This combined synopsis and solicitation requests proposals for a High Frequency Radio System to be acquired by the United States Coast Guard. The Coast Guard seeks to award an indefinite delivery/indefinite quantity contract for a single vendor to supply the radio system over a ten-year period of performance. The radio system must meet specifications in the attachment and include hardware, software, training, and logistics support. Proposals are due by June 14, 2021 through the Department of Defense's Safe Access File Exchange system. Questions about the solicitation are due by May 21, 2021. The solicitation incorporates various FAR provisions related to commercial item contracting and references additional contract requirements in attachments related to pricing, specifications, delivery, and inspection.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3 Logistics Plan Requirements
Solicitation: 70Z04421R21000900
1 LOGISTICS REQUIREMENTS
The High Frequency Radio System (HFRS) shall be comprised of supportable components supplied by a vendor utilizing proactive lifecycle management. In order to address this concern, the following requirements shall be addressed in the contractor’s proposed logistics plan, which is a part of the proposal and not a Contract Deliverable Line Item
(CDRL).
The contractor’s proposed logistics plan shall be clearly articulated in the “Logistics and Training Plan Section” of their technical proposal. The awarded contractor’s logistics plan will be included as an attachment to the final contract at time of award.
1.1 A detailed logistics plan that sufficiently outlines the overall approach to deliver, sustain, maximize component commonality and provide continuity of the proposed components up to the full vessel kit quantity (12 total vessels) over the duration of the awarded contract, plus the warranty duration for all items ordered.
1.2 For each component proposed under this contract, provide the following information:
• Mean Time Between Failure (MTBF) for each item;
• Discuss level of reparability of the item (i.e. consumable, extent to which the item may be repaired to the component level, etc.);
• Expected end of support date for each item;
• If end of support is within 5 years, provide the form-fit-function replacement item anticipated to replace it and a statement affirming backward compatibility.
1.3 Explain contractor protocol and timeframes for notifying customers of end of life or critical maintenance/support issues throughout component lifecycle.
1.4 Include details as to how software updates will be implemented, and how the system will continue to meet all of the minimum specifications and functions over the life of the contract.
1.5 Address what can be offered to minimize the system's logistical footprint as well as address scalability possibilities and maximal use of common components across the various configurations.
1.6 Provide notification timelines as well as lead times for software updates, product/component end of life, and reparability support.
1.7 Address the methodology and timelines for replacement of components, and demonstrate how minimum specifications will be met to include form, fit, power and functions for the life of the contract period.
Attachment 3 Logistics Plan Requirements
Solicitation: 70Z04421R21000900
1.8 The USCG has a stringent configuration control process that necessitates 12-month lead-time to approve any software and/or hardware changes. The USCG will require notification of changes or end of life of components, including planned dates of predecessor purchase non-availability. This notification must be given with sufficient time for the USCG to process the configuration management change of the installed system prior to acquiring the replacement/updated component and placing it in service on a USCG vessel. Address how the required information will be provided and on what schedule to permit the USCG to abide by its configuration change processes.
1.9 Diminishing Manufacturing Sources and Material Shortage (DMSMS) Monitoring
(HW/SW)
1.9.1 DMSMS is defined as the loss or impending loss of manufacturers of items or suppliers of items or raw materials. For the purposes of this requirement, DMSMS and obsolescence are used interchangeably.
1.9.2 The Contractor shall assist the Coast Guard in implementing an aggressive, proactive approach to DMSMS and its impact on HFRS. The Contractor shall provide a four tier approach focusing on the following concepts. The Contractor shall, at a minimum of 18 months in advance:
1.9.2.1 Identify and notify the USCG of C4ISR parts to be
discontinued.
1.9.2.2 Document/verify that no other sources of supply exist.
1.9.2.3 Accomplish an options analysis.
1.9.2.4 Identify steps to implement resolution..
1.9.3 The Contractor shall find suitable replacement components of
DMSMS items and minimize the amount of design changes necessary to maintain the deployed HFRS’ functionality baseline and component baseline.
The Contractor may be required to deliver a quarterly DMSMS report describing recommendations and solutions.
1.9.4 The DMSMS effort shall be performed in accordance with non-repairable Common Criteria Evaluation and Validation Scheme (CCEVS) approved components and information assurance (IA) accredited/certified processes. For non-IA enabled components, form, fit, function replacements shall be investigated.
1.9.5 The Contractor shall provide integration assistance when requested by the Contracting Officer and COR for identified DMSMS items.