RV PARKING AREA AT OAK PARK
MAHG22-1015
KEESLER AFB, MISSISSIPPI
27 MAY, 2022
T1.0
TITLE SHEET
PROJECT SITE
VICINITY MAP - KEESLER AIR FORCE BASE
NOT TO SCALE
LOCATION MAP - KEESLER AIR FORCE BASE
NOT TO SCALE
PROJECT LOCATION
KE
ES
LE
R A
FB
BILOXI BAY
KE
ES
LE
R A
FB
WHITE AVE. GATE
BASE ENTRANCE
LA
R
C H
ER
B
LV
D
BILOXI BAY
GULF OF MEXICO
INDEX OF DRAWINGS
T1.0 TITLE SHEET
G1.0 GENERAL NOTES
D1.0 EXISTING CONDITIONS
D1.1 RV PARKING SITE DEMOLITION
C1.0 SITE MODIFICATION PLAN
C1.1 GEOMETRY PLAN
C1.2 RV PARKING GRADING PLAN
C4.0 SECTIONS AND ELEVATIONS
C5.0 CIVIL DETAILS I
C5.1 CIVIL DETAILS II
E0.0 ELECTRICAL NOTES
E1.0 ELECTRICAL POWER PLAN
E1.1 PHOTOMETRIC PLAN
E5.0 ELECTRICAL DETAILS
E6.0 PANEL SCHEDULES
A. MARASCA G. REED
VARIES
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-101527 MAY 2022
N/A
RV PARKING AREA AT OAK PARK
R. HOYT
M. HORNE
G1.0
GENERAL NOTES
CIVIL SYMBOL LEGEND:
1. NO FIELD SURVEY DATA WAS COLLECTED PRIOR TO DESIGN. ALL
TOPOGRAPHIC, UTILITY, AND FEATURE DATA ARE BASED ON
EXTERNAL DATA SOURCES LISTED BELOW OR FIELD OBSERVATION.
THE CONTRACTOR IS RESPONSIBLE FOR PERFORMANCE OF A
TOPOGRAPHIC SURVEY AND UTILITY LOCATE PRIOR TO
CONSTRUCTION TO VERIFY THE DESIGN.
a. USGS LIDAR DATA, DATED APRIL 4, 2015.
2. DESIGN DRAWINGS ARE REPORTED IN REFERENCE TO THE
FOLLOWING:
· VERTICAL DATUM: NAVD 88
· HORIZONTAL DATUM: NAD 83 STATE PLANE
COORDINATES, MISSISSIPPI EAST ZONE 2301
4. PRESERVE AND PROTECT ALL PERMANENT REFERENCE
MONUMENTS, PERMANENT CONTROL POINTS, PERMANENT
BENCHMARKS AND PROPERTY CORNERS. IF THE MONUMENTS,
POINTS OR MARKERS ARE DISTURBED, EMPLOY A MISSISSIPPI
REGISTERED PROFESSIONAL LAND SURVEYOR TO RESET OR
REPLACE THEM AT CONTRACTOR'S OWN COST.
1. THE ASSOCIATED STATEMENT OF WORK AND SPECIFICATIONS
DEVELOPED AS PART OF THE DESIGN PACKAGE ARE PART OF AND
APPLY TO WORK SHOWN ON THESE DRAWINGS.
2. ALL DIMENSIONS ARE APPROXIMATE AND ARE NOT GUARANTEED TO
BE CORRECT. FIELD VERIFY ALL DIMENSIONS, LINE SIZES, AND
CONDITIONS PRIOR TO ORDERING MATERIALS OR PROCEEDING WITH
ANY WORK. IF CONDITIONS AND DIMENSIONS VARY FROM THOSE
SHOWN, NOTIFY IN WRITING THE COR BEFORE PROCEEDING WITH
THE WORK.
3. PROTECT ALL ELEMENTS TO REMAIN SUCH AS EXISTING UTILITIES,
ROADS, CURBS, DRIVES, SIDEWALKS, SOD, ETC. RESTORE ANY
DAMAGED ELEMENTS TO THE ORIGINAL CONDITIONS AT
CONTRACTOR’S OWN COST.
4. CONFINE WORK TO SPECIFIC AREAS AS DESIGNATED IN THE SCOPE
OF WORK. DO NOT DISTURB OR IMPACT THE AVAILABILITY OR
ACCESSIBILITY OF AREAS OUTSIDE THE WORK AREA. DEFINE AND
SECURE THE WORK AREA BY INSTALLATION OF A TEMPORARY
BARRIER FENCE.
5. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO DEFINE THE
GENERAL DESIGN AND SCOPE OF WORK REQUIRED TO COMPLETE
THE WORK AND REPRESENT A COMPLETE AND FUNCTIONAL SYSTEM.
INCLUDE ALL COMPONENTS, PARTS, ANCHORS AND OTHER
INCIDENTAL ITEMS WHICH ARE NORMALLY INCIDENTAL TO THE WORK.
THOSE COMPONENTS WHICH ARE NOT SHOWN ON THE DRAWING OR
SPECIFIED BUT WHICH ARE REQUIRED AS AN ESSENTIAL AESTHETIC,
FUNCTIONAL OR CODE REQUIRED ELEMENT OF THE WORK ARE TO BE
INCLUDED, WHETHER OR NOT SPECIFICALLY CALLED FOR IN THESE
PLANS OR SPECIFICATIONS.
6. EXISTING UTILITY LINES SHOWN IN THESE DRAWINGS ARE BASED ON
RECORDS OR FIELD OBSERVATION AND ARE FOR REFERENCE ONLY.
PRIOR TO CONSTRUCTION LOCATE ALL UTILITIES. ANY UTILITY
ADJUSTMENTS, EXISTING OR PROPOSED, REQUIRED TO COMPLETE
CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR.
TREAT ALL LINES AS ACTIVE. REPAIR ANY DAMAGES TO EXISTING
UTILITIES THAT ARE TO REMAIN IN SERVICE IMMEDIATELY AT NO
ADDITIONAL COSTS OR EXPENSE TO THE GOVERNMENT.
7. COORDINATE ACTIVITIES THROUGHOUT THE PROJECT IN A MANNER
THAT ALLOWS EMERGENCY ACCESS TO ALL EXISTING ROADWAYS AT
ALL TIMES WITHOUT DELAYS TO EMERGENCY VEHICLES RESPONSE
TIMES.
8. COORDINATE ALL CRANES COMING ON BASE WITH COE/BASE TO GET
FULL EXTENSION AND EXPECTED DURATION. SUPPLY INFORMATION
TO THE AIRFIELD A MINIMUM OF SIX (6) WEEKS PRIOR TO CRANE'S
ARRIVAL. CONTRACTOR MUST HAVE FAA TEMPORARY CRANE PERMIT
IN HAND PRIOR TO ANY CRANE ACTIVITY.
9. COORDINATE WITH THE BASE CONTRACTOR AND MS ONE CALL (811)
TO LOCATE ALL EXISTING UTILITIES. PRIOR TO EXCAVATION, VERIFY
THE DEPTH, SIZE, AND MATERIAL OF ALL BURIED UTILITIES BY HAND
DIGGING OR OTHER NON-DESTRUCTIVE EXCAVATION TECHNIQUES. .
10. BE ADVISED THAT CONTRACTOR'S WORK MAY BE SUSPENDED WHEN
LIGHTNING IS WITHIN FIVE (5) MILES. THE CONTRACTOR IS NOT
PERMITTED TO CLAIM MONETARY IMPACTS FOR TIME LOST DUE TO
LIGHTING WARNING WORK STOPPAGES.
11. GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES,
RULES, REGULATIONS AND PERMIT CONDITIONS BEARING ON THE
CONDUCT OF THE WORK AS DRAWN AND SPECIFIED.
12. DISPOSE OF MATERIALS IN ACCORDANCE WITH KEESLER AIR FORCE
BASE STANDARDS. COMPLY WITH KAFB RECYCLING STANDARDS FOR
RECYCLABLE MATERIALS.
13. SUBMIT A WEEKLY SCHEDULE OF ACTIVITIES TO THE COR. PROVIDE
DETAILS OF THE SPECIFIC WORK AREAS AND ANTICIPATED IMPACTS
TO SITE OPERATIONS INCLUDING BUT NOT LIMITED TO IMPACTS TO
PEDESTRIAN AND VEHICLE TRAFFIC, NOISE, VIBRATION AND
ACCESSIBILITY.
14. APPOINT A CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE
APPROVAL OF THE CONTRACTING OFFICER, WHO WILL BE PRESENT
ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS
WHILE JOB IS IN PROGRESS. DESIGNATE THE SUPERINTENDENT AS
THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE AND BE
AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S
REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE,
PROVIDE AN ALTERNATIVE REPRESENTATIVE.
15. SUBCONTRACT WITH SUPPLIERS AND FABRICATORS AND
INSTALLATION COMPANIES WHICH CAN DEMONSTRATE THAT THEY
POSSESS THE KNOWLEDGE, EXPERIENCE, AND PROVEN CAPABILITIES
TO FULLY PERFORM ALL ASPECTS OF THE WORK REQUIRED WITHOUT
OMISSION.
16. USE EXACT DIMENSIONS. DO NOT SCALE FROM THE DRAWINGS OR
WHERE DIMENSIONS ARE SHOWN WITH ± INDICATIONS. ADJUSTMENTS
MAY BE MADE TO SUIT FIELD CONDITIONS.
17. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE
INTENDED TO BE TYPICAL AND APPLY TO ANY SIMILAR SITUATION
ELSEWHERE IN THE PROJECT, EXCEPT WHERE A DIFFERENT DETAIL IS
SHOWN OR VARIATION NOTED.
18. AT ALL TIMES, USE ALL NORMALLY ACCEPTED AND REASONABLY
EXPECTED SAFETY PRACTICES AND COMPLY WITH ALL FEDERAL,
STATE AND LOCAL REGULATION, ORDINANCES, STANDARDS AND
GUIDELINES PERTAINING TO SAFE USE OF EQUIPMENT OR MATERIALS.
SPECIFICALLY ENSURE COMPLIANCE WITH, BUT NOT LIMITED TO,
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS AND USACE SAFETY MANUAL EM 385-1-1.
19. FOR ALL WORK PERFORMED UNDER THIS CONTRACT, AND ALL
EQUIPMENT, APPLIANCES, TOOLS, MATERIALS AND LIKE ITEMS USED
IN THE WORK, CONFORM TO APPLICABLE SAFETY CODES AND
REGULATIONS OF ANY PUBLIC OR OTHER AUTHORITY HAVING
JURISDICTION (AHJ). IN THE EVENT OF CONFLICTING REGULATIONS,
THE MORE STRINGENT INTERPRETATION OR REGULATION GOVERNS.
20. MAINTAIN AND SUBMIT WORKING AS-BUILT DRAWINGS AND FINAL
AS-BUILT DRAWINGS. MODIFY WORKING AS-BUILT DRAWINGS WEEKLY
OR MORE OFTEN AS NECESSARY TO CORRECTLY SHOW PROJECT
FEATURES AS DISCOVERED OR CONSTRUCTED BY BRINGING THE
CONTRACT SET INTO AGREEMENT WITH WORKING AS-BUILT PRINTS
AND ADDING SUCH ADDITIONAL DRAWINGS AS MAY BE NECESSARY.
WORKING AS-BUILT DRAWINGS MUST BE AVAILABLE FOR COR REVIEW
ON SAME DAY OF REQUEST AND BE SUBMITTED MONTHLY TO THE
CONTRACTING OFFICER FOR REVIEW/APPROVAL. FINAL AS-BUILT
DRAWINGS SUBMITTED ON COMPLETION OF THE WORK ARE TO
CONTAIN ALL INFORMATION CONTAINED ON WORKING AS-BUILT
DRAWINGS AT A MINIMUM.
21. LOCATE THE FEATURES OF WORK BY NORTHING AND EASTING
COORDINATES REFERENCED TO NAD83 AND BY ELEVATION
REFERENCED TO NAVD88. ALSO, FOR FEATURES THAT ARE NEAR AN
EXISTING STRUCTURE, LOCATE BY HORIZONTAL AND VERTICAL
MEASUREMENTS FROM THE EXISTING STRUCTURE. LOCATE ALL
UTILITY LINES AND APPURTENANCES IMMEDIATELY AFTER
INSTALLATION. RECORD AND CERTIFY ALL FINAL AS-BUILT DRAWINGS
BY A MISSISSIPPI LICENSED PROFESSIONAL LAND SURVEYOR AT THE
CONTRACTOR'S EXPENSE.
22. STRIP ALL AREAS OF OPEN CUT NEW CONSTRUCTION OF EXISTING
PLANT, TOPSOIL AND OTHER DELETERIOUS MATERIAL. HAUL ALL
UNSUITABLE MATERIAL TO A LOCATION WITHIN FIVE (5) MILES OF THE
WORK AREA AND DISPOSITION AS DEFINED BY THE COR.
23. COMPACT FILL, BACKFILL AND ANY DISTURBED SOIL TO A MINIMUM OF
95% OF THE MODIFIED PROCTOR MAXIMUM DRY DENSITY (ASTM
D1557) EXCEPT AS SPECIFIED IN THESE DRAWINGS AND/OR IN
SPECIFICATION SECTION 31 00 00.
24. SELECT FILL IS DEFINED AS MDOT SIZE 610 AGGREGATE OR
APPROVED EQUAL. SUBMIT PRODUCT DATA (GRADATION) AND MDOT
CERTIFICATION.
25. PROVIDE CAST IN PLACE CONCRETE IN ACCORDANCE WITH
SPECIFICATION SECTION 03 30 00. PROVIDE COMPRESSION
STRENGTHS AS NOTED IN THE SPECIFIC DETAILS.
26. REFER TO THE STATEMENT OF WORK AND SPECIFICATIONS FOR
REMOVAL, SALVAGE AND ABANDONMENT REQUIREMENTS.
27. PERFORM ALL NECESSARY SOIL AND COMPACTION TESTING TO
DETERMINE SOIL PROPERTIES AND NATURAL AND IMPROVED IN
PLACE CHARACTERISTICS BY AN APPROVED LAB. SUBMIT ALL
TESTING RESULTS.
28. DO NOT REMOVE OR DAMAGE ANY TREES NOT SPECIFICALLY
INDICATED. DO NOT DISTURB OR USE ANY AREA WITHIN THE DRIPLINE
OF TREES TO REMAIN. INSTALL CONSTRUCTION BARRIERS ALONG
THE DRIPLINE OF TREES. REPLACE TREES DAMAGED BY
CONSTRUCTION OPERATIONS WITH TREES OF EQUAL TYPE AND SIZE
AT CONTRACTOR’S OWN COST.
29. WHERE TREES ARE REMOVED, FULLY CLEAR AND GRUB THE AREA TO
REMOVE ALL STUMPS AND ROOTS TO PREVENT FUTURE
SETTLEMENT.
ABBREVIATIONS:
ACI AMERICAN CONCRETE INSTITUTE
APPROX APPROXIMATE
ASTM AMERICAN SOCIETY OF TESTING AND MATERIALS
BM BENCHMARK
KAFB KEESLER AIR FORCE BASE
CES CIVIL ENGINEERING SQUADRON
CIP CAST IN PLACE
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CRSI CONCRETE REINFORCEMENT STEEL INSTITUTE
ELEC ELECTRIC
ELEV ELEVATION
E.W. EACH WAY
FFE FINISHED FLOOR ELEVATION
FT FOOT/FEET
HDG HOT DIPPED GALVANIZED
HH HANDHOLE
HSS HOLLOW STRUCTURAL SECTION
LF LINEAR FEET
MDEQ MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL
QUALITY
MEG MATCH EXISTING GRADE
MES MITERED END SECTION
MH MANHOLE
MIN MINIMUM
NO NUMBER
OC ON CENTER
OPS OPERATIONS
PSI PER SQUARE INCH
RCP REINFORCED CONCRETE PIPE
SCH SCHEDULE
SSMH SANITARY MANHOLE
SWPPP STORMWATER POLLUTION PREVENTION PLAN
SQ SQUARE
SSX SANITARY SEWER PIPE
ST STREET
STD STANDARD
TOS TOP OF STRUCTURE
TYP TYPICAL
WWF WELDED WIRE FABRIC
GENERAL NOTES: SURVEY NOTES:
TYPICAL NOTE,
APPLICABLE TO ALL
OCCURENCES
SPECIFIC
NOTE
BURIED ELECTRICUGE UGE
1. KEESLER AIR FORCE BASE MAINTAINS A STANDING SMALL
CONSTRUCTION NOTICE OF INTENT (SCNOI) WITH MISSISSIPPI
DEPARTMENT OF ENVIRONMENTAL QUALITY (MDEQ). DISTURBANCES
LESS THAN FIVE (5) ACRES DO NOT REQUIRE ADDITIONAL SUBMITTALS
TO THE MDEQ. SUBMIT A STORM WATER POLLUTION PREVENTION
PLAN (SWPPP) FOR KAFB ENVIRONMENTAL APPROVAL. NO
CONSTRUCTION MAY COMMENCE IN ADVANCE OF KAFB APPROVAL OF
THE SWPPP IN WRITING.
2. MEET ALL EROSION AND SEDIMENT CONTROL REQUIREMENTS
CONTAINED IN THE SMALL CONSTRUCTION STORM WATER GENERAL
PERMIT, THE APPROVED SWPPP, AND AS DIRECTED BY THE COR. FOR
THE DURATION OF THE PROJECT, UPDATE AND MAINTAIN THE PERMIT
AND SWPPP AS REQUIRED TO REPRESENT THE FIELD CONDITIONS
AND STORMWATER MANAGEMENT PRACTICES.
3. PRIOR TO SOIL DISTURBING ACTIVITIES, INSTALL EROSION CONTROL
MEASURES. USE EROSION AND SEDIMENT CONTROL BEST
MANAGEMENT PRACTICES CONTAINED IN MISSISSIPPI DEPARTMENT
OF ENVIRONMENTAL QUALITY'S (MDEQ) MISSISSIPPI HANDBOOK FOR
EROSION CONTROL, SEDIMENT CONTROL AND STORMWATER
MANAGEMENT ON CONSTRUCTION SITES AND URBAN AREAS.
4. PROVIDE EROSION CONTROL DEVICES FOR ALL STAGING AND
MATERIAL STOCKPILES AREAS WHEN NECESSARY TO CONTROL
EROSION AND STORMWATER RUNOFF. CONSTRAIN STOCKPILED
MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT ITS
MOVEMENT BY WIND FORCES.
5. DUST CONTROL WILL BE STRICTLY ENFORCED. ACCESS TO WATER
SOURCES FOR FILLING OF WATER TRUCKS WILL BE PERMITTED.
COORDINATE FILLING OPERATIONS BY NOTIFYING VECTRUS SHOPS.
6. SCHEDULE OPERATION SUCH THAT THE AREA OF UNPROTECTED,
ERODIBLE EARTH EXPOSED AT ANY ONE TIME IS NOT LARGER THAN
THE MINIMUM AREA NECESSARY FOR EFFICIENT CONSTRUCTION
OPERATION AND MINIMIZE THE DURATION OF EXPOSURE TO THE
EXTENT POSSIBLE.
7. MAINTAIN THE EROSION CONTROL DEVICES THROUGHOUT THE
DURATION OF CONSTRUCTION OR UNTIL FINAL STABILIZATION IS
ESTABLISHED. PERFORM INSPECTIONS AFTER ALL RAINFALL EVENTS
AND COMPLETE PERIODIC MAINTENANCE AS REQUIRED TO ENSURE
MANAGEMENT PRACTICES FUNCTION PROPERLY. MAINTAIN WRITTEN
RECORDS OF ALL INSPECTIONS, REPAIRS, INCIDENTS AND
MODIFICATIONS AND MAKE AVAILABLE TO THE COR UPON REQUEST.
8. FINAL STABILIZATION FOR EACH STEP IN THE CONSTRUCTION
SEQUENCE MEANS THAT ALL SOIL DISTURBING ACTIVITIES AT THE
LOCATION HAVE BEEN COMPLETED, AND THAT A UNIFORM PERENNIAL
VEGETATIVE COVER WITH A DENSITY OF AT LEAST 70% FOR THE
AREA HAS BEEN ESTABLISHED OR EQUIVALENT MEASURES (I.E.,
CONCRETE OR ASPHALT PAVING, RIP RAP, ETC.) HAVE BEEN
EMPLOYED.
9. RESPOND TO ALL INQUIRIES RELATIVE TO COMPLIANCE OF EROSION
AND SEDIMENTATION CONTROL. MAINTENANCE OF FACILITIES TO
MAINTAIN COMPLIANCE IS AT THE CONTRACTOR'S OWN COST.
EROSION AND SEDIMENT CONTROL NOTES:
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
GENERAL NOTES (CONTINUED):
TYP
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED SPOT ELEVATION11.00
DRAINAGE FLOW ARROW
PROPOSED FENCE
R. HOYT
M. HORNE
M. HORNE
SECTION CUT WITH
SHEET REFERENCE
INLET SEDIMENT TRAP
SCALE:
EXISTING CONDITIONS
1" = 50'
D1.0
EXISTING CONDITIONS
KE
N
SI
N
G
TO
N D
R
IV
E
SAINT ANDREWS FAIRWAY
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
CONCORD ROAD
M
IN
DE
N
RO
AD BE
N
AV
ON
R
OA
D
EXISTING PAD MOUNT TRANSFORMER
50 KVA 240/120V SINGLE PHASE
TRANSFORMER #RMT1
EXISTING BUILDING, FUTURE
DEMO BY OTHERS
EXISTING CONCRETE
JERSEY BARRIER
GENERAL NOTES
1. EXISTING COMMERCIAL VEHICLE INSPECTION TENT AND CANOPY
ARE PLANNED FOR DEMOLITION PRIOR TO CONSTRUCTION OF THE
RV PARKING AREA.
2. EXISTING CONTOURS SHOWN ARE BASED ON U.S. GEOLOGICAL
SURVEY, USGS LIDAR POINT CLOUD PUBLISHED ON JANUARY 12, 2018
(LL84 COORDINATE SYSTEM, BASED ON THE WGS84 DATUM). POINT
CLOUD DATA HAS BEEN PROJECTED TO REFERENCE NAD83
MISSISSIPPI STATE PLANES, EAST ZONE, US FOOT. CONTRACTOR IS
RESPONSIBLE FOR PERFORMING OWN TOPOGRAPHIC SURVEY BY
MISSISSIPPI LICENSED PROFESSIONAL LAND SURVEYOR.
0 25 50 100
1"=50'
SCALE IN FEET
GRAPHIC SCALE
EXISTING ASPHALT ROAD WITH
CONCRETE CURB AND GUTTER
(TYP)
FUTURE RV PARKING AREA
EXISTING CANOPY OVER
ROADWAY, FUTURE DEMO
BY OTHERS
DE
VO
N W
AY
1" = 50'
DEVELOPMENT AREA
R. HOYT
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X
X
SCALE:
RV PARKING SITE DEMOLITION PLAN
1" = 20'
D1.1
RV PARKING SITE DEMOLITION
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
DEVELOPMENT/CONSTRUCTION AREA
GENERAL NOTES
1. LARGE TREES SHOWN WITH APPROXIMATE DRIP EDGES INDICATED.
POSITIVELY IDENTIFY, TAG, AND PRESERVE ALL OAK AND MAGNOLIA
TREES. REMOVE ALL OTHER TREES AND SHRUBS.
2. DEMOLISH BARRIERS AND CONCRETE CURB AND GUTTER AS
INDICATED. RESTORE CURBS IN ACCORDANCE WITH DETAILS.
3. EXISTING STORMWATER DRAINAGE SYSTEMS AND STRUCTURES TO
REMAIN. PRESERVE ALL DRAINAGE SYSTEMS AND PATHS UNLESS
NOTED OTHERWISE. CLEAN GUTTERS AND PIPES OF DEBRIS.
4. IN ALL AREAS TO RECEIVE GRAVEL, STRIP VEGETATION AND TOPSOIL
TO A MINIMUM DEPTH OF SIX (6) INCHES BELOW EXISTING GRADE.
PRESERVE AND STOCKPILE TOPSOIL FOR REUSE IN DISTURBED
AREAS TO BE RESTORED. REFER TO SHEET C1.0 FOR
MODIFICATIONS.
0 10 20 40
1"=20'
SCALE IN FEET
GRAPHIC SCALE
44' ± 43
8'
3'
DEMOLISH EXISTING
CONCRETE CURB
AND GUTTER
DEMOLISH EXISTING
CONCRETE CURB
AND GUTTER
BEN AVON ROAD
C O
N C
O R
D R
O
AD
SA
IN
T
AN
D R
EW
S
FA
IR
W
AY
DEVON WAY
EXISTING CONCRETE CURB
AND GUTTER TO REMAIN
EXISTING CONCRETE CURB
AND GUTTER TO REMAIN
DEMOLISH EXISTING
CONCRETE CURB
AND GUTTER
DEMOLISH EXISTING
CONCRETE CURB
AND GUTTER
STRIP VEGETATION
AND TOPSOIL
EXISTING CURB INLET
AND CATCH BASIN
EXISTING JERSEY
BARRIER TO REMAIN
DEMOLISH EXISTING
CONCRETE JERSEY
BARRIER
EXISTING CONCRETE CURB
AND GUTTER TO REMAIN (TYP)
DEAD TREE
REMOVE
SHRUB
REMOVE
DEAD TREE
REMOVE
DEAD TREE
REMOVE
PECAN TREE
REMOVE
OAK TREE
TO REMAIN
MAGNOLIA AND OAK
TREES TO REMAIN
OAK TREE
TRIM OVERHANGS
OAK TREE
TO REMAIN
EXISTING CURB INLET
AND CATCH BASIN EXISTING CURB INLET AND
CATCH BASIN. PROVIDE INLET
SEDIMENT TRAP, SEE DETAIL 2
ON SHEET C5.1
EXISTING CURB INLET AND
CATCH BASIN. PROVIDE INLET
SEDIMENT TRAP, SEE DETAIL 2
ON SHEET C5.1
R. HOYT
M. HORNE
M. HORNE
EXISTING CURB INLET AND
CATCH BASIN. PROVIDE INLET
SEDIMENT TRAP, SEE DETAIL 2
ON SHEET C5.1
3'
HH
HH
SCALE:
SITE MODIFICATION PLAN
1" = 20'
C1.0
SITE MODIFICATION PLAN
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
GENERAL NOTES
0 10 20 40
1"=20'
SCALE IN FEET
GRAPHIC SCALE
SPECIFIC NOTES
1. REFER TO C5.0 FOR DETAILS OF MODIFIED CURBS.
2. PARKING SPOTS SHOWN ARE APPROXIMATE TO SUPPORT LAYOUT. CONTRACTOR TO
SURVEY AND PROVIDE FINAL PARKING SPOT LAYOUT TO INCLUDE CONSIDERATIONS
FOR GRADE AND OBSTRUCTIONS.
3. PERIMETER FENCE AND GATE TO BE EIGHT (8) FEET HIGH. FENCE TO BE STEEL PANEL
WITH STEEL POSTS, PROVIDE FENCING SYSTEM WIND RATED IN ACCORDANCE WITH
ASCE 7-16 - 148 MPH WIND VELOCITY, RISK CATEGORY 1. PROVIDE STEEL FENCE IN
ACCORDANCE WITH DETAIL 7 ON SHEET C5.0.
4. PROVIDE AGGREGATE PARKING AREA CONSTRUCTED OF SELECT FILL (MDOT
GRADATION 610 CRUSHED STONE) WITH A MINIMUM THICKNESS OF SIX (6) INCHES.
PROVIDE STRUCTURAL SECTION TO INCLUDE COMPACTED STRUCTURAL FILL AND
GEOGRID STRUCTURAL LAYER OVER PREPARED SUBGRADE. REFER TO C5.0 FOR
SECTION.
5. AT EACH PARKING SPOT, INDICATE LIMITS OF PARKING SPOTS AND ASSIGN
NUMBERING FOR EACH SPOT. PROVIDE PERMANENT MARKING ON ADJACENT
FENCING OR WITH FREE-STANDING SIGNAGE AS DETAILED ON SHEET C5.0. PRIOR TO
NUMBERING, SUBMIT FINAL LAYOUT, NUMBERING SYSTEM, AND SIGNAGE FOR
APPROVAL.
6. PROVIDE 25 FEET TALL, TAPERED ALUMINUM LIGHT POST WITH CAST IN PLACE
CONCRETE BASE. REFER TO C1.1 FOR PRECISE LOCATIONS AND C5.0 FOR
FOUNDATION DETAILS. REFER TO E1.0 FOR CONDUCTOR AND LIGHTING
REQUIREMENTS.
8' HIGH STEEL
FENCE (TYP)
AGGREGATE
PARKING AREA
MODIFIED CONCRETE
CURB ALONG LENGTH
OF PARKING
CONCRETE TRANSITION
CURB AND RAMP
APPROXIMATE
PARKING SPOT (TYP)
8' HIGH STEEL
FENCE (TYP)
DOUBLE LEAF
SWINGING GATE
DOUBLE LEAF
SWINGING GATE
AGGREGATE
PARKING AREA
AGGREGATE
PARKING AREA
CONCRETE TRANSITION
CURB AND RAMP
MODIFIED CONCRETE
CURB ALONG LENGTH
OF PARKING
8' HIGH STEEL
FENCE (TYP)
1. TOTAL OF 75 SPACES REFERENCED BASED ON PLANNED LAYOUTS AND DIMENSIONS.
BASED ON CONTRACTOR'S SURVEY, MAXIMIZE SPACE UTILIZATION TO PROVIDE THE
MAXIMUM NUMBER OF SPACES POSSIBLE.
2. FENCE SHOWN AS AN OUTLINE AND LINETYPE. LOCATION OF FENCE POSTS ARE TO
BE DETERMINED BY THE CONTRACTOR BASED ON SELECTED FENCING SYSTEM.
REFER TO SHEET C5.0 FOR DETAILS OF FENCE AND GATE.
NOT COUNTED AS
A PARKING SPACE
NOT COUNTED AS
A PARKING SPACE
DOUBLE LEAF
SWINGING GATE
R. HOYT
M. HORNE
M. HORNE
BEN AVON ROAD
C O
N C
O R
D R
O
AD
SA
IN
T
AN
D R
EW
S
FA
IR
W
AY
DEVON WAY
TYP
TYP
TYP
TYP
TYP
TYP
TYP
R5'
HH
HH
N:333165.78, E:958907.38
N:333448.31, E:959103.37
N:333467.98, E:959117.17 N:333506.50, E:959143.73
N:333345.24, E:959351.09
N:333281.84, E:959307.11
N:333271.35, E:959307.81
N:333015.27, E:959130.17
N:333049.86, E:959154.17
N:333069.58, E:959167.85
N:333288.04, E:959311.46
N:333307.76, E:959325.13
N:333135.17, E:958954.94
N:333159.33, E:958971.30
N:333233.23, E:958965.13
N:333430.43, E:959101.92
N:333462.80, E:959126.37
N:333494.50, E:959151.02
N:333347.16, E:959340.47
N:333315.57, E:959315.94
N:333285.03, E:959289.62
N:333251.09, E:959290.10
N:333142.14, E:959216.96
N:333175.00, E:959239.76
N:333160.04, E:959191.14
N:333192.91, E:959213.94
N:333079.47, E:959173.49
N:333051.64, E:959149.58
N:333018.52, E:959127.15
N:333142.70, E:959081.04
N:333164.89, E:959096.43
N:333185.76, E:959092.66
N:333204.48, E:959065.67
N:333200.71, E:959044.80
N:333201.89, E:959010.32
N:333177.88, E:959028.96
N:333191.56, E:959009.24N:333189.05, E:958995.33
N:333163.97, E:959031.48
N:333410.98, E:959149.30
N:333384.44, E:959183.63
N:333382.14, E:959171.54
N:333396.23, E:959151.22
N:333369.17, E:959168.63
N:333376.12, E:959167.37
N:333155.29, E:958996.55
N:333215.88, E:959184.33
N:333261.48, E:959118.60
N:333249.81, E:958962.72
N:333310.51, E:959004.17
N:333370.97, E:959045.56
N:333428.13, E:959086.14
N:333407.96, E:959145.95
N:333486.52, E:959170.24
N:333422.63, E:959253.97
N:333351.15, E:959207.57
N:333309.66, E:959265.45
N:333370.46, E:959322.32
N:333238.65, E:959288.33
N:333184.45, E:959251.29
N:333132.67, E:959215.30
N:333082.31, E:959180.30
N:333131.51, E:959087.64
N:333200.23, E:958997.41
N:333083.89, E:959025.14
N:333129.27, E:958957.76
N:333040.87, E:959088.51
0'
SCALE:
GEOMETRY PLAN
1" = 20'
C1.1
GEOMETRY PLAN
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
GENERAL NOTES
0 10 20 40
1"=20'
SCALE IN FEET
GRAPHIC SCALE
1. DIMENSIONS ARE BASED ON BEST AVAILABLE INFORMATION AT TIME
OF DESIGN. BASED ON CONTRACTOR'S SURVEY, MAXIMIZE SPACE
UTILIZATION TO PROVIDE THE MAXIMUM NUMBER OF SPACES
POSSIBLE.
2. PROVIDE PARKING SPOTS A MINIMUM OF 16 FEET WIDE BY 40 FEET
LONG. AT A MINIMUM INCLUDE AT LEAST 20 PERCENT OF SPOTS AT 50
FEET LONG.
3. MAXIMIZE THE WIDTH OF DRIVING LANES AND PROVIDE TURN RADII TO
SUPPORT BACKING OF TRAILERS AND LARGE VEHICLES.
8'
40'
10.3'
29.2'
R37.9'
1.0'
4.
4' 10.6'24' 1.
0'
77' 40' 91.3'
33.9'
235'
10.5' 7.5' 24' 9.8'
39.8' 45.6'
5'
2.
7'
12.8'
46.8'24'343.9'
.5
40'
5'
9'9'
.8
2'
10'
42.8' 37' 40' 40' 37' 40'
8.
4'
240'
9.2'
.4
.7
7.
4'
R5.1'R15'
R15'
R15'
R15'
46.4'
R. HOYT
HH
15 14
17 16 15 14
SCALE:
GRADING PLAN
1" = 20'
C1.2
RV PARKING GRADING PLAN
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
GENERAL NOTES
0 10 20 40
1"=20'
SCALE IN FEET
GRAPHIC SCALE
SPECIFIC NOTES #
1. INSTALL APPROXIMATELY 8,250 SF OF MDOT #610 CRUSHED LIMESTONE TO
A DEPTH OF SIX (6) INCHES ON GEOGRID FABRIC, REFERENCE DETAIL 1 ON
SHEET C5.0.
2. INSTALL APPROXIMATELY 57,000 SF OF MDOT #610 CRUSHED LIMESTONE
TO A DEPTH OF SIX (6) INCHES ON GEOGRID FABRIC, REFERENCE DETAIL 1
ON SHEET C5.0.
3. INSTALL APPROXIMATELY 9,620 SF OF MDOT #610 CRUSHED LIMESTONE TO
A DEPTH OF SIX (6) INCHES ON GEOGRID FABRIC, REFERENCE DETAIL 1 ON
SHEET C5.0.
4. INSTALL APPROXIMATELY 340 SF CONCRETE DRIVEWAY APRON,
REFERENCE DETAIL 2 ON SHEET C5.0.
5. INSTALL APPROXIMATELY 340 SF CONCRETE DRIVEWAY APRON,
REFERENCE DETAIL 2 ON SHEET C5.0
6. INSTALL 210 LF OF CONCRETE FLAT RIBBON CURB, REFERENCE DETAIL 7 ON
SHEET C5.0.
7. INSTALL 240 LF OF CONCRETE FLAT RIBBON CURB, REFERENCE DETAIL 7 ON
SHEET C5.0.
8. GRADE RV STORAGE AREA TO PROVIDE POSITIVE DRAINAGE FLOW AS
REFERENCED BY FLOW ARROWS.
1. ALL SURFACES TO BE GRADED TO DRAIN POSITIVELY IN THE DIRECTION
SHOWN BY THE FLOW ARROWS ON THE PLANS AND TO PROVIDE A
SMOOTHLY TRANSITIONED DRIVING SURFACE FOR VEHICLES WITH NO
SHARP BREAKS IN GRADE OR NO UNUSUALLY STEEP OR REVERSE CROSS
SLOPES.
2. FIELD VERIFY ALL EXISTING PAVEMENT GRADES AND ELEVATIONS PRIOR
TO BEGINNING WORK.
3. PROOF ROLL DRIVEWAY APRON AREAS AND RV PARKING AREAS. NOTIFY
THE ENGINEER OF ANY SOFT OR UNACCEPTABLE AREAS.
4. EDGE OF NEW DRIVEWAY APRONS TO BE FLUSH WITH EXISTING PAVEMENT.
5. ALL CUT OR FILL SLOPES WILL BE 3:1 OR FLATTER UNLESS OTHERWISE
NOTED.
6. EXISTING AND PROPOSED GRADE CONTOURS ARE SHOWN AT ONE (1) FOOT
INTERVALS.
7. ADJUST SAWCUT LOCATION OF EXISTING PAVEMENT EDGE AS NECESSARY
TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE.
8. ENSURE NEW GRAVEL RV STORAGE AREAS ARE VOID OF ANY
DEPRESSIONS WHERE WATER CAN POOL.
9. SITE BOUNDARY, TOPOGRAPHY, UTILITY AND ROAD INFORMATION TAKEN
FROM CONTOURS CREATED FROM LIDAR. LIDAR DATA WAS COMPLETED BY
USGS, DATED APRIL 4, 2015.
10. VERIFY EXISTING PAVEMENT GRADES WHERE MODIFICATIONS/DRIVEWAY
CONNECTIONS ARE BEING MADE. IF THERE IS SIGNIFICANT DEVIATION
FROM THE EXISTING GRADES SHOWN HEREON, CONTACT ENGINEER OF
RECORD FOR DIRECTION.
11. RESTORE ALL UNSURFACED, DISTURBED AREAS BY PLACEMENT OF A
MINIMUM OF FOUR (4) INCHES OF TOPSOIL AND CENTIPEDE SOD.
12. FLUSH ALL EXISTING TO REMAIN STORMWATER CULVERTS AND VERIFY ALL
CULVERTS ARE FREE OF DIRT AND DEBRIS. ENSURE ALL DISCHARGE
SEDIMENT IS CAPTURED AND DOES NOT DISCHARGE OFFSITE.
TYP
C4.0
C4.0
C4.0
R. HOYT
M. HORNE
M. HORNE
BEN AVON ROAD
C O
N C
O R
D R
O
AD
SA
IN
T
AN
D R
EW
S
FA
IR
W
AY
DEVON WAY
C4.0
SECTIONS AND ELEVATIONS
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
SCALE:
SECTION
1" = 10'
C1.2
1.0' 24'±
5:1 SOD (MAX. 3:1)
ELEV. 14.0±
ELEV. 9.00±
DEVON WAYRV GRAVEL
PARKING AREA
SCALE:
SECTION
1" = 10'
C1.2
2%
ELEV. 10.0±
MATCH EXIST.
ELEV. 13.00±
SAINT ANDREWS
FAIRWAY
ELEV. 10.5±
MATCH EXIST.
ELEV. 10.20±
PROPOSED
SECURITY FENCE
3'
RV GRAVEL
PARKING AREA
VARIES
(15' MAX)
25±
PROPOSED
SECURITY FENCE
40.0'±
4:1 SOD
FLAT RIBBON
CURB
SCALE:
SECTION
1" = 10'
C1.2
4:1 SOD
ELEV. 14.25±
ELEV. 14.40±
CONCORD
ROAD
RV GRAVEL
PARKING AREA
PROPOSED
SECURITY FENCE
MIN 1%
FLAT RIBBON
CURB
17' MAX. 3' 40'±
ELEV. 13.85±
ELEV. 18.0±
1'
2'
R. HOYT
1/2"
4000 PSI CONCRETE FOOTING
CAST IN SONOTUBE FORM
#3 REBAR TIELIGHT POLE BASE
FOOTPRINT, VARIES
2'
3" CLEAR
25' ROUND TAPERED ALUMINUM LIGHT
POLE, 4-BOLT BASE, DARK BRONZE
POWDER COAT. MODEL RTA25 BY
HAPCO, OR APPROVED EQUAL. WALL
THICKNESS AND BUTT DIAMETER
VARY W/NUMBER OF FIXTURES
3'
7'-6"
24"Ø 4000 PSI CIP CONCRETE
LIGHT POLE FOUNDATION, CAST
IN SONOTUBE FORM. REMOVE
FORM ABOVE GRADE.
#5 VERTICAL (TYP)
#3 STIRRUP @ 10-7/8" OC,
BELOW GRADE (TYP)
SLOPE TOP TO DRAIN AND
CHAMFER EXPOSED CORNERS
CIP ANCHOR BOLTS, PER
MANUFACTURER REQUIREMENTS
FOR WIND LOADS
#3 STIRRUP @ 6" OC,
ABOVE GRADE
4"
2"
FINISHED GRADE
GRAVEL SURFACE COURSE
3" CLEAR (TYP)
5-#5 VERT EQUALLY
SPACED W/ #3 TIES
NOTES::
1. PROVIDE PERIMETER FENCING CONSTRUCTED OF GALVANIZED STEEL, EXCEPT WHERE NOTED. FENCE CONSTRUCTION IS TO CONSIST OF STEEL PICKETS, INSTALLED IN A SHADOW-BOX DESIGN WITH ALTERNATING PICKETS ON EACH SIDE OF THE CENTRAL MOUNTING STRUTS. COAT FENCING PANELS AND POSTS TO MATCH KAFB STANDARD COLORS USING USING ORGANIC FLUOROPOLYMER. BASIS OF DESIGN IS BASTEEL
CAMBRIDGE COATED WITH "CANYON BROWN" TOP COAT.
2. PROVIDE FENCING SYSTEM RATED FOR WIND LOADS IN ACCORDANCE WITH ASCE 7-16, RISK CATEGORY 1, EXPOSURE CLASS C FOR KAFB. FOUNDATION DETAILS ARE PROVIDED BUT ARE BASED ON THE DESIGN BASIS
PRODUCT. VERIFY FOUNDATIONS ARE APPLICABLE FOR THE INSTALLED FENCE PRODUCT.
3. PROVIDE ALL STAINLESS STEEL HARDWARE.
1 1 /4" 5"
TOP VIEW
FRONT VIEW
PICKET LAYOUTPICKET
.017" THICK
80,000 PSI
8.85"
8' 1 1/2" TYP.
8'
FINISHED
GRADE
SQUARE STEEL
POST (TYP)
8" TYPICAL GRADE GAP
REFER TO FOUNDATION
DETAILS FOR MOUNTING
TOP VIEW
FRONT VIEW
GATE OPENING
CANE ROD STAINLESS STEEL
SLIDE BOLT HATCH
HINGE FRONT VIEW
HINGE TOP VIEW
8'
STEEL TUBE
FRAME (TYP)
SS CANE
BOLTS
INFILL TO MATCH
FENCE PANEL
GATE FRAME
GATE HINGE, WELDED
TO GATE FRAME
HINGE STRAP
BEARING HINGE
HINGE YOKE, WELDED
TO HINGE STRAP
SQUARE POST
GATE FRAME
HOLE FOR PADLOCK
GATE FRAME
SS ROD KEEPER
SS CANE GUIDE
W/ NYLON BUSHING
1"Ø SS CANE
ROD
NOTES:
1. PROVIDE PERIMETER DOUBLE SWING ACCESS GATES CONSTRUCTED OF GALVANIZED STEEL, EXCEPT WHERE NOTED. MATCH GATE PANELS TO FENCING. COAT GATES AND POSTS TO MATCH KAFB STANDARD COLORS USING USING ORGANIC FLUOROPOLYMER. BASIS OF DESIGN IS BASTEEL CAMBRIDGE COATED WITH "CANYON
BROWN" TOP COAT.
2. SIZE GATES AND SUPPORT POSTS FOR THE OPENINGS AS NOTED ON THE PLANS. PROVIDE FENCING SYSTEM RATED FOR WIND LOADS IN ACCORDANCE WITH ASCE 7-16, RISK CATEGORY 1, EXPOSURE CLASS C FOR KAFB.
FOUNDATION DETAILS ARE PROVIDED BUT ARE BASED ON THE DESIGN BASIS PRODUCT. VERIFY
FOUNDATIONS ARE APPLICABLE FOR THE INSTALLED FENCE PRODUCT.
3. PROVIDE ALL STAINLESS STEEL HARDWARE.
1"Ø SS
SLIDE
BOLT
SLIDE BOLTSHADOW BOX, GALVANIZED
AND COATED STEEL FENCE
PANEL. CAMBRIDGE BY
BASTEEL, OR APPROVED
EQUAL.
15 16
2.5" TALL CHARACTERS
"ARIAL" FONT, WHITE
REFLECTIVE
1/2" WHITE REFLECTIVE
BORDER
KAFB STANDARD MEDIUM
BROWN FIELD
3/8"Ø MOUNTING HOLES
FOR 1/4" SS BOLTS (2)
10"
6"
0.063"T REFLECTIVE
ALUMINUM
SIGNAGE NOTES:
1. INSTALL SIGNS SUCH THAT DIVIDING LINE INDICATES LIMITS OF PARKING AREA
FOR EACH LOCATION. EACH PARKING SPOT SHOULD HAVE MATCHING NUMBERS
ON THE LEFT AND RIGHT EXTENTS TO CLEARLY INDICATE LIMITS.
2. MOUNT SIGNS TO ADJACENT FENCE OR ON FREESTANDING U-CHANNEL
GALVANIZED SIGN POST. ATTACH SIGNS TO FENCE OR POSTS BY 1/4" SS
HARDWARE. EMBED POSTS 18" MINIMUM, DIRECT BURY.
3. ASSIGN PARKING SPOT NUMBERING. SUBMIT SHOP DRAWING OF PARKING LOT
NUMBERING LAYOUT AND SIGN TEMPLATE FOR APPROVAL PRIOR TO ORDERING
NUMBERED SIGNAGE.
4. INSTALL SIGNS AT A HEIGHT OF FOUR (4) FEET ABOVE GRADE FOR VISIBILITY.
5. DESIGN SIGNAGE TO MEET KEESLER AIR FORCE BASE (KAFB) INSTALLATION
FACILITIES STANDARDS (IFS)
4000 PSI CONCRETE FOOTING
CAST IN SONOTUBE FORM
#3 REBAR TIEFENCE POST,
EMBEDDED
2'
3" CLEAR
8'-3"
24"Ø 4000 PSI CIP CONCRETE
LIGHT POLE FOUNDATION,
CAST IN SONOTUBE FORM.
#5 VERTICAL (TYP)
#3 STIRRUP @ 12"
OC (TYP)
8' SQUARE, STEEL FENCE POST, PER
MANUFACTURER. EMBEDDED IN
POLE FOUNDATION.
FINISHED GRADE
3" CLEAR (TYP)
5-#5 VERT EQUALLY
SPACED W/ #3 TIES
C5.0
CIVIL DETAILS I
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
95% COMPACTED
SUB-GRADENOTES:
1. INSTALL GEOGRID IN THE AREAS NOTED TO CREATE AN UNPAVED
STRUCTURAL SECTION. PLACE INTERAXIAL NX850 GEOGRID AS
MANUFACTURED BY TENSAR, OR APPROVED EQUAL, ON PREPARED
SUBGRADE, BENEATH A MINIMUM OF SIX (6) INCH THICK SECTION OF
MDOT #610 CRUSHED STONE.
2. TERMINATE #610 STONE AREA BY TAPERING EDGES TO MATCH
GRADE PROFILE.
#610 STONE
18"
18"
2"CL
1/2" EXPANSION JOINT
AND PREFORMED JOINT
FILLER
JOINT SEAL
PAVEMENT
SLOPE VARIES
GRADE
CONCRETE 4000 PSI AT 28
DAYS PER SPECIFICATIONS
BROOM FINISH
CLEAN AND GRADE SUBGRADE
COMPACT TO 98% STANDARD
PROCTOR MAX DRY DENSITY
6" x 6" W4 x W4 WWF
TOP AND BOTTOM (TYP)
CAST IN PLACE
CONCRETE
ELASTOMETRIC
JOINT SEAL 1
4"R PRECAST
CONCRETE
2" PREMOLDED EXPANSION JOINT
MATERIAL PER SPECIFICATIONS
SCALE:
TYPICAL UNPAVED ROADWAY SECTION
N.T.S.
C1.2
SCALE:
CONCRETE REINFORCEMENT DETAIL (TYP)
N.T.S.
C1.2
SCALE:
FLAT RIBBON CURB
N.T.S.
C1.2SCALE:
EXPANSION JOINT DETAIL
N.T.S.
C1.2
GEOGRID
FABRIC
6" M
IN
SCALE:
LIGHT POLE BASE
N.T.S.
C1.0
R. HOYT
M. HORNE
M. HORNESCALE:
FENCE AND GATE ACCESS DETAILS
N.T.S.
C1.0
NOTE:
FOR USE ADJACENT TO CONCRETE OR FLEXIBLE PAVEMENT.
EXPANSION JOINT, PREFORMED JOINT FILLER, AND JOINT SEAL ARE
REQUIRED BETWEEN CURBS AND CONCRETE PAVEMENT ONLY.
CONCRETE 4000 PSI MIN
COMPRESSIVE STRENGTH
@ 28 DAYS
SCALE:
PARKING SIGNAGE DETAIL
N.T.S.
C1.2
SCALE:
FENCE POLE BASE
N.T.S.
C1.0
C5.1
CIVIL DETAILS II
EROSION CONTROL NOTES:
1. INSPECT SILT FENCE AFTER EACH STORM EVENT. REMOVE AND WASHOUT SEDIMENT DEPOSITS. REPAIR
STRUCTURAL FAILURE IMMEDIATELY.
2. ATTACH TWO SILT FENCES BY PLACING THE END OF THE SECOND FENCE INSIDE THE END POST OF THE FIRST FENCE. ROTATE BOTH POSTS 180 DEGREES IN A CLOCKWISE DIRECTION TO CREATE A TIGHT SEAL
WITH FABRIC MATERIAL. DRIVE BOTH POSTS 18 INCHES INTO THE GROUND AND BURY FLAP.
2. REMOVE SILT FENCES ONLY AFTER DISTURBED AREAS HAVE BEEN STABILIZED.
STAKES
FILTERED WATER
BURLAP FABRIC
RUNOFF WITH SEDIMENT
BURIED BURLAP FABRIC
WOOD POST AT
10' O.C. MIN 1"X2"X3"
GEOTEXTILE SILT
SCREEN STAPLE TO POST
TRENCH MIN 4 INCH X 4 INCH BURY
MIN 8" OF FABRIC IN TRENCH
SILT FLOW
SECTION ELEVATION
FILTER
FABRIC
SCALE:--
TYPICAL SILT FENCE DETAIL
N.T.S.
SCALE:--
CATCH BASIN INLET SEDIMENT TRAP DETAIL
N.T.S.
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
R. HOYT
E0.0
ELECTRICAL NOTES
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
GENERAL NOTES:
1. ALL ELECTRICAL CONSTRUCTION/INSTALLATION MUST BE IN ACCORDANCE WITH ALL CODES AND
STANDARDS LISTED ON THIS SHEET.
2. ALL CONSTRUCTION WILL BE GOVERNED BY THE PLANS, SPECIFICATIONS, AND ALL APPLICABLE
BUILDING AND SAFETY CODES, LAWS, AND ORDINANCES.
3. CONTRACTOR MUST BE FAMILIAR WITH THE SITE, THE WORK REQUIRED, THE CUSTOMER'S WORK
PROCEDURES, AND ALL OTHER CONDITIONS THAT MAY AFFECT THE SUCCESSFUL COMPLETION
OF THE JOB PRIOR TO COMMENCEMENT OF WORK.
4. FIELD LOCATE ALL EXISTING UTILITIES AS TO LOCATION AND ELEVATION. NOTIFY THE
CONTRACTING OFFICER OF ANY AND ALL CONFLICTS PRIOR TO BEGINNING CONSTRUCTION.
5. ALL SPECIFIC MATERIALS AND PRODUCTS IDENTIFIED IN THE PLANS ARE INCLUDED AS THE BASIS
OF DESIGN. CONTRACTOR MAY SUBMIT EQUIVALENT PRODUCTS IN COMPLIANCE WITH THE
PROJECT SPECIFICATIONS FOR APPROVAL INSTEAD OF THOSE SPECIFIED.
6. LOCATIONS OF ALL ELECTRICAL EQUIPMENT ARE APPROXIMATE AND MAY BE RELOCATED TO AN
APPROVED LOCATION. FIELD VERIFY ALL LOCATIONS AND SPACING. CONTACT CONTRACTING
OFFICER PRIOR TO ANY FIELD CHANGES.
7. ALL NEW EXTERIOR ABOVE GROUND CONDUIT MUST BE RGS UNLESS OTHERWISE NOTED. ALL
NEW UNDERGROUND CONDUIT MUST BE SCHEDULE 40 PVC. TRANSITIONS FROM UNDERGROUND
CONDUIT TO ABOVE GROUND CONDUIT MUST BE MADE USING PVC TO RGS TRANSITION ELBOWS.
ALL RGS WITHIN 6-INCHES OF FINISHED GRADE OR BURIED MUST BE PVC COATED OR
PROTECTED FROM CORROSION USING BITUMINOUS TAPE OR OTHER APPROVED METHOD.
8. ALL NEW ELECTRICAL CONDUCTORS INSTALLED MUST BE COPPER, INSULATION TYPE
THHN-THWN-2 UNLESS OTHERWISE NOTED.
9. ENSURE ALL NEW/MODIFIED PANELBOARDS RECEIVE NEW, TYPED PANEL SCHEDULES
REFLECTING AS-BUILT CONDITIONS. INSTALL PANEL SCHEDULES ON THE INSIDE OF THE PANEL
DOOR OR IN A SIMILAR CONSPICUOUS LOCATION.
10. CONSTRUCTION ACTIVITIES AND PLANNED OUTAGES MUST BE COORDINATED WITH THE
CONTRACTING OFFICER TO MINIMIZE IMPACT TO OPERATIONS.
NEW UNDERGROUND LOW VOLTAGE FEEDER
NEW PANELBOARD - SEE PANEL SCHEDULES FOR
SPECIFIC INFORMATION
TRANSFORMER, SIZE AND RATING AS INDICATED
CIRCUIT BREAKER, X-POLE, NUMBER INDICATES TRIP
RATING WHERE APPLICABLE
NEW LIGHT POLE WITH NEW LIGHT FIXTURE(S)
(P#X - P IS POLE, # IS POLE NUMBER, X IS LIGHTING
CIRCUIT A OR B)
LEGEND:
A AMPERE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AG ABOVE GROUND
AHJ AUTHORITY HAVING JURISDICTION
APPROX APPROXIMATELY
AWG AMERICAN WIRE GAUGE
BLDG BUILDING
CB CIRCUIT BREAKER
CBL CABLE
CKT CIRCUIT
CNTL CONTROL
COMM COMMUNICATIONS
CU COPPER
DC DIRECT CURRENT
DEG DEGREE
DIA DIAMETER
DP DISTRIBUTION PANEL
D/S DISCONNECT SWITCH
EPR ETHYLENE-PROPYLENE RUBBER
ETR EXISTING TO REMAIN
FC FOOT CANDLE
GND GROUND
GOVT GOVERNMENT
HDD HORIZONTAL DIRECTIONAL DRILLING
HH HANDHOLE
HZ HERTZ
JBOX JUNCTION BOX
KAIC THOUSAND AMPS INTERRUPTING CURRENT
KCMIL THOUSAND CIRCULAR MILLS
KV KILOVOLT
KVA KILOVOLT AMPERE
KW KILOWATT
LED LIGHT-EMITTING DIODE
LP LIGHTING POLE
LTG LIGHTS
MCB MAIN CIRCUIT BREAKER
MDP MAIN DISTRIBUTION PANEL
MH MANHOLE
MLO MAIN LUG ONLY
N NEUTRAL
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
OBS OBSTRUCTION
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
P POLE
PH PHASE
PNL PANEL
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RGS RIGID GALVANIZED STEEL
SCH SCHEDULE
SEC SECTION
SST STAINLESS STEEL
THHN THERMOPLASTIC HIGH HEAT RESISTANT NYLON
THWN-2 THERMOPLASTIC HEAT AND WATER RESISTANT NYLON
TYP TYPICAL
UL UNDERWRITER'S LABORATORIES
UNV UNIVERSAL
V VOLT
VAC VOLTS ALTERNATING CURRENT
VDC VOLTS DIRECT CURRENT
W WATT
XFMR TRANSFORMER
GENERAL NOTES - DEMOLITION
1. DE-ENERGIZE ALL ITEMS TO BE DEMOLISHED OR REMOVED. PERFORM LOCKOUT/TAGOUT IN
ACCORDANCE WITH OSHA 29 CFR 1910.147 AND NFPA 70E.
2. CONTRACTOR MUST TAKE NECESSARY PRECAUTIONS AND PROVIDE PROTECTION AS REQUIRED
TO PRESERVE CONDITION OF EXISTING UTILITIES, EQUIPMENT, FURNISHING, AND SURFACES
NOT INDICATED FOR REMOVAL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO WORK AROUND
THE EXISTING CONDITIONS TO ACCOMPLISH THE WORK.
3. COVER ALL OPENINGS OR PENETRATIONS IN ELECTRICAL ENCLOSURES RESULTING FROM
DEMOLITION ACTIVITIES WITH METAL PLUGS MANUFACTURED FOR THE PURPOSE.
4. PROVIDE NYLON PULL STRINGS IN ALL EMPTY CONDUITS RESULTING FROM DEMOLITION.
PAD MOUNTED TRANSFORMER
ABBREVIATIONS:
29 CFR 1926/1910 OSHA STANDARDS FOR CONSTRUCTION
NFPA 70 NATIONAL ELECTRICAL CODE, 2020
NFPA 70E STANDARDS FOR ELECTRICAL SAFETY, 2021
NFPA 780 STANDARD FOR THE INSTALLATION OF LIGHTNING
PROTECTION SYSTEMS, 2020
UFC 3-501-01 UNIFIED FACILITIES CRITERIA, ELECTRICAL ENGINEERING
WITH CHANGE 1, 2019
UFC 3-530-01 INTERIOR AND EXTERIOR LIGHTING SYSTEMS AND CONTROLS
WITH CHANGE 4, 2019
UFC 3-550-01 EXTERIOR ELECTRICAL POWER DISTRIBUTION,
WITH CHANGE 3, 2019
CODES AND STANDARDS:
EQUIPMENT LABELING:
1. PROVIDE NEW MELAMINE PLASTIC LABELS ON NEW ELECTRICAL EQUIPMENT IN THIS PROJECT AS
SHOWN BELOW.
2. LABELS MUST BE PROVIDED WITH A BLACK BACKGROUND AND WHITE LETTERS.
3. LABELS MUST BE AFFIXED TO EQUIPMENT VIA SCREWS.
PANEL A
240/120VAC
FED FROM
XFMR RMT-1
XFMR
B. KOLAK
W. JENISON
W. JENISON
HANDHOLEHH
LIGHTING SCHEDULE
SYMBOL QTY POLE MFR PART # LAMPS LLF WATTS NOTES
16 RTA25 HUBBELL LIGHTING AR2-54L-560-3K7-5W 9560 0.85 88.73 CAPABLE OF REDUCING POWER BY A MINIMUM OF 30% PER UFC-3-530-01 12 RTA25 HUBBELL LIGHTING AR2-54L-560-3K7-3 9901 0.85 88.73 CAPABLE OF REDUCING POWER BY A MINIMUM OF 30% PER UFC-3-530-01
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UG
E
UG
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
U G
E U
G E
U G
E
UGEUGEUGE
U G
E U
G E
U G
E
HH
HH
HH
SCALE:
ELECTRICAL POWER PLAN
1" = 20'
E1.0
ELECTRICAL POWER PLAN
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
0 10 20 40
1"=20'
SCALE IN FEET
GRAPHIC SCALE
3 3
X2
X2
X2
X2
X2
X2
X2
2 GENERAL NOTES
SPECIFIC NOTES #
1. INSTALL NEW 100A MCB, 240/120V, 1PH, SERVICE ENTRANCE RATED, 3W, 10
KAIC, NEMA 4X SST, SURFACE MOUNTED PANELBOARD "A" ONTO NEW
STRUCTURAL FRAME. RUN 4/0 AWG BARE COPPER FROM PANEL GROUND
BUS TO TWO NEW GROUND RODS. SEE SHEET E5.0 FOR DETAILS.
2. RUN APPROXIMATELY 200 FEET OF NEW UNDERGROUND ELECTRIC FEED
FROM XFMR-RMT1 TO NEW PANEL A. SEE SINGLE-LINE DIAGRAM ON SHEET
E6.0 FOR DETAILS.
3. INSTALL SIXTEEN (16) TOTAL AR2-54L-560-3K7-5W OR APPROVED EQUAL
LIGHT FIXTURES. ORIENT IN THE DIRECTION AS SHOWN. SEE SHEET E5.0
FOR MOUNTING AND CONNECTION DETAILS.
4. INSTALL TWELVE (12) TOTAL AR2-54L-560-3K7-3 OR APPROVED EQUAL
LIGHT FIXTURES. ORIENT IN THE DIRECTION AS SHOWN. SEE SHEET E5.0
FOR MOUNTING AND CONNECTION DETAILS.
5. INSTALL ONE (1) 240VAC, 4-POLE, LIGHTING CONTACTOR AND ONE (1)
PHOTOSENSOR IN A NEMA 4X SST ENCLOSURE
1. REFER TO SINGLE-LINE DIAGRAM AND PANEL SCHEDULE ON SHEET E6.0
FOR CONFIGURATION, CIRCUIT BREAKER, CONDUCTOR AND CONDUIT
INFORMATION.
2. REFER TO LIGHTING SCHEDULE ON SHEET E0.0 FOR LIGHT FIXTURE AND
POLE INFORMATION.
3. VERIFY NEUTRAL/GROUND BOND AT XFMR-RMT1.
4. AT EACH POLE, INSTALL OCCUPANCY SENSOR SCH-R OR APPROVED EQUAL,
CAPABLE OF DIMMING LIGHTS. REFER TO SPECIFICATION 26 50 00 FOR
DETAILED LIGHTING CONTROL REQUIREMENTS.
5. REFER TO SHEET E5.0 FOR UNDERGROUND CONDUIT TRENCHING DETAILS
P1A
P2A
P3A P4A P5A
P6A
P7A
P8A
P9A
P10A
P11A
P1B
P2B
P3B
P4B
P5B
P6B P7B
P8B
P10B
P9B
B. KOLAK
W. JENISON
W. JENISON
PANEL A
LIGHTING
CONTROL
PANEL
2.0
1.5
1.3
2.9
2.4
2.0
1.7
1.2
1.9
2.4
2.6
2.3
1.7
1.7
1.4
2.4
2.5
2.8
2.3
1.7
1.3
1.5
1.9
2.2
2.0
3.0
3.0
2.9
2.6
2.0
1.4
1.1
1.3
2.0
2.7
2.4
1.9
2.2
2.6
2.7
2.4
1.5
2.0
1.7
1.2
1.1
1.7
2.4
2.4
1.9
2.1
2.2
2.3
2.0
1.9
2.0
2.3
2.3
2.0
1.4
1.0
1.1
2.0
2.7
2.7
2.3
2.6
2.3
2.2
1.6
1.4
1.4
1.8
2.1
2.3
1.9
1.3
0.9
0.8
1.4
2.3
3.1
3.1
0.9
1.5
2.3
2.5
2.2
1.8
1.3
1.1
1.8
1.5
1.2
0.8
0.7
1.0
2.2
2.9
0.5
1.0
1.7
2.2
1.5
1.9
1.7
1.5
1.1
0.6
0.8
0.8
1.1
1.7
1.0
1.6
2.1
2.2
1.3
2.1
1.9
1.4
0.8
0.7
0.8
1.2
1.5
1.8
3.5
3.3
1.5
2.1
2.6
2.6
2.5
2.0
1.4
0.6
0.6
0.8
1.0
1.3
1.5
2.0
2.3
2.4
2.8
3.5
3.3
2.6
2.1
2.8
2.8
2.3
1.8
1.3
0.9
0.6
0.6
0.8
1.1
1.4
1.7
2.0
2.3
2.6
2.4
2.3
2.7
3.0
2.4
2.5
3.0
3.1
2.2
1.5
1.0
0.7
0.6
0.9
1.2
1.5
1.8
2.0
2.2
2.4
2.3
1.2
1.8
1.9
2.6
2.7
2.7
3.3
2.9
2.1
1.4
0.8
0.6
0.7
1.1
1.5
1.1
2.3
2.3
2.2
2.1
1.9
1.6
1.3
1.3
1.7
2.5
3.0
2.4
2.2
2.1
1.5
0.8
0.6
0.8
1.1
1.7
2.2
2.6
2.3
2.0
1.7
1.4
1.2
1.0
0.9
1.4
2.4
2.8
2.5
1.6
1.7
1.5
1.1
0.7
0.7
1.1
1.5
2.0
2.2
2.0
1.6
1.3
1.0
0.9
0.9
1.1
1.4
2.0
2.5
2.4
1.7
1.6
1.5
1.1
0.8
0.7
0.9
1.2
1.5
1.6
1.4
1.2
0.9
0.8
0.9
1.2
1.5
1.8
2.3
2.6
2.5
1.9
1.4
1.2
0.9
0.7
0.7
0.9
1.0
1.1
1.0
0.6
0.8
1.0
1.3
1.7
2.0
2.4
2.6
2.6
2.5
1.8
1.2
1.3
1.2
1.0
0.8
0.7
0.6
0.6
0.7
0.6
0.7
1.0
0.8
1.7
2.1
2.3
2.6
2.6
2.5
2.2
1.8
1.6
1.3
1.2
1.2
1.0
0.8
0.6
0.5
0.5
0.6
0.9
1.3
1.7
1.3
2.5
2.6
2.5
2.4
2.2
2.0
2.1
1.9
1.6
1.3
1.3
1.1
0.9
0.6
0.6
0.8
1.2
1.6
2.0
2.5
2.8
2.6
2.3
2.1
2.2
2.2
2.3
2.3
1.9
1.5
1.5
1.5
1.3
1.0
1.0
1.3
1.6
1.9
2.1
2.4
2.4
2.3
2.1
2.2
2.5
2.4
2.4
2.7
1.7
1.8
1.9
1.7
1.0
1.8
2.0
2.1
2.1
2.1
2.0
2.0
2.1
2.4
2.3
2.0
2.1
1.8
2.4
2.2
2.2
1.3
2.4
2.2
2.0
1.9
1.8
2.2
2.4
2.3
1.9
2.8
3.2
2.8
2.6
2.5
2.2
1.9
1.9
2.0
2.2
2.6
2.1
3.1
3.0
2.7
2.6
2.3
2.2
2.1
2.2
1.9
1.8
1.7
2.3
2.3
2.3
2.2
2.3
2.2
1.9
1.5
1.0
1.8
2.2
2.6
2.4
1.9
1.4
1.4
1.9
2.7
2.5
2.1
1.6
2.0
2.1
SCALE:
PHOTOMETRIC PLAN
1" = 20'
E1.1
PHOTOMETRIC PLAN
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
0 10 20 40
1"=20'
SCALE IN FEET
GRAPHIC SCALE
CALCULATION SUMMARY
CALCULATION TYPE UNITS AVG MAX MIN AVG/MIN MAX/MIN
ILLUMINANCE FC 1.79 3.5 0.5 3.58 7.00
B. KOLAK
W. JENISON
W. JENISON
3'-6"
3'
MAX. 36"
(TYP)1
HILTI HAS-E B7 HDG 1/2" W/ HY200
ADHESIVE, OR APPROVED EQUAL.
MIN EMBED 5" (TYP)
FINISH GRADE
3" CLEAR (TYP)
5-#5 VERTICAL REBAR,
EVENLY SPACED (TYP)
#3 STIRRUPS
@ 12" OC (TYP)
HSS 3X3X3/16, HDG
P1001 UNISTRUT CHANNEL, HDG, OR
APPROVED EQUAL, BOLTED TO
VERTICAL LEG WITH 0.5" DIA BOLTS (TYP)
SEAL (TYP)
1/4" THICK PLATE
HDG (TYP)
8"X8"X3/8" BASE PLATE
ON 1" GROUT PAD (TYP)
24" DIA., 4000 PSI CIP
CONCRETE FOOTING, CAST
IN SONOTUBE FORM (TYP)
PANEL SURFACE AREA
NOT TO EXCEED 8.5 SF
EXOTHERMICALLY WELD #4/0 AWG
BOND CONDUCTOR FROM GROUND
ROD TO BASE OF STRUCTURAL
STEEL EQUIPMENT RACK
EXOTHERMICALLY WELD #4/0 AWG
BOND CONDUCTOR FROM GROUND
ROD TO BASE OF STRUCTURAL
STEEL EQUIPMENT RACK
2' MIN
AS REQUIREDFINISHED GRADE
3" MIN
ALL SIDES
ELECTRICAL
PVC CONDUIT
COMPACTED SAND
BEDDING
UNDISTURBED EARTH
WARNING TAPE
CENTERED OVER CONDUIT
IDENTIFICATION
3/8" STAINLESS STEEL
HEX HEAD BOLT WITH
WASHER (TYP.)
1/2" X 4" SLOT
SKID RESISTANT
SURFACE
IDENTIFICATION 'CAST'
INTO BOX LID (TO
INDICATE ELECTRIC
OR COMMUNICATION)
GRAVEL BASE,
6" DEEP MIN.
COVER
BASE
EXTENSION
KNOCKOUTS
(6 PLACES)
IDENTIFICATION
'CAST' INTO BOX LID
HAND HOLE LID
AASHTO H-20 TRAFFIC
RATED HAND HOLE
10" MIN.
2" MIN.
FINISH GRADE
GRAVEL BASE
6" DEEP MIN.CONDUIT SIDE ENTRY
3-#5 CONTINUOUS
AROUND PERIMETER
#3 TIES AT 12 INCHES
CONCRETE COLLAR,
(1 INCH SLOPE AWAY
FROM HAND HOLES)
A
A
6" MIN.
FEATHER AND TAMP BACKFILL TO
CREATE FLUSH INSTALLATION AND
POSITIVE DRAINAGE AWAY FROM HAND
HOLE.
A CONDUIT WILL PENETRATE SIDES OF HAND HOLE AT
LOWEST POINT WITH INDIVIDUAL CIRCULAR HOLES
APPROPRIATELY SIZED FOR THE CONDUIT.
E5.0
ELECTRICAL DETAILS
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
B. KOLAK
W. JENISON
W. JENISON
SCALE:--
LIGHT POLE CONDUIT DETAIL
N.T.S.
SCALE:--
LIGHT POLE GROUNDING DETAIL
N.T.S.
SCALE:--
GROUND EQUIPMENT ROD
N.T.S.
#4/0 AWG BARE
COPPER CONDUCTOR
MECHANICAL
CONNECTOR SUITABLE
FOR UNDERGROUND USE
COPPER, COPPER
CLAD GROUND ROD
ALUMINUM LIGHT POLE
CONCRETE LIGHT POLE
FOUNDATION, REFERENCE
SHEET C5.0 DETAIL 4 FOR
STRUCTURAL DETAILS
GRAVEL SURFACE
CONNECT #4 AWG BARE COPPER
GROUND CONDUCTOR FROM POLE
GROUND LUG TO 5/8" x10' LONG
COPPER GROUND ROD
ALUMINUM LIGHT POLE
CONCRETE LIGHT POLE
FOUNDATION, REFERENCE
SHEET C5.0 DETAIL 4 FOR
STRUCTURAL DETAILS
GRAVEL SURFACE
3/4" CONDUIT
PROVIDE HOLE IN CENTER OF
BASE PLATE FOR CONDUIT
SCALE:--
PANEL SUPPORT
N.T.S.
MECHANICAL
CONNECTOR SUITABLE
FOR UNDERGROUND USE
3/4" X10' LONG COPPER
GROUND ROD
SCALE:--
CONDUIT TRENCH DETAIL
N.T.S.
SCALE:--
TYPICAL HANDHOLE DETAIL
N.T.S.
MECHANICAL
CONNECTOR SUITABLE
FOR UNDERGROUND USE
3/4" X10' LONG COPPER
GROUND ROD
E6.0
PANEL SCHEDULES
A. MARASCA G. REED
876543
D
E
B
C
A
87654321
G
F
E
D
C
B
A
G
F
KEESLER AIR FORCE BASE
MAHG22-1015MAY 27 2022
N/A
RV PARKING AREA AT OAK PARK
UTILITY
XFMR-RMT-1
50 KVA
EXISTING PADMOUNT
240/120V
UNKNOWN PRI KV
NEW PANEL A
240/120V, 1PH, 3W
100A
10 KAIC
NEMA 4X SST
20A 2P
MAIN
100A/2P
LIGHTING CIRCUIT A
20A 2P
NEW
LIGHTING
CONTROLLER
NEMA 4X SST
C1 C2
C2 C3
PHOTOCELL /
LIGHTING
CONTACTOR
20A 1P
LIGHTING CIRCUIT B
B. KOLAK
W. JENISON
W. JENISON
PANEL A SCHEDULE
PANEL NAME PANEL A
TYPE MCB 100 AMP LOCATION: RV PARKING LOT
VOLTAGE 240/120VAC MINIMUM AIC RATING 10 KA FED FROM: XFMR RMT-1 50 KVA
TR
IP
A M
PS
PO
LE
S
DESIGNATION WIRE
N
EU
TR
A
L
G N
D
C O
N D
K
VA
C A
TE
G
O R
Y
N O
PH
A
SE
A
PH
A
SE
B
N O
C A
TE
G
O R
Y
K
VA
C O
N D
G N
D
N
EU
TR
A
L
WIRE DESIGNATION
PO
LE
S
TR
IP
A M
PS
20 2 LIGHTING CIRCUIT A #10 #10 #12 3/4"
0.8 L 1 0.8 2
0.8 L 3 0.8 4
20 2 LIGHTING CIRCUIT B #10 #10 #12 3/4"
0.7 L 5 0.7 6
0.7 L 7 0.7 8
9 0.0 10 11 0.0 12 13 0.0 14 15 0.0 16 17 0.0 18 G 0.0
-- #10 #10 #10 SPD 2 20
19 0.0 20 G 0.0
TOTAL 1.58 1.55 TOTAL CONNECTED LOAD 3.13 KVA
DEMAND KVA
R RECEPTACLE<10KW 100% 0.0 DEMAND 16.27 AMPS
R RECEPTACLE >10KW 50% 0.0
L LIGHTS 125% 3.9
G GENERAL EQUIPMENT 100% 0.0
H HEATER 125% 0.0 1. INSTALL INTEGRAL TYPE II SURGE PROTECTIVE DEVICE(SPD)
M MOTORS LESS LARGEST 100% 0.0
M LARGEST MOTOR 125% 0.0
TOTAL 3.9
2 #2 PHASE
1 #2 NEUTRAL
1 #8 GROUND
1.5" CONDUIT
2 INCH CONDUIT BETWEEN
PANEL A AND LIGHTING
CONTROL PANEL. FEED
ALL CONDUCTORS
THROUGH THIS CONDUIT
SINGLE LINE DIAGRAM
2 #10 PHASE
1 #10 NEUTRAL
1 #12 GROUND
3/4" CONDUIT
2 #10 PHASE
1 #10 NEUTRAL
1 #12 GROUND
3/4" CONDUIT
20 1 PHOTOCELL / LIGHTING CONTACTOR #10 #10 #12 --
NOTE: LIGHT FIXTURE BALLAST HAS AN
INPUT VOLTAGE RANGE OF 120-277VAC
AND WILL OPERATE REGARDLESS OF
VOLTAGE DROP LOSSES.
0.03 G
| Sheets and Views |
| T1.0 TITLE SHEET |
| G1.0 GENERAL NOTES |
| D1.0 EXISTING CONDITIONS |
| D1.1 RV PARKING SITE DEMOLITION |
| C1.0 SITE MODIFICATION PLAN |
| C1.1 GEOMETRY PLAN |
| C1.2 RV PARKING GRADING PLAN |
| C4.0 SECTIONS AND ELEVATIONS |
| C5.0 CIVIL DETAILS I |
| C5.1 CIVIL DETAILS II |
| ELECTRICAL |
| E0.0 ELECTRICAL NOTES |
| E1.0 ELECTRICAL POWER PLAN |
| E1.1 PHOTOMETRIC PLAN |
| E5.0 ELECTRICAL DETAILS |
| E6.0 PANEL SCHEDULES |