Attachment 3 - Drawings - Eads Shower Toilet Replacement.pdf
PDF 5 MB Posted
- Attached to
- HNF Showerhouse-Toilet Replacements
- Solicitation number
- 1244826Q0005
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a set of architectural and engineering design plans for the Hardin Ridge Recreation Area EADS (Shower/Toilet) Building in Monroe County, Indiana, located within the Hoosier National Forest under the Brownstown Ranger District. The project was designed by the U.S. Department of Agriculture Forest Service and includes comprehensive construction drawings dated September 21, 2023 (sheets C-1.01 and C-1.02) through April 30, 2014 (earlier versions).
The facility design encompasses a 47-foot by 40-foot-4-inch building containing two restrooms, an accessible family restroom with shower, two shower rooms, a utility/pipe alley space, and open passage area. The structure features concrete foundation footings with reinforced concrete slabs, wood-framed roof construction with scissor trusses at 24-inch on-center spacing, and split-face masonry block exterior walls. Interior finishes include painted drywall ceilings, vinyl cove base, and troweled flooring with appropriate drainage. The mechanical systems include a water service entrance with gate valve, circulation pump, and individual shower controls; waste plumbing with 4-inch stack vents exiting through the roof; 24-gauge galvanized sheet metal ductwork for ventilation with bathroom exhaust vents and a power ventilator; and electrical service with 200-amp main panel, circuits for water heaters and restroom lighting, and photo cell controls. Site improvements require connection to existing utilities, sidewalk installation with ABA compliance, new subsurface sewer line installation with cleanout details, and erosion control using silt fence and straw bale placement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION MAP PROJECT LOCATION MAP
SHEET OF
United States Department of Agriculture Forest Service
HARDIN RIDGE RECREATION AREA
EADS SHOWER/TOILET BUILDING
RECOMMENDED BY:
FOREST ENGINEER
HERITAGE PROGRAM MANAGER DATE
DATE
PUBLIC SERVICES STAFF OFFICER DATE
6/ 2/
4:
J O
SE
PH
N
EU
K A
M C
:\U
SE
R S\
JO
SE
PH
N
EU
K
A M
\B O
X\
0-
\7
0B U
IL
D
IN
G
SF
A
C
IL
IT
IE
S\
\G
A O
A F
Y2
PR
O
JE
C
TS
\T
O
IL
ET
S
H O
W
ER
B U
IL
D
IN
G
S\
EA
D S\
D R
A W
IN
G
S\ A
-0 .0
1.
D
W G
INDIANA
MONROE COUNTY
(R09 EASTERN REGION
HOOSIER NATIONAL FOREST
BROWNSTOWN RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
TRAVEL DIRECTIONS:
FROM BEDFORD IN, OFFICE - TURN RIGHT ON JOHN A WILLIAMS BLVD. TURN RIGHT ON S.R.37 N.
CONTINUE ON S.R37 FOR 12 MILES. TURN RIGHT ON OLD SR. 37. THEN LEFT ON CREST MOTEL RD.
TURN LEFT ON GUTHRIE RD. CONTINUE ON GUTHRIE RD. )ROAD BECOMES GUTHRIE/COVEYVILLE RD.)
CONTINUE FOR APPROXIMETLY 6.2 MILES. TURN LEFT ON S. CHAPEL HILL RD. FOR 1.5 MILES. HARDIN
RIDGE RECREATION ARE IS ON THE LEFT.
DISTRICT RANGER DATE
FOREST SUPERVISOR DATE
PROJECT CONTROL POINTS
CONTROL POINT 1
N = 10114.10' E = 9925.90'
ELEV = 94.03'
3/4" X 30" REBAR WITH 3-1/4"
ALUMINUM CAP SET FLUSH
CONTROL POINT 2
N = 10000.00' E = 10000.00'
ELEV = 100.00'
2" MAG NAIL WITH WASHER SET
FLUSH IN ASPHALT PARKING LOT
NOTES:
1. UTILITIES SHOWN ARE BASED ON ABOVE GROUND EVIDENCE AND
MARKINGS BY A UTILITY CONTRACTOR.
2. FIELDWORK BEGAN IN NOVEMBER 2020 AND WAS COMPLETED IN
DECEMBER 2020.
EADS - TOPOGRAPHIC SURVEY
WATER
VALVE
WATER
VALVE
T O
IL
E
T /S
H O
W E
R B
U I L
D I N
G
WATERLINE
TRENCH
CONTROL
POINT 1
CONTROL
POINT 2
UNDERGROUND
ELECTRIC
CAMPSITE 19
HOST SITE
UNDERGROUND
ELECTRIC
CONCRETE PAD
DRINKING FOUNTAIN
ELECTRIC METER
UTILITY POLE
ELECTRIC
TRANSFORMER
SANITARY MH
RIM = 96.73'
INV IN = 93.32'
INV OUT = 93.11'
ELECTRIC POST
KIOSK
TRASH ENCLOSURE
(WOOD PRIVACY FENCE)
UNDERGROUND
ELECTRIC SIGN
BUSH
DECIDUOUS
TREE (TYP)
95 96
99 10
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Designer
Plotter Scale
Date
CAD Archive No.
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
No.
Revision/Issue Date
NOTES
Sheet of
REGION NINE
EADS
SHOWER / TOILET BUILDING
Hoosier National Forest Tell City Ranger District
EADS
C-1.01
C.Meenach
B.Lidell
9/21/2023
1 : 1
J.Klug
Existing Site Plan
2 17
PROJECT CONTROL POINTS
CONTROL POINT 1
N = 10114.10' E = 9925.90'
ELEV = 94.03'
3/4" X 30" REBAR WITH 3-1/4"
ALUMINUM CAP SET FLUSH
CONTROL POINT 2
N = 10000.00' E = 10000.00'
ELEV = 100.00'
2" MAG NAIL WITH WASHER SET
FLUSH IN ASPHALT PARKING LOT
NOTES:
1. EXISTING UTILITIES SHOWN ARE BASED ON ABOVE GROUND EVIDENCE
AND MARKINGS BY A UTILITY CONTRACTOR.
2. FIELDWORK BEGAN IN NOVEMBER 2020 AND WAS COMPLETED IN
DECEMBER 2020.
3. PROPOSED MANHOLE LOCATION TO BE STAKED BY COR.
4. EXISTING MANHOLE TO BE FILLED.
5. SALVAGE EXISTING WALL-MOUNTED TOILETS AND SINKS AS
GOVERNMENT PROPERTY
EADS - TOPOGRAPHIC SURVEY
WATER
VALVE
WATER
VALVE
WATERLINE
TRENCH
CONTROL
POINT 1
CONTROL
POINT 2
UNDERGROUND
ELECTRIC
CAMPSITE 19
HOST SITE
UNDERGROUND
ELECTRIC
CONCRETE PAD
DRINKING FOUNTAIN
ELECTRIC METER
UTILITY POLE
ELECTRIC
TRANSFORMER
SANITARY MH
RIM = 96.73'
INV IN = 93.32'
INV OUT = 93.11'
ELECTRIC POST
KIOSK
TRASH ENCLOSURE
(WOOD PRIVACY FENCE)
UNDERGROUND
ELECTRIC SIGN
DECIDUOUS
TREE (TYP)
95 96
99 10
0 7.5 15 30
PROPOSED 2" WATER LINE
PROPOSED MANHOLE
AND 6" SEWER LINE
PROPOSED
ELECTRIC LINE
EXISTING 6" SEWER LINE
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Designer
Plotter Scale
Date
CAD Archive No.
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
No.
Revision/Issue Date
NOTES
Sheet of
REGION NINE
EADS
SHOWER / TOILET BUILDING
Hoosier National Forest Tell City Ranger District
EADS
C-1.02
C.Meenach
B.Lidell
09/21/2023
1 : 1
J.Klug
Proposed Site Plan
3 17
SILT FENCE DETAIL
Install as needed before beginning demolition or construction
6"
Max. 10'-0" O.C.
Filter fabric hardwood stakes
Backfill and recompact trench
Direction of flow
1 1/2"x1 1/2" Min.
6"
'-0
M in
M in
NO SCALE
STRAW BALE PLACEMENT
NO SCALE
FOR EROSION CONTROL
1/31/3 1/3
3'-0", #4 REBAR STAKE
BURY STRAW BALES 3"
C/L SWALE
SIDEWALK DETAIL
NO SCALE
4" M
IN
M
IN
M
IN
. B U
R Y
D E
P T
H
12" PLUS PIPE DIA.
24" MIN.
PIPE BEDDING MATERIAL
TYPICAL TRENCH DETAIL
WASTEWATER / SUPPLY LINES
TERRA TAPE "D"
WITH WORDS
"CAUTION SEWER LINE
BURIED BELOW"
4" TOP SOIL
4"
BACKFILL
FINISHED GRADE
#4 @ 12" E.W.
6"
TYPICAL MANHOLE DETAIL
WASTEWATER
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Designer
Plotter Scale
Date
CAD Archive No.
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
No.
Revision/Issue Date
NOTES
Sheet of
REGION NINE
EADS
SHOWER / TOILET BUILDING
Hoosier National Forest Tell City Ranger District
EADS
C-1.03
H.Wanderling
B.Lidell
09/21/2023
1 : 1
J.Klug
Site Plan Details
4 17
A S102
S102 A
FOOTING/FOUNDATION PLAN
SCALE: 3/8" = 1'0"
S102 C
S102 D
S102 B
S102 E
F S102
S102 B
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
EADS
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
S-1.01
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Micheal Knutson
Footing/Foundation Plan
5 17
Technical Services Team
SCALE: 3/4"= 1'0"
SCALE: 3/4"= 1'0"
SCALE: 3/4"= 1'0"
SCALE: 3/4"= 1'0"
SCALE: 3/4"= 1'0"
SCALE: 3/4"= 1'0"
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
EADS
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
S-1.02
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Micheal Knutson
Foundation Sections
6 17
SCALE: 1/4" = 1'0"
SCALE: 3/4"= 1'0" SCALE: 3/4"= 1'0" SCALE: 3/4"= 1'0"
SCALE: 3/4"= 1'0"
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
EADS
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
S-1.03
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Micheal Knutson
Roof Framing Layout
7 17
Womens Restroom
Pipe Alley
Shower
O pe n
Utility
Accessible Restroom and Shower
Mens Restroom Shower
SCALE: 3/8" = 1'0"
Pa ss ag e
Shower U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
EADS
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
A-1.01
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Daryl Dean
Floor Plan
8 17
Technical Service Team
REAR VIEW
SCALE: 1/4" = 1'0"
RESTROOMSIDE VIEW
SCALE: 1/4" = 1'0"
FRONT VIEW
SCALE: 1/4" = 1'0" SCALE: 1/4" = 1'0"
SHOWER SIDE VIEW
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
Eads
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
A-2.01
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Daryl Dean
Elevations
9 17
BUILDING SECTION 1
A104 SCALE: 3/8" = 1'0"
SCALE: 3/4" = 1'0"
TYPICAL WALL SECTION
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
Eads
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
A-3.01
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Daryl Dean/Micheal Knutson
Building Sections
10 17
BUILDING SECTION 2
A105 SCALE: 3/8" = 1'0"
A105
BUILDING SECTION 3
SCALE: 3/8" = 1'0"
SILL DETAIL
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
Eads
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
A-3.02
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Daryl Dean/Micheal Knutson
Building Sections Cont.
11 17
BUILDING SECTION
A106
SCALE: 3/8" = 1'0"
A106
5 BUILDING SECTION
SCALE: 3/8" = 1'0"
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
Eads
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
A-3.03
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Daryl Dean/Micheal Knutson
Building Sections Cont.
12 17
WINDOW AND VENT ELEVATIONS
TYP. JAMB SECTION
DOOR DETAILS
WINDOW AND VENT SCHEDULE
NO. UNIT ROUGH OPENING REQD.DESCRIPTION QTY. FRAME SIZE
DOOR SCHEDULE
SWING
DOORDOOR
NO. TYPE
DOOR SIZE DOOR JAMB
WIDTH
ALL DOORS TO TO BE KEYED THE SAME
LOCKSET FUNCTIONLEVER / TRIM
1-1/2 PAIR/SET
HINGES CLOSER
(REINF.) TRIM
OPERATING
( PLASTIC )
KICK PLATES ACCESSORIESFRAME SIGNS
** CEILING FINISHES **
** WALL BASE **
** WALL FINISH **
** FLOOR FINISH **
ROOM FINISH SCHEDULE
BASE
ROOM
CODE TO ROOM FINISH SCHEDULE
NO. ROOM NAME TYPE
CEILING
FLOOR
TYPICAL NORTH SOUTH
WALLS
EAST WEST
REMARKS
DESIGN CRITERIA
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
Eads
SHOWER / TOILET BUILDING
Hoosier National Forest Tell City Ranger District
A-4.01
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Daryl Dean
Schedules
13 17
WASTE PLUMBING LAYOUT
SCALE: 3/8" = 1'0"
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
Eads
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
M-3.01
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Bill Sullivan
Waste Plumbing Layout
14 17
Forest Engineer
WATER SUPPLY LAYOUT
Pipe Alley
Womens Restroom
Utility
Mens Restroom
O pe n Pa ss ag e
Shower and Shower Family Restroom
Shower
Shower
NOT TO SCALE
WATER SERVICE ENTRANCE
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
Eads
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
M-3.02
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Bill Sullivan
Water Supply Layout
15 17
DUCTWORK LAYOUT
Womens Restroom
Pipe Alley
Shower
O pe n Pa ss ag e
Utility
Family Restroom and Shower
Mens Restroom Shower
SCALE: 3/8" = 1'0"
Shower
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
Eads
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
M-3.03
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Bill Sullivan
Mechanical Ventilation Plan
16 17
ELECTRICAL PLAN
Mens Restroom
Shower and Shower Family Restroom
Shower Womens Restroom
Utility
Pipe Alley
O pe n Pa ss ag e
Shower
RISER DIAGRAM
NO SCALE
LEGENDELECTRIC CIRCUIT SCHEDULE
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
REGION NINE
Eads
SHOWER / TOILET BUILDING
Hoosier National Forest Brownstown Ranger District
E-1.01
Bacon/Ekman
B.Lidell
04/30/2014
1 : 1
Bill Sullivan
Electrical Plan
17 17
File details come from the government source that posted it. Updated .