This is a Questions and Answers document providing clarifications on contract requirements for facility improvements at two sites: EADS and Southern Point.

Key requirements clarified include: abandoned sewer lines shall be capped at existing manholes rather than completely removed; water lines must be replaced to the main valve underground using copper piping only (HDPE substitution is not permitted); cleared materials become contractor property and must be removed from the project site, except for stripped topsoil designated for stockpiling; the HNF will mark trees for removal but will not locate sewer termination points at Southern Point; old toilets need not be saved; existing parking lots and gravel areas may be used for storage and parking, with contractors responsible for site security and asphalt replacement if damaged; building overhangs must remain as designed (24" eave overhang and 16" gable overhang); electrical work at Southern Point Site 30 involves connecting existing host site electrical circuit to a new toilet-shower panel; Lexan material is specified in Spec 08 45 23; custom grids must be used as dimensioned on drawings; custom Quaker Bronze color is required; work must be duplicated at the Southern Point facility; and contractors must await email notification that the building is clear of bats and other sensitive animals before commencing demolition.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 7 – Q and As

1. Does old sewer line need to be removed completely or cut and capped at manhole once manhole is removed? (Southern Point) Abandoned sewer line shall be capped at existing manhole once existing manhole is removed.

2. Replace water lines to main valve underground? EADS and Southern Point Yes

3. Said water lines need to be copper, or can we use HDPE with Pack Joints? EADS and Southern Point. HDPE may not be substituted for copper.

4. Areas for any excess dirt to be left on site or does the HNF have another area for spoil? EADS and Southern Point Except for stripped topsoil and other materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.

5. Will the HNF locate the termination point of the sewer/ MH on Southern Point? No

6. And does EADS sewer terminate at Existing MH? Eads is connected to an existing manhole.

7. Will HNF mark or verify the trees to be removed? Yes

8. Do old toilets have to be saved? EADS/Southern point. No If toilets are saved does HNF have a location on property for storage? N/A Is contractor responsible for breakage on said toilets?

EADS/Southern Point N/A

9. Are existing parking lot and gravel area available to be used for storage beside Southern Point and in front of EADS? Existing parking lot and gravel area at these 2 sites may be used for parking and new material storage. Contractor is responsible for security of project sites.

Contractor is responsible for asphalt replacement if it is damaged.

10. Overhang on eve on both buildings is 24” with a gable overhang of 16”, correct? Can they be the same overhang? EADS/Southern Point Overhangs shall remain as designed.

11. Need More Explanation on Item 4 on C-1.01(4. CONNECT EXISTING HOST SITE (SITE

#30 - 50 AMP) ELECTRICAL CIRCUIT TO NEW TOILET-SHOWER ELECTRICAL

PANEL.) Does this mean using existing wire on campsites that are found with junction boxes or running all new wire to the campsites? This applies only to Southern Point Site 30.

12. Spec 08 45 23 there is a mention of Lexan on one of the detail sheets. Is that correct? Yes

13. Also, drawing is showing two different types of custom grids. Is this correct or will standard shoji grids suffice? Use grids as dimensioned.

14. Do you want custom color of Quaker Bronze which will also be custom? Yes

15. Finally, are we to duplicate this for the Southern Point facility?” Yes

16. Will contractor need to wait until bats or other sensitive animals vacate the building before we start demolition? Yes – the contractor will be notified via email when building is clear for demolition.