Attachment_3_Hydromet_Maintenance_upgrades_and_replacement_list.pdf
PDF 172 KB Posted
- Attached to
- DWR Hydromet Maintenance Federal contract opportunity
- Solicitation number
- 140R2024Q0061
About this file
This document is an attachment that provides a 5-year maintenance, upgrade, and replacement plan for DWR's hydromet monitoring sites across several river basins in California. The plan lists 52 individual sites, including the site name, CDEC ID, structure type, elevation, datalogger, maintaining agency, and an upgrade phase indicator. The upgrade phases range from 0 (already upgraded) to 4 (structure cannot support new instrumentation). The related federal contract opportunity is a solicitation from the Department of the Interior Bureau of Reclamation for DWR Hydromet Repair & Maintenance Services, with a solicitation number of 140R2024Q0061.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R2024Q0061_Amd_0002.pdf | ||
| Amd_0001_140R2024Q0061_Combined_Synopsis_Solicitation_0001.pdf | ||
| Sol_140R2024Q0061_Amd_0001.pdf | ||
| Sol_140R2024Q0061.pdf | ||
| Attachment_2_Price_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_1_WD2015-5631.pdf | ||
| WBR-1406_303-1_Template-1_JOTFOC_FAR-6_4-2021_(3).pdf | ||
| Attachment_4_WBR-1419_7-Template-1_Small-Business-Subcontracting-Plan_02-2024.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 DWR Hydromet Maintenance 5‐year period 2024‐2029 Upgrades and Replacement Evaluation
Basin Site Name CDEC ID Structure Type Elevation Datalogger Maintainer Upgrade Phase AMERICAN RIVER Caples Lake CAP A-Frame snow 8,000 Campbell DWR 0
AMERICAN RIVER Forni Ridge FRN 25G Tower snow 7,600 Sutron USBR & DWR 4
AMERICAN RIVER Silver Lake SIL A-Frame snow 7,100 Campbell DWR 0
AMERICAN RIVER Huysink HYS A-Frame snow 6,600 Sutron USBR & DWR 3
AMERICAN RIVER Greek Store GKS A-Frame snow 5,600 Sutron USBR & DWR 3
AMERICAN RIVER Blue Canyon BLC 25G Tower snow 5,280 Sutron USBR & DWR 4
AMERICAN RIVER Sugar Pine -S SGP Standpipe precip Sutron USBR & DWR 3
AMERICAN RIVER Georgetown -S GTW Standpipe precip Sutron USBR & DWR 3
AMERICAN RIVER Auburn Dam Ridge -S ADR Standpipe precip Sutron USBR & DWR 3
AMERICAN RIVER Pacific House -S PFH Standpipe precip Sutron USBR & DWR 3
COSUMNES RIVER Sly Park -S SLP Standpipe precip Sutron USBR & DWR 3
MOKELUMNE RIVER
Calavaras Ranger Station -
S CVS Standpipe precip
Sutron USBR & DWR
OWENS RIVER Mammoth Pass MHP A-Frame snow 9,300 Sutron USBR & DWR 3
SACRAMENTO RIVER Sand Flat SDF A-Frame snow 6,750 Vaisala USBR & DWR 1
SACRAMENTO RIVER Medicine Lake MED A-Frame snow 6,700 Vaisala DWR 1
SACRAMENTO RIVER Snow Mountain SNM A-Frame snow 5,950 Vaisala USBR & DWR 1
SACRAMENTO RIVER Slate Creek SLT A-Frame snow 5,700 Vaisala USBR & DWR 1
SACRAMENTO RIVER Stouts Meadow STM A-Frame snow 5,400 Vaisala DWR 1
SAN JOAQUIN RIVER Volcanic Knob VLC Wilderness
Pole snow 10,050
Campbell DWR
SAN JOAQUIN RIVER Agnew Pass AGP Wilderness
Pole snow 9,450
Vaisala DWR
SAN JOAQUIN RIVER Kaiser Point KSP A-Frame snow 9,200 Sutron USBR & DWR 3
SAN JOAQUIN RIVER Green Mountain GRM 55G Tower snow 7,900 Campbell USBR & DWR 0
SAN JOAQUIN RIVER Tamarack Summit TMR A-Frame snow 7,550 Sutron USBR & DWR 3
SAN JOAQUIN RIVER Chilkoot Meadow CHM A-Frame snow 7,150 Sutron USBR & DWR 3
SAN JOAQUIN RIVER Huntington Lake HNT A-Frame snow 7,000 Campbell USBR & DWR 0
SAN JOAQUIN RIVER Graveyard Meadow GRV A-Frame snow 6,900 Sutron USBR & DWR 3
SAN JOAQUIN RIVER Poison Ridge PSR A-Frame snow 6,900 Sutron USBR & DWR 3
SAN JOAQUIN RIVER Nature's Point -S NTP Standpipe precip Sutron USBR & DWR 3
SAN JOAQUIN RIVER Goat Mountain -S GTM Standpipe precip Sutron USBR & DWR 3
SAN JOAQUIN RIVER Peckenpah -S PCK Standpipe precip Sutron USBR & DWR 3
SAN JOAQUIN RIVER Bald Mountain -S BDM Standpipe precip Sutron USBR & DWR 3
SAN JOAQUIN RIVER Friant Dam -S FRT Standpipe precip Sutron USBR & DWR 3
STANISLAUS RIVER Deadman Creek DDM A-Frame snow 9,250 Campbell DWR 3
STANISLAUS RIVER Gianelli Meadow GNL A-Frame snow 8,400 Sutron USBR & DWR 3
STANISLAUS RIVER Stanislaus Meadow SLM A-Frame snow 7,750 Campbell DWR 3
STANISLAUS RIVER Bloods Creek BLD A-Frame snow 7,200 Sutron USBR & DWR 3
STANISLAUS RIVER Black Springs BLS A-Frame snow 6,500 Sutron USBR & DWR 3
STANISLAUS RIVER Telegraph Hill -S TLH Standpipe precip Sutron USBR & DWR 3
STANISLAUS RIVER New Melones Dam -S NML Standpipe precip Sutron USBR & DWR 3
TRINITY RIVER Peterson Flat PET A-Frame snow 7,150 Vaisala DWR 1
TRINITY RIVER Red Rock Mountain RRM 25G Tower snow 6,700 Vaisala DWR 2
TRINITY RIVER Bonanza King BNK 25G Tower snow 6,450 Vaisala USBR & DWR 2
TRINITY RIVER Shimmy Lake SHM 25G Tower snow 6,400 Vaisala DWR 2
TRINITY RIVER Middle Boulder 3 MB3 25G Tower snow 6,200 Satlink3 DWR 2
TRINITY RIVER Highland Lakes HIG A-Frame snow 6,030 Vaisala DWR 1
TRINITY RIVER Scott Mountain SCT A-Frame snow 5,900 Vaisala DWR 1
TRINITY RIVER Mumbo Basin MUM A-Frame snow 5,650 Vaisala DWR 1
TRINITY RIVER Big Flat BFL A-Frame snow 5,100 Vaisala DWR 1 0 Site has been upgraded to HyDAS standards 1 Instrumentation needs to be replaced immediately and site has structural integrity 2 Instrumentation needs to be replaced immediately but structure can not support all new instruments 3 Site has been upgraded to Sutron but cannot support HyDAS instrumentation. Structure Compatible 4 Site has been upgraded to Sutron but cannot support HyDAS instrumentation. Structure Integrity Not Compatible
File details come from the government source that posted it. Updated .