PERFORMANCE REQUIREMENTS SUMMARY TABLE (PRST)
Requirement CDRL Performance Objective Performance Standard Acceptable
Quality
Level (AQL)
Monitoring Method
4.0.1.1
Technical
Interchange
Meetings (TIM)
A001
A002
Schedules are detailed and realistic;
Costs are allocated and controlled;
Risks are managed and mitigated.
Documentation requires not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.0.1.2
Quality
Assurance
A003
A004
A005
Perform quality assurance testing in accordance with Applicable
Documents to verify systems operate in accordance with all government approved change requests.
Test plans and final disposition technical reports require not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.0.1.3
Technical Data
Packages
Configuration
Management
A008 Documentation is complete and accurate. Markings are correct and consistent.
Documentation requires not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.1.1
Concept Design
Analysis and
Assessment
Studies
A009 Requirements are complete and clearly stated; schedules are detailed and realistic.
Technical reports require not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
NOTE 1: APPLICABILITY OF SOME OR ALL OF THESE PRST REQUIREMENTS WILL BE
DETERMINED AT THE DELIVERY/TASK ORDER LEVEL
NOTE 2: OBJECTIVES AND STANDARDS MAY BE MODIFIED AT THE DELIVERY/TASK ORDER
LEVEL BASED UPON THE REQUIREMENT.
Quality
Level (AQL)
Monitoring Method
4.1.2
Performance
Predictions
A009 Documentation is complete and accurate.
Documentation and final disposition technical reports require not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.1.3
Analysis of
Operation
A009 Documentation is complete and accurate.
Documentation and final disposition technical reports require not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.1.4
Compatibility
Analysis
A008
A009
Documentation is complete and accurate.
Documentation and final disposition technical reports require not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.1.5
Concept
Specification
Development and Review
A008
A009
A00A
Requirements are complete and clearly stated; schedules are detailed and realistic. Documentation is complete and accurate.
Documentation and final disposition technical reports require not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.2.1
Prototype
Design and
Development
A008
A009
A00B
Prototypes meet requirements.
Documentation is complete and accurate.
Documentation requires not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
Quality
Level (AQL)
Monitoring Method
4.2.1.1
Prototype
Electrical
Design
A008
A00A
A00C
Prototypes meet requirements.
Documentation is complete and accurate.
Documentation requires not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.2.1.2
Prototype
Mechanical
Design
A008
A00A
Prototypes meet requirements.
Documentation is complete and accurate.
Documentation requires not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.2.1.3
Prototype
Software design
A009
A00D
A00E, A00F
A00G
Prototypes meet requirements.
Documentation is complete and accurate.
Documentation requires not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.2.1.4
Prototype
Human-
Machine
Interfaces
(HMI)
A00H Prototypes meet requirements.
Documentation is complete and accurate.
Documentation requires not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.2.1.5
Prototype
Software and
Firmware
Implementation
A00J
A00K
A00L
A00M
A00N
A00P
A00Q
A00R
A00S
Prototypes meet requirements.
Documentation is complete and accurate.
Documentation requires not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all
Quality
Level (AQL)
Monitoring Method
4.2.2
Prototyping
A00T Prototypes are fabricated per TDP.
Tests are executed per plan and test data collected is clear, concise and properly documented.
Prototypes are fabricated per TDP. Report requires no more than one
(1) review/comment/approval cycles to meet acceptance..
Standard met by 90% of the prototypes and by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.2.3 Prototype
Integration and
Verification
Testing
A00B Integration and verification test plans/reports are in accordance with
Applicable Documents. Documentation is complete and accurate.
The work product requires no more than one
(1) review/comment/approval cycles to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.3.1
Test and
Evaluation
Planning
A00B Test plans and procedures are complete and in accordance with test requirements.
The work product requires no more than one
(1) review/comment/approval cycles to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.3.2
Preparation for
Testing
A00U Test preparations are complete, documented and in accordance with test requirements.
The work product requires no more than one
(1) review/comment/approval cycles to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.3.3
Test Execution
A00C, A00V
Tests are executed per plan and test data collected is clear, concise and properly documented. Technical reports are in accordance with
Applicable Documents.
The work product requires no more than one
(1) review/comment/approval cycles to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all
Quality
Level (AQL)
Monitoring Method
4.3.4
Post-Test
Analysis
A009 Test reports are in accordance with
Applicable Documents.
The work product requires no more than one
(1) review/comment/approval cycles to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.4
Demonstration, Experimentation, Fielding and
Operation
A00C
A00V
A00W
A00X
Test plans are complete and in accordance with test requirements.
Tests are executed per plan and test data collected is clear, concise and properly documented. Technical
Reports include all necessary documentation, provide accurate inspection analysis, clearly identify issues and provide insightful recommendations for corrective actions to resolve discrepancies noted.
The work product requires no more than one
(1) review/comment/approval cycles to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.5.1
Logistics and
Maintenance
Activities
A00Y
A00Z
A010
A011
A012
A013
Technical Reports include all necessary documentation, provide accurate inspection analysis, clearly identify issues and provide insightful recommendations for corrective actions to resolve discrepancies noted.
Documentation and final disposition technical reports require not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.5.2
Software
Maintenance
A008
A009
A00D
A00E
A00F
A00G
Documentation is complete and accurate. Markings are correct and consistent.
Documentation and final disposition technical reports require not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all
Quality
Level (AQL)
Monitoring Method
4.5.3
Modeling and
Simulation
Maintenance
A008
A009
A00D
A00E
Documentation is complete and accurate. Markings are correct and consistent.
Documentation and final disposition technical reports require not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.5.4
Program
Protection
Assessment and
Monitoring
A008
A009
Documentation is complete and accurate. Markings are correct and consistent.
Documentation and final disposition technical reports require not more than one review and comment and approval cycle to meet acceptance.
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.6.1
Production
Level
Documentation
A008 Technical documentation is complete and accurate and delivered in accordance with schedule.
Documentation and final disposition technical reports require not more than one review and comment and approval cycle to meet acceptance. Documentation is delivered on time per the Integrated Management Schedule
(IMS).
Standard met by 95% of the documents
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all other technical documentation/data products
4.6.2
Low Rate Initial
Production
N/A Materials are fabricated per TDP and delivered in accordance with schedule.
Materials are delivered on time per the
Integrated Management Schedule (IMS).
Materials meet TDP and are undamaged.
Standard met by 95% of the items to be delivered
Government will perform appropriate inspections upon arrival and record the date a shipment is accepted.
4.6.3
Full Rate
Production
N/A Materials are fabricated per TDP and delivered in accordance with schedule.
Materials are delivered on time per the
Integrated Management Schedule (IMS).
Materials meet TDP and are undamaged.
Standard met by 95% of the items to be delivered
Government will perform appropriate inspections upon arrival and record the date a shipment is accepted.
5.0.1
Contractor’s
Status Report
A014 Documentation is complete and accurate. Markings are correct and consistent.
The work product requires no more than one
(1) review/comment/approval cycles to meet acceptance.
Standard met by 95% of the reports
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all
5.0.2
Required
Mandatory and
Limited Audience
Training
A015
A016
Trainings are completed on time.
Documentation is complete and accurate. Markings are correct and consistent.
The work product requires no more than one
(1) review/comment/approval cycles to meet acceptance. A failure to meet training requirements does not prevent the contractor from performing their duties.
Standard met
95% of the trainings
Government oversight as part of the review, comment, and approval process.
Government will review the plans and all
File details come from the government source that posted it. Updated .