This is a specification document for National Forest System Road construction projects adopted by the Forest Service, U.S. Department of Agriculture (USDA). The document modifies the standard FP-14 specifications with Forest Service-specific requirements and deletions.
Key construction and material requirements include: all in-stream work must be performed between June 15th and September 15th; traffic control plans must be submitted at least 30 days prior to work initiation with maximum 120-minute delays followed by 15-minute open periods; survey and staking tolerances are defined in Table 152-1 with horizontal and vertical accuracy requirements ranging from ±0.03 to ±2.00 feet depending on the staking phase and road classification; aggregate compaction must achieve 95 percent maximum density using specified methods; asphalt tack coat application requires ambient air temperatures above 40°F and rising; and turf establishment using WisDOT Seed Mix #40 must be applied within 10 days of ground disturbance at 1,000 pounds per acre of mulch applied within 48 hours of seeding. The document eliminates sections covering bid procedures, prosecution and progress schedules, and certain payment measurement procedures. Contractor quality control requires a quality control manager with two years of experience and testers with appropriate certifications (NICET Level II or equivalent). Contract quantity adjustments occur only when design errors exceed 15 percent. The specifications reference MUTCD standards for traffic control, AASHTO standards for testing, and various material specifications for aggregates, asphalt, seed, and other construction materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
Preface 4
101 – Terms, Format, and Definitions 5
101.01 Meaning of Terms 5
101.03 Abbreviations 5
101.04 Definitions 6
102 – Bid, Award, and Execution of Contract 9
Delete Section 102 9
103 – Scope of Work 10
Delete Subsections 103.02, 103.03, 103.04, 103.05 10
104 – Control of Work 11
Delete Subsections 104.01, 104.02, 104.04 11
104.06 Use of Roads by Contractor 11
105 – Control of Material 12
105.02(a) Government-Provided Sources 12
106 – Acceptance of Work 13
106.01 Conformity with Contract Requirements 13
106.02 Visual Inspection 15
107 – Legal Relations and Responsibility to the Public 16
107.02 Protection and Restoration of Property and Landscape 16
107.05 Responsibility for Damage Claims 16
108 – Prosecution and Progress 17
Delete Section 108 17
109 – Measurement and Payment 18
Delete Subsections 109.06, 109.07, 109.08, 109.09 18
152 – Construction Survey and Staking 19
152.04 General 19
152.05 Survey and Staking Requirements 19
Table 152-1 Construction Survey and Staking Tolerances 21
153 – Contractor Quality Control 23
153.02 Qualifications 23
153.03 Quality Control Plan 23
153.07 Records and Control Charts 23
155 – Schedules for Construction Contracts 24
Delete Section 155 24
156 – Public Traffic 25
Section 156 – Public Traffic 25
157 – Soil Erosion and Sediment Control 27
157.04 General 27
207 – Earthwork Geotextiles 28
301 – Untreated Aggregate Courses 29
301.05 Compacting 29
303.07 Roadway Reconditioning 29
412 – Asphalt Tack Coat 30
412.05 Weather Limitations 30
625 – Turf Establishment 31
Preface Preface_wo_07_11_2017
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest
System Roads.
101 – Terms, Format, and Definitions
101.01_National_11_9_2016
Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_National_11_9_2016
Add the following to Subsection 101.03:
101.03 Abbreviations.
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations
AFPA — American Forest and Paper Association
FSAR — Forest Service Acquisition Regulations
MSHA — Mine Safety and Health Administration
NESC — National Electrical Safety Code
WCLIB — West Coast Lumber Inspection Bureau
(f) Miscellaneous unit abbreviations.
MP — milepost location ppm — parts per million volume
STA station location
101.04_National_11_9_2016
Make the following changes to Subsection 101.04:
101.04 Definitions.
Delete these definitions and replace the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line
(including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2)
Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S. Department of
Agriculture.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road
Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.
Utilization Standards — The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 – Bid, Award, and Execution of Contract 102.00_National_11_9_2016
Delete Section 102 in its entirety.
Delete Section 102.
103 - Scope of Work 103.00_National_11_9_2016
Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Delete Subsections 103.02, 103.03, 103.04, 103.05.
104 - Control of Work 104.00_National_11_9_2016
Delete Subsections 104.01, 104.02, and 104.04.
Delete Subsections 104.01, 104.02, 104.04.
104.06_National_11_9_2016
Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road
Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material 105.02_National_11_1_2016
Add the following to Subsection 105.02(a):
105.02(a) Government-provided sources.
Government-provided sources for this project are identified as follows:
No government-provided sources for this project.
(1) Government-provided mandatory sources.
Pay Item Description Material source number or name
(2) Government-provided optional sources for this project are identified as follows:
Pay Item Description Material source number or name
If the Contractor elects to obtain material from their own located sources they shall follow all provisions as outlined in Subsection 105.02(c).
106 - Acceptance of Work 106.01_National_11_9_2016
Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project.
When the Government tests work, copies of test reports are furnished to the Contractor upon request.
Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive.
The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;
providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
1. Sampling method;
2. Number of samples;
3. Sample transport;
4. Test procedures;
5. Testing laboratories;
6. Reporting;
7. Estimated time and costs; and
8. Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the
Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
1. Have the work accepted at a reduced price; or
2. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.02_National_11_9_2016
Delete Subsection 106.02 and replace with the following:
106.02 Visual Inspection.
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
107 - Legal Relations and Responsibility to the Public 107.02_National_11_1_2016
Add the following to Subsection 107.02:
107.02 Protection and Restoration of Property and Landscape.
The contractor shall perform all in-stream work between June 15th and September 15th.
107.05_National_11_9_2016
Delete Subsection 107.05.
107.05 Responsibility for Damage Claims.
108 - Prosecution and Progress 108.00_National_11_9_2016
Delete Section 108 in its entirety.
Delete Section 108.
109 - Measurement and Payment 109.00_National_11_9_2016
Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.02_National_11_9_2016
Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
152 - Construction Survey and Staking 152.00_National_12_12_2016
Add the following to Subsection 152.04(c):
152.04 General.
(c) Material.
Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.
Do not use aerosol spray paints.
Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.
Make the following changes to Subsection 152.05:
152.05 Survey and Staking Requirements.
Delete Subsection 152.05(d)(2) and replace with the following:
(d) Slope and reference stakes.
(2) Conventional survey methods. When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.
Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.
Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.
Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.
Use the designated method to establish the slope stake catchpoint.
Method I—Computed Method. Use the template information shown in the plans or other
Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking.
Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.
Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other
Government-provided data.
Replace Table 152-1 with the following:
Table 152-1 Construction Survey and Staking Tolerances
Table 152-1
Construction Survey and Staking Tolerances (1)
Staking Phase Horizontal Vertical
Control points set from existing
Government control points- Tolerance Class
A
±0.03 feet
(±10 millimeters) ±0.01 feet × N
(±3 millimeters × N )(2)
Mapping, topography, and cross-section
Points- Tolerance Class A
±0.16 feet
(±50 millimeters)
±0.16 feet
(±50 millimeters)
Centerline points (3) including (PC), (PT), (POT),(POC), and references- Tolerance Class
A
±0.06 feet
(±20 millimeters)
±0.06 feet
(±20 millimeters)
Slope-stake and slope-stake references-
Tolerance Class A (4)
±0.16 feet
(±50 millimeters)
±0.16 feet
±50 millimeters)
Culverts, ditches, and minor drainage structures stakes- Tolerance Class A
±0.16 feet
(±50 millimeters)
±0.06 feet
(±20 millimeters)
Retaining walls stakes ±0.06 feet
(±20 millimeters)
±0.03 feet
(±10 millimeters)
Curb and gutter stakes ±0.06 feet
(±20 millimeters)
±0.03 feet
(±10 millimeters)
Bridge substructures stakes ±0.03 feet
(±10 millimeters)(5)
±0.03 feet
(±10 millimeters)
Bridge superstructures stakes ±0.03 feet
(±10 millimeters)(5)
±0.03 feet
(±10 millimeters)
Clearing and grubbing limit stakes- Tolerance
Class A
±1.00 feet
(±300 millimeters)
Roadway subgrade finish stakes- Tolerance
Class A (6)
±0.16 feet
(±50 millimeters)
±0.03 feet
(±10 millimeters)
Roadway finish grade stakes (6) ±0.16 feet
(±50 millimeters)
±0.03 feet
(±10 millimeters)
Table 152-1
Construction Survey and Staking Tolerances (continued) (1)
Staking Phase Horizontal Vertical
Control points set from existing Government control points –Tolerance Class B (7)
±0.16 feet
(±20 millimeters) ±0.16 feet ×
(±20 millimeters × )(2)
Mapping, topography, and cross-section points–Tolerance Class B (7)
±1.00 feet
(±300 millimeters)
±0.50 feet
(±150 millimeters)
Centerline points including (PC), (PT), (POT),(POC), and references–Tolerance Class
B (7)
±0.16 feet
(±20 millimeters)
±0.16 feet
(±20 millimeters)
Slope-stake and slope-stake references–
Tolerance Class B (7)
±0.50 feet
(±50 millimeters)
±0.16 feet
±50 millimeters)
Culverts, ditches, and minor drainage structures stakes–Tolerance Class B (7)
±0.50 feet
(±150 millimeters)
±0.16 feet
(±20 millimeters)
Clearing and grubbing limit stakes–Tolerance
Class B (7)
±2.00 feet
(±600 millimeters)
Roadway subgrade finish stakes–Tolerance
Class B (7)
±0.50 feet
(±50 millimeters)
±0.16 feet
(±10 millimeters)
Roadway finish grade stakes–Tolerance Class
B (7)
±0.50 feet
(±50 millimeters)
±0.16 feet
(±10 millimeters)
(1) At statistical 95 percent confidence level. Tolerances are relative to existing Government control points.
(2) N is the number of instrument setups.
(3) Centerline points: PC - point of curve, PT - point of tangent, POT - point on tangent, POC - point on curve.
(4) Take the cross-sections normal to the centerline ±1 degree.
(5) Bridge control is established as a local network and the tolerances are relative to that network.
(6) Includes paved ditches.
(7) Tolerance Class B for Very Low Volume Roads with an aggregate or native finished surface.
N
N
153 - Contractor Quality Control 153.02_National_11_1_2016
Delete Subsection 153.02 and replace with the following:
153.02 Qualifications.
Submit the following for approval with the quality control plan:
(a) Quality control manager (QCM). Furnish a QCM who has at least 2 years’ experience in construction, inspector, quality control and material testing on construction projects of similar type and scope.
(b) Testers. Provide testers with at least one year experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:
(1) NICET Level II certification in highway material or equivalent state or industry certification;
(2) Certification by a regional certification program (such as Western Alliance for Quality
Transportation Construction (WAQTC), Northeast Transportation Technician Certification Program
(NETTCP), Southeast Task Force for Technician Training and Qualification (STFTTQ), or Multi
Regional Training and Certification (M-TRAC)); or
(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.
153.03_National_11_1_2016
Add the following paragraph to the end of Subsection 153.03(b):
153.03 Quality Control Plan.
(b) Quality Control Procedures.
Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.
153.07_National_11_1_2016
Delete Subsection 153.07 and replace with the following:
153.07 Records and control charts.
Maintain complete testing and inspection records by pay item number and make them accessible to the
CO.
155 - Schedules for Construction Contracts 155.00_National_11_9_2016
Delete Section 155 in its entirety.
Delete Section 155.
156 - Public Traffic 156.00_National_11_4_2016
Delete Section 156 in its entirety and replace with the following:
Section 156. – PUBLIC TRAFIC
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Permanent Traffic Control 633
Traffic Signing and Marking Material 718
Concrete Barriers and Precast Guardwalls 618
Temporary plastic fence 710.11
Construction Requirements
156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed 120 minutes at any one time followed by an open period of no less than 15 minutes. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection
106.07(b).
Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.
Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM
7100-15. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the
National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Parking lot segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing any portion of the parking lot during construction, give written notice to the Contracting
Officer at least 10 days in advance.
Table 156-1 Parking Lot Closures
Road Number
From
Terminus To Terminus
Maximum
Consecutive Days of
Closure
Minimum
Consecutive Days
Open
Parking Lot –
North Entrance STH 13 Back Parking Lot 2 2
Parking Lot –
South Entrance STH 13 Back Parking Lot 2 2
Front Parking
Lot
North
Entrance South Entrance 3 2
Back Parking Lot
North
Entrance South Entrance 5 2
Upper Lot
Back
Parking Lot
Hazardous
Materials
Building 3 3
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See
Subsection 109.05.
157 - Soil Erosion and Sediment Control 157.04_National_11_1_2016
Delete Subsection 157.04 and replace with the following:
157.04 General.
Thirty (30) days prior to the start of construction, submit a written plan according to subsection 104.03 with all necessary permits that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control without approval.
When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.
207 - Earthwork Geotextiles 207.04_National_11_8_2016
Delete third sentence of Subsection 207.04 and replace with the following:
207.04(c)(1) First layer placement and compaction.
Spread the end-dump pile of cover material maintaining 6 inch(es) lift over the geosynthetic.
301 - Untreated Aggregate Courses 301.03_National_7_7_2017
Add the following to Subsection 301.03:
301.03 General.
Request surface preparation approval in writing from the CO before placing aggregate.
301.05_National_11_8_2016
Delete Subsection 301.05 and replace with the following:
301.05 Compacting.
301.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
(a) Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
(b) Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
(c) Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).
(d) Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
(e) Compaction E. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301.07_National_11_2_2016
Add the following to Subsection 303.07:
303.07 Roadway Reconditioning.
Remove cattleguard decks. Clean the deck and the area beneath the cattleguard of soil and other material to the bottom of the original foundation over the entire width of the installation. Dispose of waste at designated sites or according to Subsection 204.14. Reinstall the cattleguard deck.
412 - Asphalt Tack Coat 412.05_National_11_4_2016
Delete Subsection 412.05(b) and replace with the following:
412.05 Weather Limitations.
(b) Ambient air temperature is above 40 °F (5 °C) and rising.
625 - Turf Establishment 625.00_National_11_4_2016
Delete Section 625 in its entirety and replace with the following:
Section 625. — TURF ESTABLISHMENT
Description
625.01 This work consists of soil preparation, seeding, and mulching. Seeding and mulching methods are designated as dry or hydraulic.
Material
625.02 Conform to the following Subsections:
Agricultural limestone 713.02
Fertilizer 713.03 Mulch 713.05
Seed 713.04 Tackifiers 713.11
Water 725.01(b)
Construction Requirements
625.03 General. Apply turf establishment to the areas shown on the plans or worklists within 10 days after completion of ground disturbing activities.
Seeded areas damaged by construction activities shall be reseeded within 10 days of the damage. Do not seed during windy weather or when the ground is excessively wet, frozen, or snow covered.
Assure that all seed and mulch used in the work conforms to the weed free requirements of Section 713.
625.04 Preparing Seedbed. Ensure that the surface soil is in a roughened condition favorable for germination and growth.
625.05 Watering. Watering shall not be required for this contract.
625.06 Fertilizing. Fertilizer shall not be required for this contract.
625.07 Seeding. Apply seed by the following methods:
(a) Dry Method. Apply the seed with approved power driven seeders, drills, or other mechanical equipment. Hand-operated seeding methods are satisfactory on areas inaccessible to mechanical equipment; or
(b) Hydraulic Method. Use hydraulic-type equipment capable of providing a uniform application using water as the carrying agent. Add a tracer material consisting of either wood or grass cellulose fiber mulch to the water. Apply the tracer material at a rate of 400 pounds per acre (450 kilograms per hectare) to provide visible evidence of uniform application. Add the seed to the water slurry no more than 30 minutes before application. Seed by hand areas inaccessible to seeding equipment.
Furnish and apply the following kinds and amounts of pure live seed (WisDOT Seed Mix #40):
Type of Seed Mixture Proportions (%)
1. Kentucky Bluegrass 35
2. Red Fescue 20
3. Hard Fescue 20
4.
Improved Fine Perennial Ryegrass
Total 100
Determine the pounds of seed to be furnished per acre by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.
625.08 Mulching. Apply Mulch within 48 hours after seeding by the following methods.
(a) Dry Method. Apply mulch with a hand spreader or a spreader utilizing forced air at a rate of
1,000 pounds per acre. Anchor the mulch with an approved stabilizing emulsion tackifier at a rate of
5 - 10 gallons per acre. Do not mark or deface structure, pavements, utilities, or plant growth with tackifier.
(b) Hydraulic Method. Apply mulch in a separate application from the seed using hydraulic-type equipment according to Subsection 625.07(b).
Apply wood fiber or grass straw cellulose fiber mulch at a rate of 1,000 pounds per acre.
Apply bonded fiber matrix hydraulic mulch at a minimum rate of 1,000 pounds per acre.
Apply so no hole in the matrix is greater than 0.04 inches. Apply so that no gaps exist between the matrix and the soil.
Apply mulch uniformly over the entire disturbed area. Mulch by hand areas inaccessible to mulching equipment.
625.09 Protecting and Caring for Seeded Areas. Protect and care for seeded areas. Repair or apply supplemental applications of seed, and mulch as many times as needed until turf is established or final acceptance.
625.10 Acceptance. Material for turf establishment will be evaluated under Subsections 106.02 and
106.03.
Placing of turf establishment will be evaluated under Subsections 106.02 and 106.04.
Measurement
625.11 Measure the Section 625 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable:
When measuring turf establishment and supplemental applications by the acre (hectare), measure on the ground surface.
Payment
625.12 The accepted quantities will be paid at the contract price per unit of measurement for the
Section 625 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.