Attachment 3 - Performance Work Statement.docx

DOCX document 294 KB Posted

Attached to
Green Mountain National Forest - Rochester and Middlebury Ranger District Recreation Site Toilet Pumping
Solicitation number
12444326Q0016
Issued by

About this file

This is a Performance Work Statement for the Green Mountain National Forest's Rochester and Middlebury Ranger District outlining requirements for recreational site toilet pumping services. The contractor shall provide on-call toilet pumping services including equipment, labor, supervision, transportation, and operational supplies necessary to pump, wash down, cleanup, disinfect, and dispose of waste products from self-contained vault toilets. All work must be performed in compliance with state and federal regulations. Following waste removal, the contractor must add 100 gallons of water to each vault. Services must be scheduled between October 1st and November 15th annually, during business hours (Monday-Friday, 8:00 AM to 4:30 PM), excluding federal holidays and weekends. Not all vaults require pumping each year, and the government will furnish necessary access keys, assist with vault cover opening, and provide a map of toilet locations. Travel-related expenses are non-reimbursable.

The related solicitation (12444326Q0016) issued by the Department of Agriculture Forest Service R9-Eastern Region seeks contractor offers for this service on a base year with two option years. Questions must be submitted to Ashley.Stoltzfus@usda.gov no later than April 23, 2026 at 5:00 PM Eastern Standard Time, with a question and answer document to be posted on SAM.gov if applicable. All offers are due by May 4, 2026 at 5:00 PM Eastern Standard Time and should be emailed to the same point of contact. The performance requirement measure specifies that all requested vaults must be serviced, with inspection conducted by the Contracting Officer's Representative.

View the file

Other files

File Type Posted
SF 30.pdf PDF
Question and Answer Document.docx DOCX document
Attachment 7 - Experience Questionnaire.pdf PDF
12444326Q0016 RFQ.docx DOCX document
Attachment 6 - Wage Determination 2015-4139.pdf PDF
Attachment 1 - Schedule of Items.xlsx XLSX spreadsheet
Attachment 2 - Project Maps.pdf PDF
Attachment 4 - Statement of Objectives.docx DOCX document
Attachment 5 - Wage Determination 2015-6141.pdf PDF
SF 1449.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Performance Work Statement

Contents

Project Title3
General Information3
1.0 Background and Purpose3
2.0 Definitions3
Contractor Requirements3
3.0 Technical Requirements / Tasks3
4.0 Deliverable / Schedule3
5.0 Government Furnished7
6.0 Travel7
7.0 Contractor’s Key Personnel7
8.0 Security Requirements7
9.0 Data Rights7
10.0 Section 508 - Electronic and Information Technology Standards7
11.0 Performance Requirement Measures7
Attachment7

Project Title GMF- Rochester and Middlebury RD Recreation Site Toilet Pumping 2026

General Information

1.0 Background and Purpose

To provide quality recreation experiences for hikers, campers, picnickers, and other recreational users the recreation facilities must remain in a clean and sanitary condition. Many of the recreation sites have a self-contained toilet which has a vault for waste collection. Most vault toilets located at recreation sites on the Rochester and Middlebury Ranger District generally require annual waste removal. The contractor shall provide all equipment and labor necessary to remove waste from vault toilets and in accordance with contract specifications for the purpose of maintaining facilities.

Contractor shall furnish, on a “call when needed” basis, toilet pumping services which includes all equipment, supervision, transportation, labor, operational supplies, and incidentals necessary to pump, wash down, cleanup, disinfect and dispose of all waste products removed from the toilets and underground vault tanks. After pumping the waste from the self-contained tank, the contractor must add 100 gallons of water to each vault. It is possible not all vaults will require pumping each year.

2.0 Definitions

NA

Contractor Requirements

3.0 Technical Requirements / Tasks

Contractor shall furnish, on a “call when needed” basis, toilet pumping services which includes all equipment, supervision, transportation, labor, operational supplies, and incidentals necessary to pump, wash down, cleanup, disinfect and dispose of all waste products removed from the toilets and underground vault tanks, in accordance with the following contract specifications and in accordance with State and Federal regulations. Not all vaults will be pumped each year.

4.0 Deliverable / Schedule

Pump solid and liquid waste from toilet vaults. Add 100 gallons of water to the vault after removal of waste. Transfer waste to a disposal facility in accordance with State and Federal regulations.

Toilet pumping and addition of water to vaults to occur between October 1st and November 15th.

Toilet pumping and addition of water must occur Monday-Friday, between 8:00AM and 4:30PM, must not occur on federal holidays or weekends.

5.0 Government Furnished

The government will furnish keys for gates to allow entry to administrative roads and campgrounds that may not be open to the public. The government will issue keys to the toilet vault covers or meet contractor on site and assist with opening of the toilet vault cover. The government will furnish allen keys for the vault cover machine screws. The government will issue a map of the toilet locations.

6.0 Travel

Travel related expenses are not reimbursable.

7.0 Contractor’s Key Personnel

NA

8.0 Security Requirements

NA

9.0 Data Rights

NA

10.0 Section 508 - Electronic and Information Technology Standards

NA

11.0 Performance Requirement Measures

Performance Objective
Required Task or Deliverable
Performance Standard
Method of Surveillance
Pump refuse from self-contained toilet vaults
Remove solid and liquid waste from vault and add 100 gallons of water to vault
Service all requested vaults
Inspection by COR

Attachment

NA