RFI_W50S8Q23B0004_SCIFDoor.pdf
PDF 181 KB Posted
- Attached to
- Repair SCIF BLDG 150
- Solicitation number
- W50S8Q-23-B-0004
- Issued by
-
Department of the Army National Guard
About this file
This document contains responses to questions regarding solicitation number W50S8Q-23-B-0004 from the Department of the Army National Guard for repair work on a SCIF door at Building 150. The responses indicate that the new door must meet sound transmission class rating requirements of 50 or greater as specified in referenced security standards. An Advantor contact is provided but the government has no formal agreement or relationship with the company and contacting them is the contractor's responsibility. Photographs of the existing door and area are not permitted. The existing service panel will be replaced and the new location is identified on an included drawing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Offers1419_W50S8Q23B0004.pdf | ||
| W50S8Q-23-B-0004 Repair SCIF Door.pdf | ||
| Attachment 1 - SOW Bldg.150 ISRG door WAAR232004.docx | DOCX document | |
| Attachment 3 - Material Submittals ISRG Complete.xlsx | XLSX spreadsheet | |
| Attachment 5 - DBIDs -Base Entry Request.pdf | ||
| Attachment 2 - Drawings Work Area and Door Install Comb.pdf | ||
| Attachment 4 - RFI Format.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S8Q‐23‐B‐0004 Repair SCIF Door BLDG 150
Request For Information (RFI)
1. I see where the new door is to receive gasketing. Above that are there any STC rating requirements.
a. All security requirements must comply with UFC 4‐010‐05 (May 2023), which references
ICD 705, IT IS 1.5.1, and must meet an STC Rating of 50 or Greater (Sound Level 4).
2. Is there a contact name and number for Advantor.
a. Charlotte Castillo
Contract Administrator
(407) 926‐6979 castillo@advantor.com
There is no formal agreement or relationship with Advantor or this POC, however, she was contacted on previous projects. The government has had no interaction with
Advantor in regards to this project, and it is the contractors responsibility to contact and work with Advantor directly without assistance from the government.
3. Can pictures be obtained of the removed door, both sides, the opening both sides and the threshold?
a. No, area in question pictures are not permitted.
4. Is the existing service panel to be reused or is a new one requested? If new is the location the same as the existing one or is there a new requested location? Please identify if so.
a. Please see SOW 3.4.5 for panels requirements and control panel inside control area will be a new panel. See drawing 15o security install for location inside room 130 for new panel location.