Repair SCIF BLDG 150
Solicitation number
W50S8Q-23-B-0004
Issued by

About this file

This document is a schedule of material submittals for federal contract number WAARWAAR232004 to remove and alter an ISRG door at building 150. The schedule lists 18 required submittals including progress schedules, photos, stamped design drawings, door schedules, security equipment specifications, electrical and hardware materials, masonry materials, thresholds, carpet, color schedules, and paint. The contractor must submit items 1 through 5 within 10 days of the notice to proceed date, with review and approval or disapproval notes provided by the civil engineering office. Items 6 through 18 must also be submitted based on the schedule, which includes due dates, dates received, suspension dates if needed, and follow up dates to ensure contractor response for any items requiring resubmittal or not receiving final approval. The contract is with the Department of the Army National Guard for repair of a SCIF building.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 3000

SCHEDULE OF MATERIAL SUBMITTALS
( Form 66 Modified)SCHEDULE OF MATERIAL SUBMITTALS
(Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
WAARWAAR232004Remove Alter ISRG door
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAMSD SHEETOPERATING INSTRUCTIONSOther

SUBMITTAL

REQUIRED DATES DUE

BY__10__

DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1Progress Schedule
(AF Form 3064)1
2Progress Reports
(OANG Form 3065)1
3Existing Condition Photos
(Prior to Beginning Work)1
5Stamped Design Drawings1
6Adhesives1
7Door Schedule1
9Advantor Security equipment11
11Electrical material1
12Hardware1
13Masonary Material1
14Thresholds and carpet1
15Color Schedule11
16Paint11