This is a lane closure attachment document related to a catch basin and drainage structure cleaning project in Allagan and Barry County, Michigan. The document outlines traffic control measures and lane closure procedures for work performed on state route 4402, specifically for the section designated as 4402-M-NFW-1LC. The attachment specifies the geographic parameters, timing restrictions, and operational requirements for managing vehicle traffic during the drainage structure cleaning operations in the identified counties. The document establishes the framework for coordinating work activities with traffic management to ensure safety and maintain traffic flow on the affected roadway while cleaning operations are conducted.
The lane closure procedures documented in this attachment serve as an operational guideline for the contractor performing the catch basin and drainage structure cleaning work. The specifications detail traffic control requirements, closure schedules, and coordination protocols necessary for executing work on state route 4402 while minimizing disruption to the traveling public. This attachment functions as supporting documentation for the overall contract opportunity and ensures that contractors understand the traffic management obligations and constraints associated with the cleaning project in the Allegan and Barry County service area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT TO SCALE
4402-M-NFW-1LC
DURATION:
FILE:
Michigan Department of Transportation
MAY 2021
DIVIDED ROADWAY WITH CURBS
AND SPEED LIMITS 45 MPH OR LESS
LANE CLOSURE ON A DATE:
SHEET:
NO:
MAINTENANCE
SHORT-DURATION
MOBILE
MAINTAINING TRAFFIC
TYPICAL
4402-M-NFW-1LC.dgn
C U
R B
C U
R B
C U
R B
C U
R B
C U
R B
C U
R B
C U
R B
C U
R B
KEY
NOTES
ROAD
WORK
AHEAD
W20-1
S
S MOUNTED ATTENUATOR
SHADOW VEHICLE WITH OPTIONAL TRUCK
TRAFFIC FLOW
LIGHTED ARROW PANEL
R O
L L
A H
E A
D
S P
A C
E
W O
R K
R
E
V
R
IE
S
M
IL
E S
M
X
IM
U M
(ARROW MODE)
LIGHTED ARROW PANEL
PATCHING AND OTHER ACTIVITIES IN AREAS WITH CURBED ROADWAY.
SPEED LIMITS OF 45 MPH OR LESS. USED FOR PATROLLING, MINOR
THIS DETAIL IS ONLY ALLOWED IN AREAS WITHOUT SHOULDERS AND
"ROAD WORK AHEAD" SIGN SHALL BE WITHIN TWO MILES OF WORK AREA.
MAINT & SURV:
SIGNING:
GENERAL:
MS1, MS2, MS3, MS4, MS5
S1
G1, G2, G3, G4
STANDARD NOTES
(SEE 102-GEN-NOTES)
File details come from the government source that posted it. Updated .