This is a testing and inspection template for staircase pressurization system maintenance records. The template is designed to document performance data during testing visits to the U.S. Embassy London's Staircase Pressurization systems (COLT). The spreadsheet captures measurements across multiple parameters including stair-to-lobby pressure differential, lobby-to-corridor pressure, lift-to-lobby pressure, mean air velocity, and door opening force (measured in kilograms) for corridor-to-lobby and lobby-to-stair measurements. Testing is conducted on multiple floors with rows numbered 1-11 available for data entry.
The template establishes specific performance targets that must be maintained during testing: stair/lobby and lift/lobby pressure differentials between 5-45 Pa, corridor/lobby pressure between 42-51 Pa, mean air velocity between 2.0-3.2 m/s, and corresponding door opening force measurements. Users are instructed to copy this template into a new sheet labeled with the testing date in DD.MM.YYYY format and complete measurements on-site. All completed sheets must be retained within the workbook to maintain a historic record as required by BS 12101 standards. The template also notes that floor selection should vary across testing visits to ensure comprehensive system monitoring.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TEMPLATE
| NOTE - AHEAD OF COMMENCING TESTING, COPY AND PASTE THIS TEMPLATE INTO ANOTHER SHEET LABELLED WITH THE DATE IN DD.MM.YYYY FORMAT & COMPLETE | |||||||
| ON SITE. PLEASE - KEEP ALL COMPLETED SHEETS IN THIS WORKBOOK TO MAINTAIN A HISTORIC RECORD - AS NOTED IN BS 12101, THE SELECTION OF FLOORS TESTED ON | |||||||
| EACH VISIT SHOULD BE VARIED. | |||||||
| DATE | Δ STAIR/LOBBY | Δ LOBBY/CORRIDOR | Δ LIFT/LOBBY | MEAN CORRIDOR/LOBBY | CORRIDOR/LOBBY | LOBBY/STAIR | |
| FLOOR | DD.MM.YYYY | PRESSURE Pa | PRESSURE Pa | PRESSURE Pa | AIR VELOCITY m/s | DOOR OPENING FORCE KG | DOOR OPENING FORCE KG |
| LL | |||||||
| G | |||||||
| M | |||||||
| 1 | |||||||
| 2 | |||||||
| 3 | |||||||
| 4 | |||||||
| 5 | |||||||
| 6 | |||||||
| 7 | |||||||
| 8 | |||||||
| 9 | |||||||
| 10 | |||||||
| 11 | |||||||
| TARGET | DD.MM.YYYY | 5Pa to 45Pa | 42Pa to 51Pa | 5Pa to 45Pa | 2.0 to 3.2 m/s | <10 Kg | <10 Kg |
| BS EN 12101-13 | Δ 5 Pa minimum | Δ 40.5Pa to 49.5Pa | Δ 5 Pa minimum | 2.0 m/s | <100N | <100N |
R
DD.MM.YYYY
| NOTE - AHEAD OF COMMENCING TESTING, COPY AND PASTE THIS TEMPLATE INTO ANOTHER SHEET LABELLED WITH THE DATE IN DD.MM.YYYY FORMAT & COMPLETE | |||||||
| ON SITE. PLEASE - KEEP ALL COMPLETED SHEETS IN THIS WORKBOOK TO MAINTAIN A HISTORIC RECORD - AS NOTED IN BS EN 12101, THE SELECTION OF FLOORS TESTED | |||||||
| AT EACH VISIT SHOULD BE VARIED. | |||||||
| DATE | Δ STAIR/LOBBY | Δ LOBBY/CORRIDOR | Δ LIFT/LOBBY | MEAN CORRIDOR/LOBBY | CORRIDOR/LOBBY | LOBBY/STAIR | |
| FLOOR | DD.MM.YYYY | PRESSURE Pa | PRESSURE Pa | PRESSURE Pa | AIR VELOCITY m/s | DOOR OPENING FORCE KG | DOOR OPENING FORCE KG |
| LL | |||||||
| G | |||||||
| M | |||||||
| 1 | |||||||
| 2 | |||||||
| 3 | |||||||
| 4 | |||||||
| 5 | |||||||
| 6 | |||||||
| 7 | |||||||
| 8 | |||||||
| 9 | |||||||
| 10 | |||||||
| 11 | |||||||
| TARGET | DD.MM.YYYY | 5Pa to 45Pa | 42Pa to 51Pa | 5Pa to 45Pa | 2.0 to 3.2 m/s | <10 Kg | <10 Kg |
| BS EN 12101-13 | Δ 5 Pa minimum | Δ 40.5Pa to 49.5Pa | Δ 5 Pa minimum | 2.0 m/s | <100N | <100N |
DD.MM.2024
| NOTE - AHEAD OF COMMENCING TESTING, COPY AND PASTE THIS TEMPLATE INTO ANOTHER SHEET LABELLED WITH THE DATE IN DD.MM.YYYY FORMAT & COMPLETE | |||||||
| ON SITE. PLEASE - KEEP ALL COMPLETED SHEETS IN THIS WORKBOOK TO MAINTAIN A HISTORIC RECORD - AS NOTED IN BS 12101, THE SELECTION OF FLOORS TESTED ON | |||||||
| EACH VISIT SHOULD BE VARIED. | |||||||
| DATE | Δ STAIR/LOBBY | Δ LOBBY/CORRIDOR | Δ LIFT/LOBBY | MEAN CORRIDOR/LOBBY | CORRIDOR/LOBBY | LOBBY/STAIR | |
| FLOOR | DD.MM.YYYY | PRESSURE Pa | PRESSURE Pa | PRESSURE Pa | AIR VELOCITY m/s | DOOR OPENING FORCE KG | DOOR OPENING FORCE KG |
| LL | |||||||
| G | |||||||
| M | |||||||
| 1 | |||||||
| 2 | |||||||
| 3 | |||||||
| 4 | |||||||
| 5 | |||||||
| 6 | |||||||
| 7 | |||||||
| 8 | |||||||
| 9 | |||||||
| 10 | |||||||
| 11 | |||||||
| TARGET | DD.MM.YYYY | 5Pa to 45Pa | 42Pa to 51Pa | 5Pa to 45Pa | 2.0 to 3.2 m/s | <10 Kg | <10 Kg |
| BS EN 12101-13 | Δ 5 Pa minimum | Δ 40.5Pa to 49.5Pa | Δ 5 Pa minimum | 2.0 m/s | <100N | <100N |
R
15.7, 2.9 & 14.10
| THE READINGS BELOW WERE TAKEN DURING ATTENDABCE OF ADRIAN MEAGHER, DAVE COOKE & ROB SIMPER 15.7.23, 2.9.23 & 14.10.23 | |||||||
| **THE OCTOBER READINGS ARE PERTINENT AS THE HEAD OF STAIR 3 PRD WAS SET | |||||||
| DATE | FLOOR | STAIR/LOBBY | LOBBY/ACCOM | LIFT/LOBBY | AVERAGE FLOWS m/s | NOTES | LOBBY/ACCOM DOOR FORCE KG |
| 2.9.23 | LL | 14 | 75 | -1.5 | X | NO ACCESS TO DAMPER MECHANISM | X |
| 2.9.23 | G | 15 | 62 | NO LIFT | X | NO ACCESS TO DAMPER MECHANISM | X |
| 2.9.23 | M | 51 | 42 | 35 | X | FCC ON THIS LEVEL | 7.3 |
| 2.9.23 | 1 | 34 | 49 | 16 | 2.0 | CLOSER FORCE AT HANDLE = 8lbs (3.6KG) | |
| 2.9.23 | 2 | 46 | 43 | 26 | X | DAMPER WILL NOT FULLY SHUT | X |
| 2.9.23 | 3 | 39 | 51 | 24 | 3.1 | X | X |
| 15.7.23 | 4 | 2 | 40 | -10 | 2.0 | HIGH WINDS | X |
| 2.9.23 | 5 | 29 | 40 | 12 | X | DAMPER STIFF, RELIEF SHAFT FAN NOT RAMPING UP & TUBE COVER BROKEN | NOT EXCESSIVE |
| 15.7.23 | 6 | -2 | 47 | -20 | 2.0 | HIGH WINDS | X |
| 2.9.23 | 7 | 14 | 48 | 5 | 1.9 | HIGH LIFT DOOR LEAK BOTH SIDES* | X |
| 2.9.23 | 8 | 30 | 50 | 22 | X | DC ASKED CAN WE GET A SPLINED U BOLT? | X |
| 2.9.23 | 9 | 39 | 40 | 5 | X | *FLOOR 7 MEASURESD DOOR SIZES = STAIR 1192 x 2037 & LOBBY 1209 x 2709 | X |
| 2.9.23 | 10 | 40 | 48 | 9 | X | BEFORE FIRE SIGNAL LIFT GIVES 12Pa LOBBY/ACCOMODATION | X |
| 2.9.23 | 11 | 41 | 50 | 29 | X | HIGH CEILING | X |
| **READINGS FOLLOWING OPENING A FURTHER 2x PRD BLADES TO MAKE IT 5x IN TOTAL: | |||||||
| LL | |||||||
| G | |||||||
| 14.10.23 | M | 45 | 45 | 42 | 3.2 | ||
| 14.10.23 | 1 | 28 | 51 | 21 | 2.1 | ||
| 14.10.23 | 2 | 31 | 44 | 15 | X | ||
| 14.10.23 | 3 | 26 | 48 | 27 | 2.9 | ||
| 4 | |||||||
| 14.10.23 | 5 | 18 | 42 | 19 | 2.2 | ||
| 6 | |||||||
| 14.10.23 | 7 | 5 | 51 | 5 | 2.0 | ||
| 8 | |||||||
| 9 | |||||||
| 14.10.23 | 10 | 42 | 42 | 14 | X | ||
| 11 |