Attachment 3 - Functional Area vs. Requirements Matrix.pdf
PDF 571 KB Posted
- Attached to
- Undersea Weapons and Undersea Defensive (UW/UD) Family of Systems (FoS) Multiple Award Contract (MAC)
- Solicitation number
- N66604-23-R-0285
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Attachment 3 - Functional Area vs Requirements Matrix
P a g e 1
Functional Areas
1.
P ay lo ad s
2.
H ul l a nd S tr uc tu re
3.
P ro pu ls io n
4.
E ne rg y St or ag e an d C on ve rs io n
5.
E le ct ri ca l P ow er
6.
S of tw ar e
7.
N on -P ay lo ad S en so rs
8.
G ui da nc e an d
C on tr ol
S ys te m
9.
L au nc h P la tf or m
I nt er fa ce s
. A nc ill ar y
E qu ip m en t
M od el in g a nd S im ul at io n
D at a
A na ly ti cs
4.0 TECHNICAL REQUIREMENTS
4.0.1 Program Management x x x x x x x x x x x
x
4.1 CONCEPT DESIGN DEFINITION
4.1.1 Concept Design Analysis and Assessment Studies x x x x x x x x x x x x
4.1.2 Performance Predictions x x x x x x x x x x x x
4.1.3 Analysis of Operation x x x x x x x x x x x x
4.1.4 Compatibility Analysis x x x x x x x x x x x x
4.1.5 Concept Specification Development and Review x x x x x x x x x x x x
4.2 PROTOTYPE DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION AND TEST
4.2.1 Prototype Design and Development x x x x x x x x x x x x
4.2.2 Prototyping x x x x x x x x x x x x
4.2.3 Prototype Integration and Verification Testing x x x x x x x x x x x x
4.3 TEST AND EVALUATION
4.3.1 Test and Evaluation Planning x x x x x x x x x x x x
4.3.2 Preparation for Testing x x x x x x x x x x x x
4.3.3 Test Execution x x x x x x x x x x x x
4.3.4 Post-Test Analysis x x x x x x x x x x x x
4.4 DEMONSTRATION, EXPERIMENTATION, FIELDING, AND OPERATION x x x x x x x x x x
4.5 LOGISTICS AND MAINTENANCE ACTIVITIES
4.5.1 Prototype Logistics and Maintenance x x x x x x x x x x
4.5.2 Software Maintenance x x x x x x x x x
4.5.3 Model and Simulation Maintenance x
4.5.4 Program Protection Assessment and Monitoring x x x x x x x x x x
4.6 PROTOTYPE TRANSITION TO PRODUCTION
4.6.1 Production Level Documentation x x x x x x x x x x
4.6.2 Low Rate Initial Production x x x x x x x x x x
4.6.3 Full Rate Production x x x x x x x x x x
File details come from the government source that posted it. Updated .