This is a testing and inspection template for staircase pressurization system maintenance records. The template is designed to document performance data during testing visits to the U.S. Embassy London's Staircase Pressurization systems (COLT). The spreadsheet captures measurements across multiple parameters including stair-to-lobby pressure differential, lobby-to-corridor pressure, lift-to-lobby pressure, mean air velocity, and door opening force (measured in kilograms) for corridor-to-lobby and lobby-to-stair measurements. Testing is conducted on multiple floors with rows numbered 1-11 available for data entry.

The template establishes specific performance targets that must be maintained during testing: stair/lobby and lift/lobby pressure differentials between 5-45 Pa, corridor/lobby pressure between 42-51 Pa, mean air velocity between 2.0-3.2 m/s, and corresponding door opening force measurements. Users are instructed to copy this template into a new sheet labeled with the testing date in DD.MM.YYYY format and complete measurements on-site. All completed sheets must be retained within the workbook to maintain a historic record as required by BS 12101 standards. The template also notes that floor selection should vary across testing visits to ensure comprehensive system monitoring.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TEMPLATE

NOTE - AHEAD OF COMMENCING TESTING, COPY AND PASTE THIS TEMPLATE INTO ANOTHER SHEET LABELLED WITH THE DATE IN DD.MM.YYYY FORMAT & COMPLETE
ON SITE. PLEASE - KEEP ALL COMPLETED SHEETS IN THIS WORKBOOK TO MAINTAIN A HISTORIC RECORD - AS NOTED IN BS 12101, THE SELECTION OF FLOORS TESTED ON
EACH VISIT SHOULD BE VARIED.
DATEΔ STAIR/LOBBYΔ LOBBY/CORRIDORΔ LIFT/LOBBYMEAN CORRIDOR/LOBBYCORRIDOR/LOBBYLOBBY/STAIR
FLOORDD.MM.YYYYPRESSURE PaPRESSURE PaPRESSURE PaAIR VELOCITY m/sDOOR OPENING FORCE KGDOOR OPENING FORCE KG
LL
G
M
1
2
3
4
5
6
7
8
9
10
11
TARGETDD.MM.YYYY5Pa to 45Pa42Pa to 51Pa5Pa to 45Pa2.0 to 3.2 m/s<10 Kg<10 Kg
BS EN 12101-13Δ 5 Pa minimumΔ 40.5Pa to 49.5PaΔ 5 Pa minimum2.0 m/s<100N<100N

R

DD.MM.YYYY

NOTE - AHEAD OF COMMENCING TESTING, COPY AND PASTE THIS TEMPLATE INTO ANOTHER SHEET LABELLED WITH THE DATE IN DD.MM.YYYY FORMAT & COMPLETE
ON SITE. PLEASE - KEEP ALL COMPLETED SHEETS IN THIS WORKBOOK TO MAINTAIN A HISTORIC RECORD - AS NOTED IN BS EN 12101, THE SELECTION OF FLOORS TESTED
AT EACH VISIT SHOULD BE VARIED.
DATEΔ STAIR/LOBBYΔ LOBBY/CORRIDORΔ LIFT/LOBBYMEAN CORRIDOR/LOBBYCORRIDOR/LOBBYLOBBY/STAIR
FLOORDD.MM.YYYYPRESSURE PaPRESSURE PaPRESSURE PaAIR VELOCITY m/sDOOR OPENING FORCE KGDOOR OPENING FORCE KG
LL
G
M
1
2
3
4
5
6
7
8
9
10
11
TARGETDD.MM.YYYY5Pa to 45Pa42Pa to 51Pa5Pa to 45Pa2.0 to 3.2 m/s<10 Kg<10 Kg
BS EN 12101-13Δ 5 Pa minimumΔ 40.5Pa to 49.5PaΔ 5 Pa minimum2.0 m/s<100N<100N

DD.MM.2024

NOTE - AHEAD OF COMMENCING TESTING, COPY AND PASTE THIS TEMPLATE INTO ANOTHER SHEET LABELLED WITH THE DATE IN DD.MM.YYYY FORMAT & COMPLETE
ON SITE. PLEASE - KEEP ALL COMPLETED SHEETS IN THIS WORKBOOK TO MAINTAIN A HISTORIC RECORD - AS NOTED IN BS 12101, THE SELECTION OF FLOORS TESTED ON
EACH VISIT SHOULD BE VARIED.
DATEΔ STAIR/LOBBYΔ LOBBY/CORRIDORΔ LIFT/LOBBYMEAN CORRIDOR/LOBBYCORRIDOR/LOBBYLOBBY/STAIR
FLOORDD.MM.YYYYPRESSURE PaPRESSURE PaPRESSURE PaAIR VELOCITY m/sDOOR OPENING FORCE KGDOOR OPENING FORCE KG
LL
G
M
1
2
3
4
5
6
7
8
9
10
11
TARGETDD.MM.YYYY5Pa to 45Pa42Pa to 51Pa5Pa to 45Pa2.0 to 3.2 m/s<10 Kg<10 Kg
BS EN 12101-13Δ 5 Pa minimumΔ 40.5Pa to 49.5PaΔ 5 Pa minimum2.0 m/s<100N<100N

R

15.7, 2.9 & 14.10

THE READINGS BELOW WERE TAKEN DURING ATTENDABCE OF ADRIAN MEAGHER, DAVE COOKE & ROB SIMPER 15.7.23, 2.9.23 & 14.10.23
**THE OCTOBER READINGS ARE PERTINENT AS THE HEAD OF STAIR 3 PRD WAS SET
DATEFLOORSTAIR/LOBBYLOBBY/ACCOMLIFT/LOBBYAVERAGE FLOWS m/sNOTESLOBBY/ACCOM DOOR FORCE KG
2.9.23LL1475-1.5XNO ACCESS TO DAMPER MECHANISMX
2.9.23G1562NO LIFTXNO ACCESS TO DAMPER MECHANISMX
2.9.23M514235XFCC ON THIS LEVEL7.3
2.9.2313449162.0CLOSER FORCE AT HANDLE = 8lbs (3.6KG)
2.9.232464326XDAMPER WILL NOT FULLY SHUTX
2.9.2333951243.1XX
15.7.234240-102.0HIGH WINDSX
2.9.235294012XDAMPER STIFF, RELIEF SHAFT FAN NOT RAMPING UP & TUBE COVER BROKENNOT EXCESSIVE
15.7.236-247-202.0HIGH WINDSX
2.9.237144851.9HIGH LIFT DOOR LEAK BOTH SIDES*X
2.9.238305022XDC ASKED CAN WE GET A SPLINED U BOLT?X
2.9.23939405X*FLOOR 7 MEASURESD DOOR SIZES = STAIR 1192 x 2037 & LOBBY 1209 x 2709X
2.9.231040489XBEFORE FIRE SIGNAL LIFT GIVES 12Pa LOBBY/ACCOMODATIONX
2.9.2311415029XHIGH CEILINGX
**READINGS FOLLOWING OPENING A FURTHER 2x PRD BLADES TO MAKE IT 5x IN TOTAL:
LL
G
14.10.23M4545423.2
14.10.2312851212.1
14.10.232314415X
14.10.2332648272.9
4
14.10.2351842192.2
6
14.10.23755152.0
8
9
14.10.2310424214X
11

image1.png

File details come from the government source that posted it. Updated .