
CAP MJL
INITIAL EROSION &
SEDIMENTATION CONTROL PLAN
R G
PLAQ
U
E
GRAVESITE
LOCATOR
KIOSK
BIVO
UAC O
F THE DEAD
PLAQ
UE
PATRIOTIC
SLOGAN
EH-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
Ds1 Ds1
Du Du
Sd1
Sd1 Sd1
Sd1
Sd1
Co
Ds2 Ds2
Ds3 Ds3
Sd2
Sd2Sd2
Sd2
Sd2
Sd2
Du
Ds2
Ds3Ds1
Du
Ds2
Ds3Ds1
Sd1
Sd2
Sd2
Co
Sd2
Sd1
C-104
CAP MJL
INTERMEDIATE EROSION &
SEDIMENTATION CONTROL PLAN
GETT
YSBURG
PLA
QUE
GRAVESITE
LOCATOR
KIOSK
BIVOUAC OF THE DEAD
PLAQUE
PA
TR
IO
TI
C
SL
O
G
AN
EH-1
Δ
Δ
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
C-201
CAP MJL
ROADWAY PLAN AND PROFILE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
C-202
CAP MJL
STORM DRAIN PROFILES
GETTYSBURG
PLAQUE
GRAVESITE
LOCATOR
KIOSK
BIVOUAC OF THE DEAD
PLAQUE
PA
TR
IO
TI
C
SL
O G
AN
C-203
CAP MJL
SANITARY SEWER PLAN
AND PROFILE
61Sheet of 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
SECT. 4
ETTYSBU
R G
PLAQ
U
E
GRAVESITE
LOCATOR
KIOSK
BIVO
UAC O
F THE DEAD
PLAQ
UE
PATRIOTIC
SLOGAN
5-01
5-02
5-03
5-04
6-01
6-02
6-03
6-04
6-05
6-06
6-07
6-08
6-10
SECT. 5
SECT. 5
SECT. 6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
C-401
CAP MJL
ENLARGED SITE PLAN
R G
PLAQ
U
E
GRAVESITE
LOCATOR
KIOSK
BIVO
UAC O
F THE DEAD
PLAQ
UE
PATRIOTIC
SLOGAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
C-402
CAP MJL
ENLARGED GRADING PLAN
4-03
4-04
4-05
4-06
4-07
4-08
4-09
4-10
4-11
4-12
4-13
4-14
4-15
3-01
3-02
3-03
3-043-05
3-063-07
3-08
2-01
2-02
2-03
1-01
1-02
1-03
1-04
SECT. 4
SECT. 4
SECT. 3
SECT. 3
SECT. 2
SECT. 1
SECT. 1
SECT. 2
3-09
3-10
5-03
5-04
5-05
5-06
5-07
5-08
5-09
5-11
5-12
5-15
6-09
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
C-403
CAP MJL
GRAVESITE NUMBERING PLAN -
SECTIONS 1, 2, 3 AND 4
4-04
4-05
4-06
4-07
4-08
4-09
4-10
4-11
4-12
4-13
3-03
3-05
SECT. 4
PATRIOTIC
SLOGAN
5-01
5-02
5-03
5-04
5-05
5-06
5-07
5-08
5-09
5-10
5-11
5-12
5-13
5-14
5-15
6-01
6-02
6-03
6-04
6-05
6-06
6-07
6-08
6-09
6-10
6-11
6-12
6-13
6-14
SECT. 5
SECT. 5
SECT. 6
SECT. 6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
N/A U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
18300 East 71st Ave., Denver, CO, 80249 504.684.4408; Sean Fitzpatrick
NATIONAL CEMETERY DEVELOPMENT
CEDAR CITY RURAL INITIATIVE
Cedar City, UT
942CM3001
N/A Project Director
Revisions: 4/28/2022
Steve Davis Department of Veterans Affairs, NCA
Phone: 202.632.4833 Email: steve.davis@va.gov Sheet of
Environment & Infrastructure Solutions, Inc.
VCI Project Management Construction Management Engineering
National Cemetery Administration
Design and Construction
Service
CD1 - REDESIGN 1/22/2021
ADDITION OF UNDERGROUND DETENTION FACILITY 12/15/2021
COMMITTAL SHELTER MODIFICATIONS 4/28/2022
BID DOCUMENTS
7/22/2022
BID DOCUMENT SUBMITTAL
C-404
CAP MJL
GRAVESITE NUMBERING PLAN -
SECTIONS 5 AND 6
80 1260
| 942-3001.G-001-G-001 |
| G-001 |
| 2022-07-25 CEDAR CITY VETERANS CEMETERY- Signed and Sealed Wood BID Drawings |
| G-101 FENCING AND CONSTRUCTION STAGING PLAN |
| VERTICAL PRIVACY SLATS WITH LOCKING BAR |
| D-101 DEMOLITION PLAN |
| C-101 SITE PLAN |
| C-102 GRADING & UTILITY PLAN |
| 942-3001.V-101 AND v-102-V-101 |
| V-101 |
| 942-3001.V-101 AND v-102-V-102 |
| V-102 |
File details come from the government source that posted it. Updated .