Attachment 3 Parque Cr WY FS 504(1) Final Plans - Final Signed.pdf
PDF 13 MB Posted
- Attached to
- GAOA Parque Creek Road Repair
- Solicitation number
- 1240LT24R0058
About this file
This document appears to be the Final Signed Plans for the GAOA Parque Creek Road Repair project located in the Shoshone National Forest, Wind River Ranger District. The related federal contract opportunity is Solicitation Number 1240LT24R0058, which is a 100% Small Business set-aside for the road repair project. The solicitation description indicates this is part of the Great American Outdoors Act (GAOA) program. Questions are due by 23 August 2024, 12:00 PM MT. The federal agency involved is the Department of Agriculture Forest Service, Region 2 - Rocky Mountain Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shoulder up with aggregate base (Detail applies to left & right sides of roadway)
Roadway Aggregate, Method 2
Existing aggregate base depth Average 6"
Top of bank
Top of bank
Profile grade (top of roadway aggregate) Toe of slope
Geotextile Class 1, Type C, Nonwoven
1:
La y ba ck s lo pe fo r c on st ru ct io n of
Sp ec ia l R oc k Em ba nk m en t
1:10
Daylight slope to existing ground
Existing ground
Existing ground
Finished ground
6" Roadway Aggregate, Method 2
1:2
1:1 .5
Cut slo pe
See Note 1 Unclassified Borrow
Slope stake limit
Rounded cut slope See Note 8
Existing aggregate base depth Average 6"
Slide area Existing ground
EXISTING TYPICAL SECTION
Parque Creek Road At ℄ of Slide Area
Width varies due to slide Traveled Way width
100' Excavation/Embankment Transition
Proposed Special Rock Embankment - See Typical Section Profile grade
Existing ground
6"
Sta. 1+80 Sta. 2+80Sta. 0+30
Geotextile Class 1, Type C, Nonwoven
Roadway Aggregate, Method 2
Unclassified Borrow
See Note 9
See Note 9
4.
Existing ground
100' Excavation/Embankment Transition
Sta. -1+30 PROPOSED TYPICAL SECTION Sta 0+30 to 1+80
NOTE:
1. The gradient and width of roadway ditches and the excavation and embankment slope ratios may be adjusted by the CO to assure adequate drainage and stability.
2. Fill and compact the top 12"± of the trench with low-permeability material. Use on-site material if possible.
3. Special rock embankment, mechanically-placed, (6" to 1' dia. rock).
4. Special rock embankment, mechanically-placed, (2' to 3' dia.
rock).
5. Adjust overall height as approved by the CO.
6. Adjust trench width as approved by the CO. Add erosion control on uphill side of trench to prevent soil plugging drain.
7. Encapsulate special rock embankment, as well as beginning and end stations of trench, with Geotextile, Class 1, Type C, Nonwoven (1' min. overlap). Geotextile shall be subsidiary to Item 252.
8. Round all earth slopes and all rippable rock slopes.
9. Excavate down to bottom of Special Rock Embankment layer and stockpile the excavated material. Once the Special Rock Embankment is installed, embank with the stockpiled material to the bottom of proposed Roadway Aggregate layer.
Average 25 ft Overall Roadway
EXISTING TYPICAL SECTION
Parque Creek Road
North & South of Slide Area
11 - 12 ft Traveled Way width
25 ft Overall Roadway
12 ft Traveled Way width
4%
2%
1 ft ±
2 ft
4 ft
4 ft ±
9 ft ±
2.
3.
4.
5.
6.
7.
4% typ.
2 ft 4.
16 ft Roadbed width
Clearing Width
Clearing and seeding limits Clearing and seeding limits
NO SCALE
7.
LENGTH OF PROJECT
Station to Station Roadway
(ft)
0+30 to 1+80 150.0 TOTALS (ft) 150.0 TOTALS (mi) 0.028
TYPICAL SECTIONS
PARQUE CREEK ROAD
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
PROJECT SHEET
NUMBER
WY FS 504(1)
PARQUE CREEK ROAD A2
See Detail A
5'
5' 5' 5'
SUMMARY OF QUANTITIES
PROJECT SHEET
NUMBER
WY FS 504(1)
PARQUE CREEK ROAD B1
302.01
ROADWAY
AGGREGATE,
Compcaction
METHOD A
Remarks
TON
-1+30 - 2+80 191 See Typical Section. For roadway at slide repair.
Haul Route Repair locations to be determined by CO prior to placement.
Haul Route Repair locations to be determined by CO prior to placement.
Values used for estimating purposes:
Roadway Aggregate….............................143.0 lb./CUFT Watering for dust control and moisture content paid indirectly by item 302.01
SURFACING SUMMARY
HAUL ROUTE REPAIR (OPTION)
SUBTOTAL
Item Number
Station to Station
Forest Route 504
FOREST ROUTE 504 SUBTOTAL
HAUL ROUTE REPAIR
SUBTOTAL
PROJECT SUBTOTAL
BASE PROJECT SUBTOTAL
MISCELLANEOUS SUMMARIES
Sheet 1 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
PROJECT SHEET
NUMBER
B2WY FS 504(1)
PARQUE CREEK ROAD
252.01 & 252.02
SPECIAL ROCK
EMBANKMENT,
MECHANICALLY-PLACED
Remarks
CUYD
0+30 to 1+80 678 6" to 1' diameter
0+30 to 1+80 1017 2' to 3' diameter
Note: Use geotextile filter, class 1, type C, non-woven. See subsection 714.01(a).
TOTAL
Item Number
Station to Station
ROCK EMBANKMENT SUMMARY
Pay Item 204.01
For Info Only
BCY BCY CY BCY BCY CCY CCY CCY CCY CCY CCY CY
-1+30 - 2+80 4,973 0 4,973 0 0 0.90 4,476 2,944 0 0 2,944 1,532
4,973 0 4,973 0 0 4,476 2,944 0 0 2,944 1,532 1,755
NOTE:
1.
2.
3. The quantities shown herein are approximations.
4.
Embankment For info only
Station to Station Prismoidal
Volume Approach
Roads
For info only
Total Embankment
Excavation- Embankment
For info only
Shrink/Swell Factor
Total Excavation
Avaliable For Fills
Roadway Excavation Additional Excavation
For info only
ROADWAY
EXCAVATION
Available Material
Unavailable
Material Prismoidal
Volume Approach
Roads
Various
Additional Backfill Material Needed Onsite
WASTE
(see note 2)
TOTALS
Quantities based on prismoidal (surface to surface) volumes.
GRADING SUMMARY
Unclassified borrow quantity calculated using volumes adjusted for shrink/swell. An assumed value of 0.9 was used for calculations. The contractor is responsible for determining the shrink/swell on the borrow material.
BCY = Bank cubic yard - one cubic yard of material as it lies in the natural state.
CCY = Compacted cubic yard - one cubic yard of material after it has been compacted to specification density.
MISCELLANEOUS SUMMARIES
Sheet 2 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
PROJECT SHEET
NUMBER
WY FS 504(1)
PARQUE CREEK ROAD B3
251.01 602.01 602.1
P
LA
C E D
R
IP
R A P
M E T H
O D
A
C
LA
S S
-I
N C H
P
IP
E C
U
LV
E R T
E N
D S
E C T
IO
N F
O R
-I
N C H
P
IP
E C
U
LV
E R T
Remarks
CUYD LNFT EACH
LT/RT 40 Removal of exist. pipe paid in Removals Summary.
LT/RT 40 Removal of exist. pipe paid in Removals Summary.
LT 3.9 1 24" CMP end section w/ outfall riprap.
3.9 80 1
Note: Use geotextile filter, class 1, type C, non-woven for Placed Riprap. See subsection 714.01(a).
DRAINAGE SUMMARY
-1+80
Item Number
Station Side
TOTALS
1+55
1+55
203.01
REMOVAL OF PIPE
CULVERT
Remarks
LNFT
-1+80 40 Remove exist. 24" x 40' CMP (to be replaced).
1+55 40 Remove exist. 24" x 40' CMP (to be replaced).
80TOTAL
Item Number
Station
REMOVALS SUMMARY
201.01 625.01 625.02
Clearing & Grubbing
SEEDING, DRY
METHOD
MULCHING,
HYDRAULIC METHOD
Remarks
ACRE ACRE ACRE
0+30 to 1+80 0.3 0.3 0.3
0.1 0.1 0.1 Waste Area will be staked by CO prior to use
0.6 0.6 0.6 Waste Area will be staked by CO prior to use
1.0 1.0 1.0
Note: Waste Area 1 adjacent to slide area.
Waste Area 2 located at 43.707068, -109.646650 approx 1.15 miles from project.
TOTAL
Item Number
Station to Station
CLEARING, GRUBBING AND SEEDING SUMMARY
Waste Area 1
Waste Area 2
FOREST ROUTE 504
PARQUE CREEK ROAD
ROADWAY PLAN SHEET
C251-50
PLACED RIPRAP
AT CULVERT OUTLETS
(min.)
(min.)
DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
CFLHD DETAIL
DETAIL APPROVED FOR USE
REVISED: 08/2014 08/2020 09/2021
PROJECT SHEET
NUMBER
PARQUE CREEK ROAD G1
NO SCALE
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACINGDIAMETER
or SPAN
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation
Culvert end treatment
Piping plug
Finished subgrade or embankment height before trench excavation
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
See bedding depth table in trench excavation
HH
Remove unyielding material and replace with selected fine compressible material. Lightly compact in layers not over
Remove unstable material to firm bearing soil and replace with approved granular foundation fill material properly compacted
Bedding
Bedding
Bedding
Bedding
H42H42
H
Half diameter or whichever is less
Minimum spacing
(see table)
Diameter or Span
Diameter or Span
Metal end section
Metal end section
NOTE:
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth; or lean concrete
12" to 54"
> 54"
4"
6"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for UP to 48"
48" and UP
24" span or 36", METAL AND PLASTIC
PIPE CULVERT BEDDING
2'-0" ±
1'-0" ±
18" ±
18" ±
18"±
6" (min.)
6" (min.)
2"/foot of cover, 12" (min.), 24" (max.)
1'-0" minimum
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
DRAFT: 10/2017 602-3
FLH STANDARD
STANDARD
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
PROJECT SHEET
NUMBER
PARQUE CREEK ROAD T3
| A1 - Title Sheet |
| A2 - Typical Section |
| B1 |
| B2 - Misc Quantities 1 |
| B3 - Misc Quantities Cont |
| C1 |
| G1 - Place Riprap at Culvert Outlets Detail |
| T1 - Metal Pipe Culvert Detail |
| T2 - Metal Pipe Culvert Coupling Band Detail |
| T3 - Metal and Plastic Pipe Culvert Bedding Detail |
| T4 - Metal End Sections Detail |
| T5 - Construction Signs |
| 2024-03-18T12:36:54-0600 | |
| JUSTIN PICKAR |
| 2024-03-18T16:33:34-0600 | |
| ROBERT LAFRENTZ |
| 2024-03-19T06:20:49-0600 | |
| JEFFREY VON KIENAST |
File details come from the government source that posted it. Updated .