This document appears to be the Final Signed Plans for the GAOA Parque Creek Road Repair project located in the Shoshone National Forest, Wind River Ranger District. The related federal contract opportunity is Solicitation Number 1240LT24R0058, which is a 100% Small Business set-aside for the road repair project. The solicitation description indicates this is part of the Great American Outdoors Act (GAOA) program. Questions are due by 23 August 2024, 12:00 PM MT. The federal agency involved is the Department of Agriculture Forest Service, Region 2 - Rocky Mountain Region.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shoulder up with aggregate base (Detail applies to left & right sides of roadway)

Roadway Aggregate, Method 2

Existing aggregate base depth Average 6"

Top of bank

Top of bank

Profile grade (top of roadway aggregate) Toe of slope

Geotextile Class 1, Type C, Nonwoven

1:

La y ba ck s lo pe fo r c on st ru ct io n of

Sp ec ia l R oc k Em ba nk m en t

1:10

Daylight slope to existing ground

Existing ground

Existing ground

Finished ground

6" Roadway Aggregate, Method 2

1:2

1:1 .5

Cut slo pe

See Note 1 Unclassified Borrow

Slope stake limit

Rounded cut slope See Note 8

Existing aggregate base depth Average 6"

Slide area Existing ground

EXISTING TYPICAL SECTION

Parque Creek Road At ℄ of Slide Area

Width varies due to slide Traveled Way width

100' Excavation/Embankment Transition

Proposed Special Rock Embankment - See Typical Section Profile grade

Existing ground

6"

Sta. 1+80 Sta. 2+80Sta. 0+30

Geotextile Class 1, Type C, Nonwoven

Roadway Aggregate, Method 2

Unclassified Borrow

See Note 9

See Note 9

4.

Existing ground

100' Excavation/Embankment Transition

Sta. -1+30 PROPOSED TYPICAL SECTION Sta 0+30 to 1+80

NOTE:

1. The gradient and width of roadway ditches and the excavation and embankment slope ratios may be adjusted by the CO to assure adequate drainage and stability.

2. Fill and compact the top 12"± of the trench with low-permeability material. Use on-site material if possible.

3. Special rock embankment, mechanically-placed, (6" to 1' dia. rock).

4. Special rock embankment, mechanically-placed, (2' to 3' dia.

rock).

5. Adjust overall height as approved by the CO.

6. Adjust trench width as approved by the CO. Add erosion control on uphill side of trench to prevent soil plugging drain.

7. Encapsulate special rock embankment, as well as beginning and end stations of trench, with Geotextile, Class 1, Type C, Nonwoven (1' min. overlap). Geotextile shall be subsidiary to Item 252.

8. Round all earth slopes and all rippable rock slopes.

9. Excavate down to bottom of Special Rock Embankment layer and stockpile the excavated material. Once the Special Rock Embankment is installed, embank with the stockpiled material to the bottom of proposed Roadway Aggregate layer.

Average 25 ft Overall Roadway

EXISTING TYPICAL SECTION

Parque Creek Road

North & South of Slide Area

11 - 12 ft Traveled Way width

25 ft Overall Roadway

12 ft Traveled Way width

4%

2%

1 ft ±

2 ft

4 ft

4 ft ±

9 ft ±

2.

3.

4.

5.

6.

7.

4% typ.

2 ft 4.

16 ft Roadbed width

Clearing Width

Clearing and seeding limits Clearing and seeding limits

NO SCALE

7.

LENGTH OF PROJECT

Station to Station Roadway

(ft)

0+30 to 1+80 150.0 TOTALS (ft) 150.0 TOTALS (mi) 0.028

TYPICAL SECTIONS

PARQUE CREEK ROAD

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

OFFICE OF FEDERAL LANDS HIGHWAY

PROJECT SHEET

NUMBER

WY FS 504(1)

PARQUE CREEK ROAD A2

See Detail A

5'

5' 5' 5'

SUMMARY OF QUANTITIES

PROJECT SHEET

NUMBER

WY FS 504(1)

PARQUE CREEK ROAD B1

302.01

ROADWAY

AGGREGATE,

Compcaction

METHOD A

Remarks

TON

-1+30 - 2+80 191 See Typical Section. For roadway at slide repair.

Haul Route Repair locations to be determined by CO prior to placement.

Haul Route Repair locations to be determined by CO prior to placement.

Values used for estimating purposes:

Roadway Aggregate….............................143.0 lb./CUFT Watering for dust control and moisture content paid indirectly by item 302.01

SURFACING SUMMARY

HAUL ROUTE REPAIR (OPTION)

SUBTOTAL

Item Number

Station to Station

Forest Route 504

FOREST ROUTE 504 SUBTOTAL

HAUL ROUTE REPAIR

SUBTOTAL

PROJECT SUBTOTAL

BASE PROJECT SUBTOTAL

MISCELLANEOUS SUMMARIES

Sheet 1 of 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

OFFICE OF FEDERAL LANDS HIGHWAY

PROJECT SHEET

NUMBER

B2WY FS 504(1)

PARQUE CREEK ROAD

252.01 & 252.02

SPECIAL ROCK

EMBANKMENT,

MECHANICALLY-PLACED

Remarks

CUYD

0+30 to 1+80 678 6" to 1' diameter

0+30 to 1+80 1017 2' to 3' diameter

Note: Use geotextile filter, class 1, type C, non-woven. See subsection 714.01(a).

TOTAL

Item Number

Station to Station

ROCK EMBANKMENT SUMMARY

Pay Item 204.01

For Info Only

BCY BCY CY BCY BCY CCY CCY CCY CCY CCY CCY CY

-1+30 - 2+80 4,973 0 4,973 0 0 0.90 4,476 2,944 0 0 2,944 1,532

4,973 0 4,973 0 0 4,476 2,944 0 0 2,944 1,532 1,755

NOTE:

1.

2.

3. The quantities shown herein are approximations.

4.

Embankment For info only

Station to Station Prismoidal

Volume Approach

Roads

For info only

Total Embankment

Excavation- Embankment

For info only

Shrink/Swell Factor

Total Excavation

Avaliable For Fills

Roadway Excavation Additional Excavation

For info only

ROADWAY

EXCAVATION

Available Material

Unavailable

Material Prismoidal

Volume Approach

Roads

Various

Additional Backfill Material Needed Onsite

WASTE

(see note 2)

TOTALS

Quantities based on prismoidal (surface to surface) volumes.

GRADING SUMMARY

Unclassified borrow quantity calculated using volumes adjusted for shrink/swell. An assumed value of 0.9 was used for calculations. The contractor is responsible for determining the shrink/swell on the borrow material.

BCY = Bank cubic yard - one cubic yard of material as it lies in the natural state.

CCY = Compacted cubic yard - one cubic yard of material after it has been compacted to specification density.

MISCELLANEOUS SUMMARIES

Sheet 2 of 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

OFFICE OF FEDERAL LANDS HIGHWAY

PROJECT SHEET

NUMBER

WY FS 504(1)

PARQUE CREEK ROAD B3

251.01 602.01 602.1

P

LA

C E D

R

IP

R A P

M E T H

O D

A

C

LA

S S

-I

N C H

P

IP

E C

U

LV

E R T

E N

D S

E C T

IO

N F

O R

-I

N C H

P

IP

E C

U

LV

E R T

Remarks

CUYD LNFT EACH

LT/RT 40 Removal of exist. pipe paid in Removals Summary.

LT/RT 40 Removal of exist. pipe paid in Removals Summary.

LT 3.9 1 24" CMP end section w/ outfall riprap.

3.9 80 1

Note: Use geotextile filter, class 1, type C, non-woven for Placed Riprap. See subsection 714.01(a).

DRAINAGE SUMMARY

-1+80

Item Number

Station Side

TOTALS

1+55

1+55

203.01

REMOVAL OF PIPE

CULVERT

Remarks

LNFT

-1+80 40 Remove exist. 24" x 40' CMP (to be replaced).

1+55 40 Remove exist. 24" x 40' CMP (to be replaced).

80TOTAL

Item Number

Station

REMOVALS SUMMARY

201.01 625.01 625.02

Clearing & Grubbing

SEEDING, DRY

METHOD

MULCHING,

HYDRAULIC METHOD

Remarks

ACRE ACRE ACRE

0+30 to 1+80 0.3 0.3 0.3

0.1 0.1 0.1 Waste Area will be staked by CO prior to use

0.6 0.6 0.6 Waste Area will be staked by CO prior to use

1.0 1.0 1.0

Note: Waste Area 1 adjacent to slide area.

Waste Area 2 located at 43.707068, -109.646650 approx 1.15 miles from project.

TOTAL

Item Number

Station to Station

CLEARING, GRUBBING AND SEEDING SUMMARY

Waste Area 1

Waste Area 2

FOREST ROUTE 504

PARQUE CREEK ROAD

ROADWAY PLAN SHEET

C251-50

PLACED RIPRAP

AT CULVERT OUTLETS

(min.)

(min.)

DETAIL

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

CFLHD DETAIL

DETAIL APPROVED FOR USE

REVISED: 08/2014 08/2020 09/2021

PROJECT SHEET

NUMBER

PARQUE CREEK ROAD G1

NO SCALE

When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.

H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.

See Section 704 for bedding and backfill requirements.

1.

2.

3.

Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.

MULTIPLE PIPE INSTALLATION

PIPING PLUG

BELOW NATURAL GROUND OR

TRENCH EXCAVATION IN EMBANKMENT

ON UNSTABLE MATERIAL

ABOVE AND BELOW

NATURAL GROUND

ON NATURAL GROUND

ABOVE NATURAL GROUND

ON UNYIELDING MATERIAL

PIPE BEDDING

ELEVATION

SECTION A-A

LEGEND:

Bedding material (uncompacted)

Impermeable backfill material.

BEDDING DEPTH

MINIMUM SPACING

SPACINGDIAMETER

or SPAN

PIPE SIZE (H) DEPTH

Roadway embankment Roadway embankment

Natural ground

Toe plate Toe plate

Natural ground Natural ground

Roadway embankment

Roadway excavation

Natural ground

H

Width

H H

H H

H H

H H

H

H

H

H

H

H

H

H

Finished subgrade Finished subgrade

Natural ground

Finished subgrade

Pipe culvert

Embankment slope

High water elevation

Culvert end treatment

Piping plug

Finished subgrade or embankment height before trench excavation

Original natural ground surface

A

A

Finished subgrade

Roadway embankment

Roadway embankment

Finished subgrade trench excavations

Embankment material placed in layers

Compacted backfill material placed in layers not backfill in accordance with Section 614.

See bedding depth table in trench excavation

HH

Remove unyielding material and replace with selected fine compressible material. Lightly compact in layers not over

Remove unstable material to firm bearing soil and replace with approved granular foundation fill material properly compacted

Bedding

Bedding

Bedding

Bedding

H42H42

H

Half diameter or whichever is less

Minimum spacing

(see table)

Diameter or Span

Diameter or Span

Metal end section

Metal end section

NOTE:

or 36" (max.) for embankment installations not exceeding 6" compacted depth.

exceeding 6" compacted depth; or lean concrete

12" to 54"

> 54"

4"

6"

18" (min.)

6" in uncompacted depth.

* Reduce to 18" for UP to 48"

48" and UP

24" span or 36", METAL AND PLASTIC

PIPE CULVERT BEDDING

2'-0" ±

1'-0" ±

18" ±

18" ±

18"±

6" (min.)

6" (min.)

2"/foot of cover, 12" (min.), 24" (max.)

1'-0" minimum

2H or 12' (max.)

2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)

2H or 12' (max.)2H or 12' (max.)

2H or 12' (max.) 2H or 12' (max.)

STANDARD APPROVED FOR USE 12/1993

REVISED: 4/1994 6/2005

DRAFT: 10/2017 602-3

FLH STANDARD

STANDARD

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

OFFICE OF FEDERAL LANDS HIGHWAY

PROJECT SHEET

NUMBER

PARQUE CREEK ROAD T3

A1 - Title Sheet
A2 - Typical Section
B1
B2 - Misc Quantities 1
B3 - Misc Quantities Cont
C1
G1 - Place Riprap at Culvert Outlets Detail
T1 - Metal Pipe Culvert Detail
T2 - Metal Pipe Culvert Coupling Band Detail
T3 - Metal and Plastic Pipe Culvert Bedding Detail
T4 - Metal End Sections Detail
T5 - Construction Signs
2024-03-18T12:36:54-0600
JUSTIN PICKAR
2024-03-18T16:33:34-0600
ROBERT LAFRENTZ
2024-03-19T06:20:49-0600
JEFFREY VON KIENAST

File details come from the government source that posted it. Updated .