Attachment 3 - Functional Area vs. Requirements Matrix.pdf

PDF 571 KB Posted

Attached to
Undersea Weapons and Undersea Defensive (UW/UD) Family of Systems (FoS) Multiple Award Contract (MAC)
Solicitation number
N66604-23-R-0285
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Attachment 3 - Functional Area vs Requirements Matrix

P a g e 1

Functional Areas

1.

P ay lo ad s

2.

H ul l a nd S tr uc tu re

3.

P ro pu ls io n

4.

E ne rg y St or ag e an d C on ve rs io n

5.

E le ct ri ca l P ow er

6.

S of tw ar e

7.

N on -P ay lo ad S en so rs

8.

G ui da nc e an d

C on tr ol

S ys te m

9.

L au nc h P la tf or m

I nt er fa ce s

. A nc ill ar y

E qu ip m en t

M od el in g a nd S im ul at io n

D at a

A na ly ti cs

4.0 TECHNICAL REQUIREMENTS

4.0.1 Program Management x x x x x x x x x x x

x

4.1 CONCEPT DESIGN DEFINITION

4.1.1 Concept Design Analysis and Assessment Studies x x x x x x x x x x x x

4.1.2 Performance Predictions x x x x x x x x x x x x

4.1.3 Analysis of Operation x x x x x x x x x x x x

4.1.4 Compatibility Analysis x x x x x x x x x x x x

4.1.5 Concept Specification Development and Review x x x x x x x x x x x x

4.2 PROTOTYPE DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION AND TEST

4.2.1 Prototype Design and Development x x x x x x x x x x x x

4.2.2 Prototyping x x x x x x x x x x x x

4.2.3 Prototype Integration and Verification Testing x x x x x x x x x x x x

4.3 TEST AND EVALUATION

4.3.1 Test and Evaluation Planning x x x x x x x x x x x x

4.3.2 Preparation for Testing x x x x x x x x x x x x

4.3.3 Test Execution x x x x x x x x x x x x

4.3.4 Post-Test Analysis x x x x x x x x x x x x

4.4 DEMONSTRATION, EXPERIMENTATION, FIELDING, AND OPERATION x x x x x x x x x x

4.5 LOGISTICS AND MAINTENANCE ACTIVITIES

4.5.1 Prototype Logistics and Maintenance x x x x x x x x x x

4.5.2 Software Maintenance x x x x x x x x x

4.5.3 Model and Simulation Maintenance x

4.5.4 Program Protection Assessment and Monitoring x x x x x x x x x x

4.6 PROTOTYPE TRANSITION TO PRODUCTION

4.6.1 Production Level Documentation x x x x x x x x x x

4.6.2 Low Rate Initial Production x x x x x x x x x x

4.6.3 Full Rate Production x x x x x x x x x x

File details come from the government source that posted it. Updated .