This document is an Attachment 1 Schedule of Items for the GAOA Parque Creek Road Repair contract opportunity. The contract is being solicited by the Department of Agriculture Forest Service R2-Rocky Mountain Region. The project is located in the Shoshone National Forest, Wind River Ranger District and is set-aside for 100% Small Business Concerns.

The Schedule of Items lists the base items and an optional item for the road repair work. The base items include mobilization, soil erosion control, clearing and grubbing, pipe culvert removal, roadway excavation, various rock embankment work, roadway aggregate, roadway reconditioning, pipe installation, and equipment hours. The optional item is for additional roadway aggregate for haul route repair. Pricing is provided per unit for each line item, with estimated quantities listed. The contract has a solicitation number of 1240LT24R0058 and questions are due by August 23, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Line Item No.Pay Item NumberPay Item DescriptionUnitB2 Miscellaneous SummariesB3 Miscellaneous SummariesEstimated QuantitiesUnit CostLine Item totalRemarks and/or Determination of Estimated Quantity
Base Items
0001151.01MobilizationLSALL
0002157.01Soil Erosion ControlLSALLAspen, Coconut Fiber or approved alternative material required.
0003201.01Clearing & GrubbingAcre1.01.0Disposal method (f) - Scatter for construction slash
0004203.01Removal of Pipe Culvert, Disposal Method (a)LF8080Disposal method (a) - remove from project
0005204.01Roadway ExcavationCY*4,9734,973
0006251.01Placed Riprap, Method A, Class 2CY*3.93.9
0007252.01Special Rock Embankment, Mechanically-Placed (6" TO 1' DIA.)CY*678678Reference 705.02 for definition of angular rock
0008252.02Special Rock Embankment, Mechanically-Placed (2' TO 3' DIA.)CY*1,0171,017Reference 705.02 for definition of angular rock
0009302.01Roadway Aggregate, Grading U, Compcaction Method A (For Roadway at Slide Repair and Haul Route Repairs)Ton689689Haul Route Repair locations to be determined by CO prior to placement.
0010303.01Roadway Reconditioning, Compaction Method BMile4.24.2FSR 504, From Intersection with FSR 285 to Slide Location - 1 cattle guard cleaning anticipated, (see pay item 808.01)
0011303.02Roadway Reconditioning, Compaction Method AMile3.03.0FSR 285, End County Section to Intersection with FSR 504
0012602.01Installation of 24-inch diameter 16 gauge corrugated metal pipe, Compaction Method 6LF8080
0013602.02Furnish and Install end section for 24” pipe culvertEach11
0014622.01Dump Truck, 10 C.Y. with operatorHour20
0015622.02Track Mounted Excavator, Cat 320, Case CX210D, Deere 210G, or equiv., w/ thumb attachment; with operatorHour20
0016622.03Crawler Dozer, Cat D-6K2, Case 1150M, Deere 700K, or equivalent, w/ tilt blade; with operatorHour20
0017622.04Motor Grader, Cat 140, JD770D, or equivalent; with operatorHour20
B 18623.01General LaborHour40Discuss w/ Cody - drop item and include as qty in Equipment hours?
B 19623.02Special Labor, Hired Survey ServicesHour20Discuss w/ Cody - drop item and include as qty in Equipment hours?
0018625.01Seeding, Dry MethodAcre0.30.3
0019625.02Mulching, Hydraulic MethodAcre0.30.3
0020808.01Cattle Guard CleaningEach11Location to be staked by CO prior to cleaning
B 23ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!For dust control and moisture content - indirect payment in 302.01202 gal/CY material placed
Total Base Items
Option Item 1
2001302.01(Option)Roadway Aggregate, Grading U, Compaction Method A (Option Item for additional Haul Route Repair)Ton20762,076Haul Route Repair locations to be determined by CO prior to placement.
Total Option Item 1

Total Base + Option Item 1

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
*The quantity is measured as a Contract Quantity in accordance with FP-14 subsection 109.02.