Attachment 3 Drawings.pdf
PDF 18 MB Posted
- Solicitation number
- 36C26026R0081
About this file
This is a set of 100% construction documents for a roofing replacement project at Mann-Grandstaff VA Medical Center in Spokane, Washington. The project involves replacing existing roofing system membranes on four buildings (Buildings 1, 2, 3, and 31) with a total roof area of 35,157 square feet. The scope includes demolition of existing TPO and EPDM roofing systems, substrate preparation and repair, installation of new fully-adhered TPO roofing assemblies with R-30 insulation per ICC-ES-ESR-1463, and installation of new metal coping, flashing, roof drains, and accessories. The project is divided into four phases based on building occupancy and work hour restrictions: Phase 1 (Building 2 – utility, anytime work permitted); Phase 2 (Building 3 – utility/storage, anytime); Phase 3 (Building 1 – patient care, 07:00-21:00 daily); and Phase 4 (Building 31 – patient care, Monday-Friday 18:30-06:30, weekends anytime). Work is to be bid separately by building in order of importance: Building 2, Building 3, Building 1, and Building 31.
The contract documents establish applicable standards including 2024 IBC, 2024 NFPA 101 Life Safety Code, 2022 NFPA 241, OSHA standards, ASCE/SEI 7-22, 2023 VA Seismic Design Requirements, and 2023 NEC. Key general notes require contractors to verify existing conditions prior to demolition, protect equipment and utilities in place during construction, coordinate with all trades and subcontractors, and submit coordination drawings showing utilities and penetrations at appropriate scale. The contractor bears responsibility for all cutting, fitting, and patching required for completion and must design roofs with positive slope of minimum 1/4 inch per foot to maximum 1 inch per foot. All asbestos-containing roofing materials must be removed and abated per specification section 02 82 13. The detailed roof plans, demolition plans, and renovation plans for each building include specific key notes identifying items to remain and protect, items to remove and reinstall, and new installations. Supporting detail sheets provide specifications for metal coping installation, termination bars, pipe flashings, roof drains, mechanical curb flashing, and equipment support systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 9 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 8 Limitations on Subcontracting-Construction.pdf | ||
| Attachment 4 668-24-103 HAZ B1.pdf | ||
| Attachment 2 Specifications.pdf | ||
| Attachment 1 SOW.docx | DOCX document | |
| 36C26026R0081_1.docx | DOCX document | |
| Attachment 11 Wage Determination WA20260114.pdf | ||
| Attachment 7 668-24-103 HAZ B31.pdf | ||
| Attachment 5 668-24-103 HAZ B2.pdf | ||
| Attachment 10 Division Cost Breakout.xls | XLS spreadsheet | |
| Attachment 6 668-24-103 HAZ B3.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
W
E
6AA
12 1
6A
37 39
A S S E M B L Y S T R E E T
M E
M O
R I A
L C
I R C
L E
W E
L L
E S
L E
Y A
V E
I N D E P E N D E N C E D R I V E I N
D E
P E
N D
E N
C E
D R
I V E
R E
S E
R V
E R
O A
D
F R E E D O M W A Y
D A
V
D A
V
D A
V
D A
V
D A
V
DAV
DAV
D A
V
D A
V
V T
S
V T
S
V T
S
VTS
V T
S
V T
S
V T
S
G S
A
G S
A
G S
A
G S
A
R E
S
R E
S
1 MAIN BUILDING
2 PHARMACY / SPECIALTY CARE
3 UTILITY PLANT / LAUNDRY
4 EDUCATION / LRC (UNDER CONSTRUCTION)
5 ENGINEERING
6 HUMAN RESOURCES
6a VETERANS SERVICES / VOLUNTARY SERVICES
7 SUBSTANCE ABUSE / TRANSITIONAL CARE MANAGEMENT
12 COMMUNITY LIVING CENTER
14 WAREHOUSE RECEIVING
14a ENGINEERING STORAGE
15 MRI
16 WAREHOUSE STORAGE
23 CHILLERS
27 OUTPATIENT CLINIC
30 EYE CLINIC / QUALITY MANAGEMENT
31 PHYSICAL THERAPY / PROSTHETICS
32 (UNDER CONSTRUCTION)
33 DENTAL CLINIC
37 NATIVE AMERICAN VETERANS HEALING LODGE
38 SWITCHGEAR BUILDING
39 GENERATOR BUILDING
40 OUTPATIENT MENTAL HEALTH BUILDING
41 AUDIOLOGY
BUILDING KEY PLAN
GI-310
GI-102
1 1
GI-103
GI-300
GI-200
LAYDOWN
AREA
LAYDOWN AREA
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA/ LR
GI-000
COVER SHEET
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
Reference Site Plan
PROJECT
SITE
REPLACE EXISTING ROOFING SYSTEM MEMBRANES ON BUILDINGS 1 (AREAS
A298, B299, B397, B398, B399), 2, 3, AND 31.
PROJECT DESCRIPTION
VICINITY MAP
PROJECT TEAM
FACILITY:
Department of Veterans Affairs Engineering Service, Building 5 Mann-Grandstaff VA Medical Center 4815 North Assembly St.
Spokane, WA 99205
Contact: Michael Langenheim P: 509.434.7000 x6469 E: michael.langenheim@va.gov
ARCHITECT
MA|Architects, Inc.
385 Van Ness Ave., Suite 110 Torrance, CA 90501
Contact: Sofie O'Brien P: 424.302.5271, Ext. 105 E: s.obrien@ma-architects.net
COMMISSIONING AGENT
Enviros 220 Ramsey Street Hastings, MN 55033
Contact: Scott Sinclair P: 718.314.6599 E: ssinclair@enviros.co
DEPARTMENT OF VETERANS AFFAIRS
Mann-Grandstaff VA Medical Center
4815 North Assembly St., Spokane, Washington 99205
VA Project No. 668-24-103 Replace Roofing - Buildings 1, 2, 3, and 31
N
Rev. Date Description
BID DEDUCTS
EACH BUILDING ROOF TO BE BID SEPARATELY, IN ORDER OF IMPORTANCE:
DEDUCT #1: BUILDING 2 (UTILITY)
DEDUCT #2: BUILDING 3 (UTILITY & STORAGE)
DEDUCT #3: BUILDING 1 (PATIENT CARE)
DEDUCT #4: BUILDING 31 (PATIENT CARE)
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
STATE OF WASHINGTON
Issue for Construction
APPLICABLE STANDARDS:
VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
2024 International Building Code (IBC) (Only when specifically referenced in VA Design Documents, see notes below)
2024 NFPA 101 Life Safety Code
2022 NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations
2022 NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900
Occupational, Safety and Health Administration (OSHA) Standards
ASCE/SEI 7-22 Minimum Design Loads and Associated Criteria for Buildings and Other Structures
2023 VA Seismic Design Requirements, H-18-8
2023 National Electrical Code (NEC) (NFPA 70)
2021 International Plumbing Code (IPC)
2022 Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.
2023 ASME Boiler and Pressure Vessel Code
ASME Code for Pressure Piping
2015 Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)
Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)
Energy policy Act of 2005 (EPAct)
DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High- Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)
Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.
The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01 00 00 of the VA Master Construction Specification.
Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2022.
Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2022.
UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN
THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF PROJECT SUBMISSION (U.N.O.)
GENERAL NOTES:
1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED BY
THE "SHEET INDEX".
2. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE
DRAWINGS OF ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE – REFER
TO THE "SHEET INDEX".
3. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE ARE
INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND
ESTABLISH MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.
THIS PROJECT AND ALL PARTS OF THE WORK ASSOCIATED WITH THE PROJECT -
INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC - SHALL COMPLY WITH ALL
APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND LAWS OF ALL
FEDERAL, STATE, DISTRICT, TERRITORIAL, AND LOCAL GOVERNMENT AUTHORITIES HAVING
JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,
WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT.
NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE NOR
PERMIT WORK CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION,
ORDINANCE, OR LAW.
4. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT
ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS.
5. SCHEDULE & COORDINATE CONSTRUCTION WORK HOURS TO ACCOMMODATE THE
OPERATION OF THE FACILITY.
6. THE ARCHITECTURAL DRAWINGS ARE A PART OF A LARGER SET OF DRAWINGS WHICH,
WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS. THE
SET OF DRAWINGS, WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE "SHEET
INDEX". PARTIAL SETS OF DRAWINGS ARE INCOMPLETE.
THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND
ELEVATIONS ILLUSTRATE THE DESIGN INTENT. THE ARCHITECTURAL DRAWINGS
ESTABLISH AND COORDINATE THE FINISHED APPEARANCE AND LOCATION OF MANY, BUT
NOT ALL, EXPOSED ELEMENTS OF THE WORK. THE STRUCTURAL, MECHANICAL,
ELECTRICAL, PLUMBING, OTHER DRAWINGS, AND JOB SPECIFICATIONS ARE
SUPPLEMENTARY TO THE ARCHITECTURAL WORKING DRAWINGS.
THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY
THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE OR MANUFACTURER
INSTALLATION REQUIREMENTS. SHOULD THEY DISAGREE IN THEMSELVES, OR WITH EACH
OTHER, BIDS SHALL BE BASED ON THE MOST EXPENSIVE COMBINATION OF QUALITY AND
QUANTITY OF WORK INDICATED. ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL
BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER FOR
CLARIFICATION.
7. THE SPECIFICATIONS ARE INTENDED TO COMMUNICATE THE DETAILED PROPERTIES AND
QUALITY OF THE INDIVIDUAL MATERIALS, ASSEMBLIES, AND SYSTEMS THAT COMPRISE THE
WORK; THE FUNCTIONAL AND PERFORMANCE REQUIREMENTS FOR THE INDIVIDUAL PARTS
OF THE WORK; AND THE FABRICATION AND INSTALLATION REQUIREMENTS FOR INDIVIDUAL
PARTS OF THE WORK - THE SPECIFICATIONS TAKE PRECEDENCE OVER THE DRAWINGS
WITH RESPECT TO INFORMATION OF THIS NATURE.
8. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":
A. ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT
OR ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE
MANUFACTURES AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR
ASSEMBLY ILLUSTRATED BY THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR
ASSEMBLY.
B. THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN
LIEU OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY THE
CONTRACTING OFFICER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE (AT NO
ADDITIONAL EXPENSE TO THE GOVERNMENT) FOR ALL COORDINATION AND
REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME
FUNCTIONAL AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE "BASIS OF
DESIGN" SHOWN IN THE CONTRACT DOCUMENTS.
C. THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS
VARY FROM THAT SHOWN BY THE DRAWINGS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE COORDINATION OF THE WORK OF THE TRADES,
SUBCONTRACTORS, AND MATERIAL SUPPLIERS
9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH ALL REQUIREMENTS OF THE
CONTRACT DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT
ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE
REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK
OF THAT PARTY.
CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES
NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,
DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED
IN THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING, OR PATCHING
THAT MAY BE REQUIRED TO COMPLETE WORK OR TO MAKE ITS SEVERAL PARTS FIT
TOGETHER.
10. THE CONTRACTOR SHALL, IN ADVANCE OF THE WORK, PREPARE COORDINATION
DRAWINGS SHOWING THE LOCATION OF OPENINGS THROUGH SLABS, THE PIPE SLEEVES
AND HANGER INSERTS, AS WELL AS THE LOCATION AND ELEVATION OF UTILITY LINES,
INCLUDING, BUT NOT LIMITED TO, CONVEYOR SYSTEMS, PNEUMATIC TUBES, DUCTS, AND
CONDUITS AND PIPES TWO INCHES AND LARGER IN DIAMETER WITH THEIR SUPPORTS.
THESE DRAWINGS, INCLUDING PLANS, ELEVATIONS, AND SECTIONS AS APPROPRIATE,
SHALL CLEARLY SHOW THE MANNER IN WHICH THE UTILITIES FIT INTO THE AVAILABLE
SPACE AND RELATE TO EACH OTHER AND TO EXISTING BUILDING ELEMENTS. DRAWINGS
SHALL BE OF APPROPRIATE SCALE TO SATISFY THE PREVIOUSLY STATED PURPOSES, BUT
NOT SMALLER THAN 3/8” SCALE. DRAWINGS MAY BE COMPOSITE (WITH DISTINCTIVE
COLORS FOR THE VARIOUS TRADES) OR MAY BE SEPARATE BUT FULLY COORDINATED
DRAWINGS OF THE SAME SCALE. SEPARATE DRAWINGS SHALL BE ALIGNED TO DEPICT
IDENTICAL BUILDING AREAS OR SECTIONS AND SHALL BE CAPABLE OF BEING OVERLAID IN
ANY COMBINATION. THE SUBMITTED DRAWINGS FOR A GIVEN AREA OF THE PROJECT
SHALL SHOW THE WORK OF ALL TRADES THAT WILL BE INVOLVED IN THAT PARTICULAR
AREA. COMPLETE COMPOSITE DRAWINGS IN ELECTRONIC FORMAT SHALL BE RECEIVED BY
THE GOVERNMENT NOT LESS THAN 20 FEDERAL WORKING DAYS PRIOR TO THE
SCHEDULED START OF THE WORK IN THE AREA ILLUSTRATED BY THE DRAWINGS, FOR THE
PURPOSE OF SHOWING THE CONTRACTOR’S PLANNED METHODS OF INSTALLATION. THE
OBJECTIVES OF SUCH DRAWINGS ARE TO PROMOTE CAREFULLY PLANNED WORK
SEQUENCE AND PROPER TRADE COORDINATION, IN ORDER TO ASSURE THE EXPEDITIOUS
SOLUTIONS OF PROBLEMS AND THE INSTALLATION OF LINES AND EQUIPMENT AS
CONTEMPLATED BY THE CONTRACT DOCUMENTS WHILE AVOIDING OR MINIMIZING
ADDITIONAL COSTS TO THE CONTRACTOR AND TO THE GOVERNMENT. IN THE EVENT THE
CONTRACTOR, IN COORDINATING THE VARIOUS INSTALLATIONS AND IN PLANNING THE
METHOD OF INSTALLATION, FINDS A CONFLICT IN LOCATION OR ELEVATION OF ANY OF THE
UTILITIES WITH THEMSELVES, WITH STRUCTURAL ITEMS OR WITH OTHER CONSTRUCTION
ITEMS, THE GENERAL CONTRACTOR SHALL BRING THIS CONFLICT TO THE ATTENTION OF
THE CONTRACTING OFFICER IMMEDIATELY.
IN DOING SO, THE CONTRACTOR SHALL EXPLAIN THE PROPOSED METHOD OF SOLVING THE
PROBLEM OR SHALL REQUEST INSTRUCTIONS AS TO HOW TO PROCEED IF ADJUSTMENTS
BEYOND THOSE OF USUAL TRADES’ COORDINATION ARE NECESSARY. INSTALLATION OF
UTILITIES WORK WILL NOT PROCEED IN ANY AREA PRIOR TO THE SUBMISSION AND
COMPLETION OF THE GOVERNMENT REVIEW OF THE COORDINATION DRAWINGS FOR THAT
AREA, NOR IN ANY AREA IN WHICH CONFLICTS ARE DISCLOSED BY THE COORDINATION
DRAWINGS, UNTIL THE CONFLICTS HAVE BEEN CORRECTED TO THE SATISFACTION OF THE
CONTRACTING OFFICER. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO
SUBMIT THE REQUIRED DRAWINGS IN A TIMELY MANNER CONSISTENT WITH THE
REQUIREMENTS TO COMPLETE THE WORK COVERED BY THIS CONTRACT WITHIN THE
PRESCRIBED CONTRACT TIME.
11. THE ARCHITECT / ENGINEERS SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT
BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON
PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE
WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL
CONTRACTOR.
GENERAL NOTES CONTINUED:
12. ALL WORK NOTED "N.I.C." OR "NOT IN CONTRACT" IS TO BE ACCOMPLISHED BY A
CONTRACTOR OTHER THAN THE GENERAL CONTRACTOR AND IS NOT TO BE PART OF THE
CONSTRUCTION AGREEMENT. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE TO
COORDINATE WITH ALL "OTHER" CONTRACTORS PER REQUIREMENTS ESTABLISHED BY
GOVERNMENT, WHICH ARE UNDER SEPARATE CONTRACT WITH THE GOVERNMENT.
13. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE
REQUIREMENTS OR MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF
THE GOVERNMENT SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. THE
CONTRACTOR SHALL PROMPTLY CORRECT ALL WORK REJECTED BY THE GOVERNMENT AS
DEFECTIVE OR AS FAILING TO CONFORM TO THE CONTRACT DOCUMENTS WHETHER
OBSERVED BEFORE OR AFTER SUBSTANTIAL COMPLETION AND WHETHER OR NOT
FABRICATED, INSTALLED OR COMPLETED. THE CONTRACTOR SHALL BEAR ALL COSTS OF
CORRECTING SUCH REJECTED WORK.
AB
A
ANCHOR BOLT
ACT ACOUSTICAL CEILING TILE
ACP
AD
ACOUSTICAL CEILING PANEL
AREA DRAIN
ADDL ADDITIONAL
ADH
ADDITIONAL
ADHESIVE
ADJ
AFF
ADJACENT
AFG
ABOVE FINISH FLOOR
AFS
ABOVE FINISH GRADE
AGGR
ABOVE FINISH SLAB
ALUM
AGGREGATE
ALT
ALUMINUM
ANOD
ALTERNATE
APPROX
ANODIZED
ARCH
APPROXIMATE(LY)
ACS PNL ACCESS PANEL
ARCHITECT(URAL)
ASPH ASPHALT
AVG AVERAGE
BB
B
BULLETIN BOARD
BD BOARD
BTWN
BLDG
BETWEEN
BUILDING
BM
BOT
BENCHMARK
BOTTOM
BITUM BITUMINOUS
BOS BOTTOM OF STEEL
BRG BEARING
BSMT BASEMENT
CAB
C
CABINET
CB CATCH BASIN
CCT
CG
CUBICLE CURTAIN TRACK
CORNER GUARD
CEM
CER
CEMENT, CEMENTITIOUS
CERAMIC
CCTV CLOSED CIRCUIT TELEVISION
CH BD CHALKBOARD
CI CAST IRON
CJ CONTROL JOINT
CL
CLG
CLR
CMU
CNTR
COL
CONC
CONF
CONN
CONSTR
CONT
CONTR
CORR
CPT
CSK
CSP
CSWK
CU
CW
CENTER LINE
CEILING
CLEAR
CONCRETE MASONRY UNIT
COUNTER
COLUMN
CONCRETE
CONFERENCE
CONNECTION
CONSTRUCTION
CONTINUOUS
CONTRACTOR
CORRUGATED
CARPET
COUNTERSUNK
COMBINATION STANDPIPE
CASEWORK
CUBIC
COLD WATER
D
D
DEPTH
DBL DOUBLE
DBL ACT DOUBLE ACTING
DEG DEGREE
DEMO DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DIM PT DIMENSION POINT
DISP DISPENSER
DIST DISTANCE
DN DOWN
DR DRAIN
DS DOWNSPOUT
DSP DRY STANDPIPE
DT DRAPERY TRACK
DWG DRAWING
DWGS DRAWINGS
(E)
E
EXISTING
EA EACH
EDR EQUIPMENT DRAWING
EG EDGE GUARD
EIFS EXTERIOR INSULATION FINISH SYSTEM
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EOS EDGE OF SLAB
EP ELECTRICAL PANEL
EPB ELECTRICAL PANEL BOARD
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ESCAL ESCALATOR
EST ESTIMATE(D)
EWC ELECTRIC WATER COOLER
EXC EXCAVATED
EXH EXHAUST
EXP EXPANSION
EXP JT EXPANSION JOINT
EXT EXTERIOR
FURN FURNITURE
FXTR FIXTURE
G
G
GAS
H
H
HIGH
GA GAUGE, GAGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GL GLASS
GLU LAM GLUE LAMINATED
GLZ GLAZING
GR GRADE OR GRADING
GVL GRAVEL
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
ID
I
INSIDE DIAMETER
JAN
J
JANITOR
KG
K
KILOGRAM
L
L
LENGTH, LONG
M
M
METERS
(N)
N
NEW
P
QT
Q
QUARRY TILE
R
R
RISER
S SOUTH
T
T
TREAD
W
W
WEST
XFMR
X
TRANSFORMER
YD
Y
YARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HPT HIGH POINT
HR HOUR
HVAC HEATING-VENTILATION-AIR CONDITIONING
IN INCH
INCAND INCANDESCENT
INCL INCLUDE, INCLUDING
INFO INFORMATION
INSUL INSULATION
INTR INTERIOR
INV INVERT
IVT INTRAVENOUS TRACK
JST JOIST
JT JOINT
KIT KITCHEN
KPL KICK PLATE
KS KNEE SPACE
LAB LABORATORY
LAM LAMINATE, LAMINATION
LAV LAVATORY
LB POUND
LED LIGHT EMITTING DIODE
LF LINEAR FOOT
LG LENGTH
LIN LINEAR
LL LEAD LINED
LPT LOW POINT
LT LIGHT
LT WT LIGHT WEIGHT
LTG LIGHTING
LVR LOUVER
HW HOT WATER
S
MACH MACHINE
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MC MEDICINE CABINET
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOLDING
MM MILLIMETERS
MO MASONRY OPENING
MOD MODULE, MODULAR
MTD MOUNTED
MTG MOUNTING
MVBL MOVABLE
MULL MULLION
NA NOT APPLICABLE
NAT NATURAL
NE NORTHEAST
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOICE REDUCTION COEFFICIENT
NTS NOT TO SCALE
NW NORTHWEST
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNEU PNEUMATIC
PNL PANEL
PNL BD PANEL BOARD
PNT PAINT
PORT PORTABLE
PP PUSH PLATE
PPM PARTS PER MILLION
PR PAIR
PRCST PRECAST
PREP PREPARATION
PREFAB PREFABRICATION
PRKG PARKING
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTN PARTITION
PTS PNEUMATIC TUBE STATION
PVC POLYVINYL CHLORIDE
PVG PAVING
PVMT PAVEMENT
PWR POWER
QTR QUARTER
QTY QUANTITY
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
RD ROOF DRAIN
RECT RECTANGULAR
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCE (D) (ING) (MENT)
REQD REQUIRED
REQT REQUIREMENT
RESIL RESILIENT
RET RETURN
REV REVISION
RF RESILIENT FLOORING
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHWS ROUND HEAD WOOD SCREW
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RWL RAIN WATER LEADER
SAF
SB SPLASH BLOCK
SC SOLID CORE
SCHED SCHEDULE
SCRN SCREEN
SD STORM DRAIN
SE SOUTHEAST
SECT SECTION
SEG SEGMENT
SEP SEPARATION OR SEPARATE
SEP JT SEPARATION JOINT
SHT SHEET, SHEETING
SHWR SHOWER
SHV SHELVES, SHELVING
SIM SIMILAR
SK SINK
SMS SHEET METAL SCREW
SP SPACE, SPACED, SPACING
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SQ SQUARE
SS SANITARY SEWER
SSK SERVICE SINK
SST STAINLESS STEEL
ST STREET
STA STATION
STAG STAGGERED
STC SOUND TRANSMISSION COEFFICIENT
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
STS SELF-TAPPING STEEL
SUSP SUSPENDED
SUSP CLG SUSPENDED CEILING
SVCE SERVICE
SW SOUTHWEST
SYMM SYMMETRICAL
SYST SYSTEM
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TOP OF CONCRETE, TOP OF CURB
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
THERM THERMAL
THK THICK, THICKNESS
THRES THRESHOLD
THRU THROUGH
TMPD GL TEMPERED GLASS
TO TOP OF
TOR TOP OF RAILING
TOS TOP OF STEEL
TOT TOTAL
TOW TOP OF WALL
TP TOP OF PAVEMENT
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
UC
U
UNDER COUNTER
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTABLE POWER SUPPLY
UTIL UTILITY
W/ WITH
W/O WITHOUT
WC WATER CLOSET OR WALL COVERING
WD WOOD
WDW WINDOW
WGL WIRE GLASS
WCHR WHEELCHAIR
WM WIRE MESH
WO WHERE OCCURS
WPT WORKING POINT
WR WATER RESISTANT
WSCT WAINSCOT
WSP WET STANDPIPE
WT WEIGHT
WTHPRF WEATHERPROOF
WTRPRF WATERPROOF
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
CCR CARD CONTROL READER
BUR BUILT UP ROOFING SYSTEM
CT CERAMIC TILE
F
F/F FACE TO FACE
FA FIRE ALARM
FAS FIRE ALARM STATION
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FEC FIRE EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FF FINISH FACE
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHWS FLAT HEAD WOOD SCREW
FHY FIRE HYDRANT
FLAM FLAMMABLE
FLASH FLASHING
FLEX FLEXIBLE
FLUOR FLUORESCENT
FO FACE OF
FSB FOLDING SHOWER BENCH
FSTNR FASTENER
FT FOOT, FEET
OC
O
ON CENTER
PA PUBLIC ADDRESS
OA OVERALL
OD OUTSIDE DIAMETER
OFCI
OFOI
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
OVHD OVERHEAD
OZ OUNCE
PART PARTIAL
PBD PARTICLEBOARD
PBX
PCF POUNDS PER CUBIC FOOT
PCI POUNDS PER CUBIC INCH
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PI POINT OF INTERSECTION
PL PLATE
PLAM PLASTIC LAMINIATE
P
PRIVATE TELEPHONE EXCHANGE
OWNER FURNISHED-CONTRACTOR INSTALLED
OWNER FURNISHED-OWNER INSTALLED
VAC
V
VACUUM
VB VALVE BOX
VCT VINYL COMPOSITION TYLE
VERT VERTICAL
VEST VESTIBULE
VIT VITREOUS
VP VENT PIPE
VOL VOLUME
VWC VINYL WALL COVERING
ABBREVIATIONS
SYMBOLS
ANGLE
@ AT
C CENTER LINEL
Ø DIAMETER
= EQUAL
> GREATER THAN
< LESS THAN
± PLUS OR MINUS (TOLERANCE)
# POUND(S)
' FOOT OR FEET
" INCH OR INCHES
FOF FACE OF FINISH
OH OPPOSITE HAND
HSS HOLLOW STRUCTURAL STEEL
SA SUPPLY AIR
SYMBOLS LEGENDS
SHEET
NORTH IDENTIFIER
ELEVATION
IDENTIFIER
KEY NOTE TAG
GRID LINES
CALL-OUT
IDENTIFIER
? PHOTOGRAPH
LOCATIONS
+? CEILING TAG
WALL TYPE TAG
Sheet #
Ref # On Sheet
WINDOW TAG#
REFER TO PARTITION DETAIL FOR LEGEND AND
FURTHER INFORMATION.
#X#
PARTITION TYPE
STUD WIDTH
FIRE RATING
#-##-## CASEWORK TAG
PARTITION TYPE DESIGNATION = 'X'
NON-RATED PARTITION = N
ACOUSTICAL RATED PARTITION = A
SHAFT PARTITION = S
FURRED PARTITION = F
SEE PARTITION DETAIL FOR MORE INFORMATION.
#X#
PARTITION
TYPE
STUD WIDTH
FIRE RATING
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA
GI-001
SHEET INDEX, APPLICABLE
STANDARDS & GENERAL NOTES
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
APPLICABLE STANDARDS
GENERAL
GI-000 COVER SHEET
GI-001 SHEET INDEX, APPLICABLE STANDARDS & GENERAL NOTES
GI-002 PHASING PLAN
PROJECT ADDRESS: 4815 North Assembly St.
Spokane, WA 99205
CONSTRUCTION TYPE: BLDG 1 I (FULLY SPRINKLERED)
BLDG 2 I
BLDG 3 I & II
BLDG 31 II
STORIES: BLDG 1 8 STORIES + BASEMENT AND PENTHOUSE
BLDG 2 1 STORY w/ MEZZANINE
BLDG 3 1 STORY
BLDG 31 1 STORY
BLDG. OCCUPANCY : BLDG 1 HEALTHCARE
BLDG 2 UTILITY
BLDG 3 UTILITY & STORAGE
BLDG 31 HEALTHCARE
AREA OF WORK: BLDG 1 5,128 sf BLDG 2 12,291 sf BLDG 3 8,424 sf BLDG 31 9,314 sf TOTAL 35,157 sf
PROJECT GENERAL NOTES
SHEET INDEX
PROJECT DATA
DETAILS
AE-900 ROOF DETAILS
AE-901 ROOF DETAILS
Rev. Date Description
BLDG 1
GI-102 BLDG 1 2ND FLOOR EXISTING ROOF PLAN
GI-103 BLDG 1 3RD FLOOR EXISTING ROOF PLAN
GI-104 BLDG 1 EXISTING ROOF PHOTOS
GI-105 BLDG 1 EXISTING ROOF PHOTOS
AD-102 BLDG 1 2ND FLOOR ROOF DEMOLITION PLAN
AD-103 BLDG 1 3RD FLOOR ROOF DEMOLITION PLAN
AE-102 BLDG 1 2ND FLOOR ROOF RENOVATION PLAN
AE-103 BLDG 1 3RD FLOOR ROOF RENOVATION PLAN
BLDG 2
GI-200 BLDG 2 EXISTING ROOF PLAN
GI-201 BLDG 2 EXISTING ROOF PHOTOS
GI-202 BLDG 2 EXISTING ROOF PHOTOS
AD-200 BLDG 2 ROOF DEMOLITION PLAN
AE-200 BLDG 2 ROOF RENOVATION PLAN
BLDG 3
GI-300 BLDG 3 EXISTING ROOF PLAN
GI-301 BLDG 3 EXISTING ROOF PHOTOS
AD-300 BLDG 3 ROOF DEMOLITION PLAN
AE-300 BLDG 3 ROOF RENOVATION PLAN
BLDG 31
GI-310 BLDG 31 EXISTING ROOF PLAN
GI-311 BLDG 31 EXISTING ROOF PHOTOS
AD-310 BLDG 31 ROOF DEMOLITION PLAN
AE-310 BLDG 31 ROOF RENOVATION PLAN
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
W
E
6AA
12 1
6A
A S S E M B L Y S T R E E T
M E
M O
R I A
L C
I R C
L E
W E
L L
E S
L E
Y A
V E
I N D E P E N D E N C E D R I V E
I N D
E P
E N
D E
N C
E D
R I V
E
R E
S E
R V
E R
O A
D
F R E E D O M W A Y
DAV
DAV
D A
V
D A
V
VTS
R E
S
R E
S
GI-103
PHASE 2
PHASE 11
PHASE 3
PHASE 4
PHASING LEGEND:
PHASE 1
BUILDING 2: UTILITY
WORK ALLOWED ANYTIME
PHASE 2
BUILDING 3: UTILITY AND STORAGE
WORK ALLOWED ANYTIME
PHASE 3
BUILDING 1: PATIENT CARE
WORK ALLOWED 07:00-21:00, EVERY DAY
PHASE 4
BUILDING 31: PATIENT CARE
WORK ALLOWED M-F 18:30-06:30, S-S ANYTIME
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA/ LR
GI-002
PHASING PLAN
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
1" = 40'-0"
Phasing Plan
Rev. Date Description
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
.P
E .P
F .E
F .E
F.E.
F A C P
UP
DNUP
D N
R D
R D
R D
R D
GI-104
GI-104
GI-104
GI-1046
GI-104
GI-10414
GI-104
GI-1052
GI-105 5
GI-105
GI-105
ROOF A298
ROOF B299
GI-104
GI-104
Echo A240A
Waiting A240
Stair 1 S2-B1
Mech Room B252
LAYDOWN AREA
BELOW
2884 SF
1461 SF
Staff B262C
Oncology B262
Office B262G
Exam B262H
Waiting B262A
Patient Toilet B262J
Office B259
Staff Toilet B260
Storage B258
C&P Reception
B256
C&P Exam B257
C&P Exam B255
Corridor C2-B2
Office B254
C&P Exam B253
Office B251
Conference B250
Lab Quality Assurance/
Storage B247
I.V. Therapy B248
Office B246
Corridor C2-B1
Mech B289
Vascular Lab A238
Echo A240B
Reception A242
Elec A244
Storage
A240CA
Storage A240C
Corridor C2-A1
ROOF ACCESS
FROM EXTERIOR
ROOF ACCESS
FROM EXTERIOR
(E) SLOPE
(E) SLOPE
(E
S L O
P E
(E) SLOPE(E) SLOPE
(E
S L O
P E
(E
S L O
P E
A298
B299
BUILDING 1 EXISTING ROOF:
ROOF A298
WHITE MEMBRANE ROOFING (TPO) OVER INSULATION BOARD, OVER
BUILT-UP ROOFING, OVER CONCRETE DECKING.
APPROX. AREA = 1461 SF
ROOF B299
WHITE MEMBRANE ROOFING (TPO) OVER INSULATION BOARD, OVER
BUILT-UP ROOFING, OVER CONCRETE DECKING.
APPROX. AREA = 2884 SF
ROOF LEGEND
PIPE VENT
SCUPPER
ROOF DRAIN
CAPPED VENTS
ROOF ACCESS HATCH
EXHAUST FANS
RD
PIPE VENT WITH BOOT
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND ROOF SLOPES
PRIOR TO DEMOLITION.
2. ALL ITEMS TO REMAIN (EQUIPMENT, UTILITIES, VENTS, ACCESSORIES,
ETC), PROTECT IN PLACE DURING CONSTRUCTION.
3. ALL ITEMS TO BE REMOVED & RE-INSTALLED, STORE & PROTECT
DURING CONSTRUCTION.
4. SEAL ALL PENETRATIONS THROUGH ROOF SUBSTRATE AND AT CURBS
PER SPEC SECTIONS 07 92 00 & 07 01 50.19.
5. DESIGN ROOF WITH A POSITIVE SLOPE MINIMUM 1/4" PER FT TO A
MAXIMUM OF 1" PER FT.
GENERAL NOTE:
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA/ LR
GI-102
BLDG 1 2ND FLOOR EXISTING ROOF
PLAN
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
ROOF KEY PLAN
3/16" = 1'-0"
Bldg 1 Existing Roof Plan at 2nd Floor (Reference)
Rev. Date Description
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
R D R
D
R D
R .D
F .E .C
UP
GI-105
GI-105 11
GI-105
13ROOF B398
ROOF B397
GI-105
196 SF
205 SF
Office/ Storage B358A
Counseling B358B
Day Room B358
Corridor C3-B2
Office B356
Office B354
Office/ Exam B353
Office B355
Stair B358C
Acc/ 2-Bed B352
ROOF B399
382 SF
ROOF ACCESS
FROM EXTERIOR
(E) SLOPE
(E) SLOPE (E) SLOPE
(E) SLOPE (E) SLOPE
ROOF ACCESS
FROM EXTERIOR
ROOF LEGEND
PIPE VENT
SCUPPER
ROOF DRAIN
CAPPED VENTS
ROOF ACCESS HATCH
EXHAUST FANS
RD
PIPE VENT WITH BOOT
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND ROOF SLOPES
PRIOR TO DEMOLITION.
2. ALL ITEMS TO REMAIN (EQUIPMENT, UTILITIES, VENTS, ACCESSORIES,
ETC), PROTECT IN PLACE DURING CONSTRUCTION.
3. ALL ITEMS TO BE REMOVED & RE-INSTALLED, STORE & PROTECT
DURING CONSTRUCTION.
4. SEAL ALL PENETRATIONS THROUGH ROOF SUBSTRATE AND AT CURBS
PER SPEC SECTIONS 07 92 00 & 07 01 50.19.
5. DESIGN ROOF WITH A POSITIVE SLOPE MINIMUM 1/4" PER FT TO A
MAXIMUM OF 1" PER FT.
GENERAL NOTE:
B398
B399 B397
BUILDING 1 EXISTING ROOF:
ROOF B397
WHITE MEMBRANE ROOFING (TPO) OVER GYPSUM BOARD, OVER
INSULATION BOARD, OVER BUILT-UP ROOFING WITH GRAVEL BALLAST,
OVER CONCRETE DECKING..
APPROX. AREA = 205 SF
ROOF B398
WHITE MEMBRANE ROOFING (TPO) OVER GYPSUM BOARD, OVER
INSULATION BOARD, OVER BUILT-UP ROOFING WITH GRAVEL BALLAST,
OVER CONCRETE DECKING.
APPROX. AREA = 196 SF
ROOF B399
BLACK MEMBRANE ROOFING (EPDM) OVER FOAM INSULATION, OVER
BUILT-UP ROOFING WITH GRAVEL BALLAST, OVER CONCRETE DECKING.
APPROX. AREA = 382 SF
3/16" = 1'-0"
Bldg 1 Existing Roof Plan at 3rd Floor
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
LR
GI-103
BLDG 1 3RD FLOOR EXISTING ROOF
PLAN
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
Rev. Date Description
ROOF KEY PLAN
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
GI-104
GI-104
GI-104
GI-104
GI-104
GI-104
GI-104
GI-104
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA
GI-104
BLDG 1 EXISTING ROOF PHOTOS
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
1/4" = 1'-0"
Roof B299 - Looking North
1/4" = 1'-0"
Roof B299 - Looking South
1/4" = 1'-0"
Roof B299 - Doors 1/4" = 1'-0"
Roof B299 - Access Door Threshold
1/4" = 1'-0"
Roof B299 - Mechanical Room Door Threshold 1/4" = 1'-0"
Roof B299 - Drain to Scupper
1/4" = 1'-0"
Roof B299 - Equipment Support 1/4" = 1'-0"
Roof B299 - Equipment Support Base
1/4" = 1'-0"
Roof B299 - Heat Pump Curb 1/4" = 1'-0"
Roof B299 - Heat Pump Lines
1/4" = 1'-0"
Roof B299 - Exhaust Vent 1/4" = 1'-0"
Roof B299 - Center Looking South
1/4" = 1'-0"
Roof B299 - Flashing 1/4" = 1'-0"
Roof B299 - South
1/4" = 1'-0"
Roof B299 - Vent Curb
1/4" = 1'-0"
Roof B299 - Mechanical Equipment 1/4" = 1'-0"
Roof B299 - Looking West
1/4" = 1'-0"
Roof B299 - Flashing Termination 1/4" = 1'-0"
Roof B299 - Termination Bar
Rev. Date Description
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
GI-105
4GI-105
GI-105
GI-105
SUSPENDED PIPE
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA
GI-105
BLDG 1 EXISTING ROOF PHOTOS
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
1/4" = 1'-0"
Roof A298 - Looking East 1/4" = 1'-0"
Roof A298 - Expansion Joint
1/4" = 1'-0"
Roof A298 - Expansion Joint to Curb 1/4" = 1'-0"
Roof A298 - Expansion Joint at Wall
1/4" = 1'-0"
Roof A298 - Drain and Scupper
1/4" = 1'-0"
Roof A298 - Corner 1/4" = 1'-0"
Roof A298 - Wall Corner
1/4" = 1'-0"
Roof B399 - Overall 1/4" = 1'-0"
Roof B399 - Metal Coping
1/4" = 1'-0"
Roof B399 - Roof Drain
1/4" = 1'-0"
Roof B397 - Overall 1/4" = 1'-0"
Roof B397 - Drain
1/4" = 1'-0"
Roof B398 - Roof Drain
Rev. Date Description
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
E .P
F .E
F .E
F.E.
A-
FP
C
F A C P
UP
DNUP
D N
R D
R D
R D
R D
ROOF A298
ROOF B299
TYP.
(E) SLOPE
(E
S L O
P E
(E) SLOPE(E) SLOPE
Echo B408
Waiting A240
Stair 1 S2-B1
Mech Room B252
Staff B262C
Oncology B262
Office B262G
Exam B262H
Waiting B262A
Patient Toilet B262J
Office B259
Staff Toilet B260
Storage B258
C&P Reception
B256
C&P Exam B257
C&P Exam B255
Corridor C2-B2
Office B254
C&P Exam B253
Office B251
Conference B250
Lab Quality Assurance/
Storage B247
I.V. Therapy B248
Office B246
Corridor C2-B1
Mech B289
Vascular Lab A238
Echo B409
Reception A242
Elec A244
Storage
A240CA
Storage B410
Corridor C2-A1
134 104
(E
S L O
P E
(E
S L O
P E
(E) SLOPE
(E
S L O
P E
ROOF LEGEND
PIPE VENT
SCUPPER
ROOF DRAIN
CAPPED VENTS
ROOF ACCESS HATCH
EXHAUST FANS
RD
PIPE VENT WITH BOOT
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND ROOF SLOPES
PRIOR TO DEMOLITION.
2. ALL ITEMS TO REMAIN (EQUIPMENT, UTILITIES, VENTS, ACCESSORIES,
ETC), PROTECT IN PLACE DURING CONSTRUCTION.
3. ALL ITEMS TO BE REMOVED & RE-INSTALLED, STORE & PROTECT
DURING CONSTRUCTION.
4. SEAL ALL PENETRATIONS THROUGH ROOF SUBSTRATE AND AT CURBS
PER SPEC SECTIONS 07 92 00 & 07 01 50.19.
5. DESIGN ROOF WITH A POSITIVE SLOPE MINIMUM 1/4" PER FT TO A
MAXIMUM OF 1" PER FT.
GENERAL NOTE:
A298
B299
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA/ LR
AD-102
BLDG 1 2ND FLOOR ROOF
DEMOLITION PLAN
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
Key Notes
101 GENERAL NOTE: REMOVE & ABATE (E)
ASBESTOS-CONTAINING ROOFING MATERIALS. PREP
SUBTRATE AS NEEDED TO RECEIVE NEW ROOFING. REFER
TO ASBESTOS INVESTIGATION REPORT AND SPEC SECTION
02 82 13.
102 REMOVE (E) TPO ROOFING, ASSOCIATED RIGID INSULATION,
FLASHING & TERMINATION BARS, AS APPLICABLE, DOWN TO
THE CONCRETE ROOF DECK. PREP AND REPAIR SUBSTRATE
TO RECEIVE NEW ROOFING ASSEMBLY. SEAL ALL
PENETRATIONS THROUGH ROOF. PROTECT (E) EQUIPMENT
AND UTILITIES IN PLACE.
104 (E) METAL GUARDRAIL TO REMAIN. PROTECT IN PLACE.
REMOVE RUST & CORROSION AS NEEDED FOR INSTALLATION
NEW COPING AROUND THE BASE PLATES.
107 REMOVE (E) EXPANSION JOINT COVER, ROOF COATING &
ASSOCIATED FLASHING. PREP AREA FOR INSTALLATION OF
NEW EXPANSION JOINT COVER.
108 (E) ROOF DRAIN ASSEMBLY TO REMAIN. PROTECT IN PLACE.
CLEAN FREE OF DEBRIS AS NECESSARY. CHECK ALL DRAIN
TRANSITIONS FOR ALL ROOFS FOR ANY SIGNS OF LEAKS;
REPAIR AS NECESSARY. REMOVE DRAIN COVER FOR
REPLACEMENT.
109 (E) SIDEWALL OVERFLOW DRAIN & SCUPPER TO REMAIN;
PROTECT IN PLACE. CLEAN FREE OF DEBIRS AS NECESSARY.
CHECK ALL DRAIN TRANSITIONS FOR ALL ROOFS FOR ANY
SIGNS OF LEAKS; REPAIR AS NECESSARY.
110 REMOVE & REINSTALL (E) METAL STEPS AS NECESSARY FOR
INSTALLATION OF NEW ROOFING. STORE DURING
CONSTRUCTION.
111 REMOVE & REINSTALL (E) METAL LADDER AS NECESSARY
FOR INSTALLATION OF NEW ROOFING ASSEMBLY. STORE
DURING CONSTRUCTION.
113 (E) MECHANICAL UNITS, EXHAUST & INTAKE VENTS, AND
CURBS TO REMAIN. PROTECT IN PLACE. PROVIDE
TEMPORARY FILTERS AT INTAKE, CAPABLE OF REMOVING
CHEMICAL FUMES & PREVENT COLLECTION OF DEBRIS
DURING CONSTRUCTION. REPLACE w/ NEW PERMANENT
FILTER AT THE COMPLETION OF PROJECT.
115 GENERAL NOTE: PROTECT IN PLACE (E) CABLES & CONDUITS
NOT AFFECTED DURING CONSTRUCTION.
116 REMOVE (E) THRESHOLD AT ROOF ACCESS DOOR, AS
NECESSARY FOR INSTALLATION OF NEW ROOFING
ASSEMBLY.
117 (E) WEEP SCREED @ STUCCO WALL TO REMAIN.
118 (E) VENTS & OTHER ROOF PENETRATIONS TO REMAIN.
PROTECT IN PLACE DURING CONSTRUCTION. SEAL ALL
PENETRATIONS THROUGH ROOF PER SPEC SECTION 07 92
00.
123 REMOVE (E) METAL COPING & FLASHING, PREP AREA TO
RECEIVE NEW METAL COPING ASSEMBLY.
132 (E) METAL EQUIPMENT SUPPORT TO REMAIN; PROTECT IN
PLACE.
133 REPLACE (E) DRAIN TROUGH.
134 REMOVE (E) TERMINATION BAR, PREP AREA TO RECEIVE NEW
ROOFING ASSEMBLY.
137 REMOVE & REINSTALL (E) CONDUIT AS NECESSARY FOR
INSTALLATION OF NEW EXPANSION JOINT OVER. STORE
DURING CONSTRUCTION.
3/16" = 1'-0"
Bldg 1 Demolition Roof Plan at 2nd Floor
Rev. Date Description
ROOF KEY PLAN
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
F .E .C
UP
R D R
D
R D
ROOF LEGEND
PIPE VENT
SCUPPER
ROOF DRAIN
CAPPED VENTS
ROOF ACCESS HATCH
EXHAUST FANS
RD
PIPE VENT WITH BOOT
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND ROOF SLOPES
PRIOR TO DEMOLITION.
2. ALL ITEMS TO REMAIN (EQUIPMENT, UTILITIES, VENTS, ACCESSORIES,
ETC), PROTECT IN PLACE DURING CONSTRUCTION.
3. ALL ITEMS TO BE REMOVED & RE-INSTALLED, STORE & PROTECT
DURING CONSTRUCTION.
4. SEAL ALL PENETRATIONS THROUGH ROOF SUBSTRATE AND AT CURBS
PER SPEC SECTIONS 07 92 00 & 07 01 50.19.
5. DESIGN ROOF WITH A POSITIVE SLOPE MINIMUM 1/4" PER FT TO A
MAXIMUM OF 1" PER FT.
GENERAL NOTE:
ROOF B399
ROOF B398
ROOF B397
109 108
(E) SLOPE (E) SLOPE
(E) SLOPE (E) SLOPE
(E) SLOPE
Office/ Storage B358A
Counseling B358B
Day Room B358
Corridor C3-B2
Office B356
Office B354
Office/ Exam B353
Office B355
Stair B358C
Acc/ 2-Bed B352
B398
B399 B397
3/16" = 1'-0"
Bldg 1 Demolition Roof Plan at 3rd Floor
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA/ LR
AD-103
BLDG 1 3RD FLOOR ROOF
DEMOLITION PLAN
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
Rev. Date Description
ROOF KEY PLAN
Key Notes
101 GENERAL NOTE: REMOVE & ABATE (E)
ASBESTOS-CONTAINING ROOFING MATERIALS. PREP
SUBTRATE AS NEEDED TO RECEIVE NEW ROOFING. REFER
TO ASBESTOS INVESTIGATION REPORT AND SPEC SECTION
02 82 13.
102 REMOVE (E) TPO ROOFING, ASSOCIATED RIGID
INSULATION, FLASHING & TERMINATION BARS, AS
APPLICABLE, DOWN TO THE CONCRETE ROOF DECK. PREP
AND REPAIR SUBSTRATE TO RECEIVE NEW ROOFING
ASSEMBLY. SEAL ALL PENETRATIONS THROUGH ROOF.
PROTECT (E) EQUIPMENT AND UTILITIES IN PLACE.
103 REMOVE (E) EPDM ROOFING, ASSOCIATED RIGID
INSULATION, FLASHING & TERMINATION BARS, AS
APPLICABLE, DOWN TO THE CONCRETE ROOF DECK. PREP
AND REPAIR SUBSTRATE TO RECEIVE NEW ROOFING
ASSEMBLY. SEAL ALL PENETRATIONS THROUGH ROOF.
PROTECT (E) EQUIPMENT AND UTILITIES IN PLACE.
105 REMOVE (E) METAL COPING, PREP AREA TO RECEIVE NEW
METAL COPING ASSEMBLY.
108 (E) ROOF DRAIN ASSEMBLY TO REMAIN. PROTECT IN
PLACE. CLEAN FREE OF DEBRIS AS NECESSARY. CHECK
ALL DRAIN TRANSITIONS FOR ALL ROOFS FOR ANY SIGNS
OF LEAKS; REPAIR AS NECESSARY. REMOVE DRAIN COVER
FOR REPLACEMENT.
109 (E) SIDEWALL OVERFLOW DRAIN & SCUPPER TO REMAIN;
PROTECT IN PLACE. CLEAN FREE OF DEBIRS AS
NECESSARY. CHECK ALL DRAIN TRANSITIONS FOR ALL
ROOFS FOR ANY SIGNS OF LEAKS; REPAIR AS NECESSARY.
115 GENERAL NOTE: PROTECT IN PLACE (E) CABLES &
CONDUITS NOT AFFECTED DURING CONSTRUCTION.
118 (E) VENTS & OTHER ROOF PENETRATIONS TO REMAIN.
PROTECT IN PLACE DURING CONSTRUCTION. SEAL ALL
PENETRATIONS THROUGH ROOF PER SPEC SECTION 07 92
00.
123 REMOVE (E) METAL COPING & FLASHING, PREP AREA TO
RECEIVE NEW METAL COPING ASSEMBLY.
134 REMOVE (E) TERMINATION BAR, PREP AREA TO RECEIVE
NEW ROOFING ASSEMBLY.
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
E .P
F .E
F .E
F.E.
A-
FP
C
F A C P
UP
DNUP
D N
R D
R D
R D
R D
A298
B299
1/4" PER FT MIN
/4
P
E R
F T
M
IN
/4
P
T M
IN
1/4" PER FT MIN
Echo B408
Waiting A240
Stair 1 S2-B1
Mech Room B252
Staff B262C
Oncology B262
Office B262G
Exam B262H
Waiting B262A
Patient Toilet B262J
Office B259
Staff Toilet B260
Storage B258
C&P Reception
B256
C&P Exam B257
C&P Exam B255
Corridor C2-B2
Office B254
C&P Exam B253
Office B251
Conference B250
Lab Quality Assurance/
Storage B247
I.V. Therapy B248
Office B246
Corridor C2-B1
Mech B289
Echo B409
Reception A242
Elec A244
Storage
A240CA
Storage B410
ROOF A298
ROOF B299
AE-900
AE-900
AE-900
AE-900
TYP.
AE-901
AE-900
AE-900
AE-901
TYP.
AE-900
AE-901
AE-901
1/4" PER FT MIN
/4
P
E R
F T
M
IN
1/4" PER FT MIN
/4
P
M
IN
TYP.
ROOF LEGEND
PIPE VENT
SCUPPER
ROOF DRAIN
CAPPED VENTS
ROOF ACCESS HATCH
EXHAUST FANS
RD
PIPE VENT WITH BOOT
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND ROOF SLOPES
PRIOR TO DEMOLITION.
2. ALL ITEMS TO REMAIN (EQUIPMENT, UTILITIES, VENTS, ACCESSORIES,
ETC), PROTECT IN PLACE DURING CONSTRUCTION.
3. ALL ITEMS TO BE REMOVED & RE-INSTALLED, STORE & PROTECT
DURING CONSTRUCTION.
4. SEAL ALL PENETRATIONS THROUGH ROOF SUBSTRATE AND AT CURBS
PER SPEC SECTIONS 07 92 00 & 07 01 50.19.
5. DESIGN ROOF WITH A POSITIVE SLOPE MINIMUM 1/4" PER FT TO A
MAXIMUM OF 1" PER FT.
GENERAL NOTE:
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA/ LR
AE-102
BLDG 1 2ND FLOOR ROOF
RENOVATION PLAN
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
3/16" = 1'-0"
Bldg 1 Renovation Roof Plan at 2nd Floor
Rev. Date Description
ROOF KEY PLAN
Key Notes 201 INSTALL (N) FULLY-ADHERED TPO ROOFING ASSEMBLY w/
INSULATION (R-30) PER MANUFACTURER'S INSTALLATION
REQUIREMENTS. DESIGN TO MEET ICC-ES-ESR-1463.
205 INSTALL (N) 24ga GALVANIZED METAL COPING AROUND (E)
GUARDRAIL POST BASES ON (E) CURB.
207 INSTALL (N) EXPANSION JOINT COVER.
208 INSTALL (N) ROOF DRAIN COVER.
209 RE-INSTALL CONDUIT AT SAME LOCATION.
210 RE-INSTALL METAL STEPS.
212 INSTALL (N) NON-SLIP WALKWAY PADS.
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
D R
D
R D
R .D
F .E .C
UP
ROOF LEGEND
PIPE VENT
SCUPPER
ROOF DRAIN
CAPPED VENTS
ROOF ACCESS HATCH
EXHAUST FANS
RD
PIPE VENT WITH BOOT
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND ROOF SLOPES
PRIOR TO DEMOLITION.
2. ALL ITEMS TO REMAIN (EQUIPMENT, UTILITIES, VENTS, ACCESSORIES,
ETC), PROTECT IN PLACE DURING CONSTRUCTION.
3. ALL ITEMS TO BE REMOVED & RE-INSTALLED, STORE & PROTECT
DURING CONSTRUCTION.
4. SEAL ALL PENETRATIONS THROUGH ROOF SUBSTRATE AND AT CURBS
PER SPEC SECTIONS 07 92 00 & 07 01 50.19.
5. DESIGN ROOF WITH A POSITIVE SLOPE MINIMUM 1/4" PER FT TO A
MAXIMUM OF 1" PER FT.
GENERAL NOTE:
ROOF B399
AE-900
1/4" PER FT
MIN
1/4" PER FT MIN
1/4" PER FT MIN 1/4" PER FT MIN
Office/ Storage B358A
Counseling B358B
Day Room B358
Corridor C3-B2
Office B356
Office B354
Office/ Exam B353
Office B355
Stair B358C
Acc/ 2-Bed B352
ROOF B398
ROOF B397
AE-900
AE-900
AE-901
TYP.
TYP.
AE-900
AE-900
TYP.
TYP.
1/4" PER FT MIN
B398
B399 B397
3/16" = 1'-0"
Bldg 1 Renovation Roof Plan at 3rd Floor
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA/ LR
AE-103
BLDG 1 3RD FLOOR ROOF
RENOVATION PLAN
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
Rev. Date Description
ROOF KEY PLAN
Key Notes 201 INSTALL (N) FULLY-ADHERED TPO ROOFING ASSEMBLY w/
INSULATION (R-30) PER MANUFACTURER'S INSTALLATION
REQUIREMENTS. DESIGN TO MEET ICC-ES-ESR-1463.
204 INSTALL (N) TERMINATION BAR w/ (N) ROOFING ASSEMBLY.
206 INSTALL (N) 24ga GALVANIZED METAL COPING ON (E) CONC.
CURB.
208 INSTALL (N) ROOF DRAIN COVER.
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
RD
RD
RD
RD RD
RD
RD
RD
RD
SLOPE
LOWER ROOF A
LOWER ROOF BLOWER ROOF C
LOWER ROOF D
GI-201
GI-201
GI-201 7
GI-201
GI-20115
GI-201
GI-201
GI-202
GI-2023
GI-2026
GI-202
GI-202
GI-202
GI-202 11
GI-202 12
VENT STACKS
MECHANICAL
EQUIPMENT
BLOCK OUTS
ACCESS HATCH
3/8" CONDUIT
INTAKE AND
EXHAUST VENTS
HEAT VENT HELD BY GUY WIRES
HEAT PUMP
EXHAUST
VENT
METAL SHED
UPPER ROOF
DISCONNECT SWITCH
CONDUIT SUPPORTS
GI-201
GI-201
GI-201
GI-201
GI-201
LADDER
METAL GUARDRAIL
PIPE VENT ON PAD
J-BOX
PIPE VENT, TYP.
SCUPPERCURBS
EXTERIOR
LIGHT FIXTURE
ACCESS HATCH
ROOFING CAP FLASHING
LAYDOWN AREA
BELOW
2616 SF
4785 SF
1803 SF2675 SF
412 SF
(E
S L O
P E
(E
S L O
P E
(E
S L O
P E
(E
S L O
P E
(E
S L O
P E
(E
S L O
P E
(E) SLOPE
(E
S L O
P E
(E
S L O
P E
APPROX. +30"
(E
S L O
P E
(E
S L O
P E
BUILDING 2 EXISTING ROOF:
UPPER ROOF
WHITE MEMBRANE ROOFING (TPO) OVER INSULATION BOARD, OVER
BUILT-UP ROOFING, OVER CONCRETE DECKING.
APPROX. AREA = 2616 SF
LOWER ROOF A
WHITE MEMBRANE ROOFING (TPO) OVER INSULATION BOARD, OVER
BUILT-UP ROOFING, OVER CONCRETE DECKING.
APPROX. AREA = 4785 SF
LOWER ROOF B
WHITE MEMBRANE ROOFING (TPO) OVER INSULATION BOARD, OVER
BUILT-UP ROOFING, OVER CONCRETE FILLED METAL DECKING.
APPROX. AREA = 1803 SF
LOWER ROOF C
WHITE MEMBRANE ROOFING (TPO) OVER INSULATION BOARD, OVER
BUILT-UP ROOFING, OVER CONCRETE FILLED METAL DECKING.
APPROX. AREA = 2675 SF
LOWER ROOF D - WHITE MEMBRANE ROOFING (TPO) OVER
INSULATION BOARD, OVER BUILT-UP ROOFING, OVER CONCRETE
DECKING.
APPROX. AREA = 412 SF
ROOF LEGEND
PIPE VENT
SCUPPER
ROOF DRAIN
CAPPED VENTS
ROOF ACCESS HATCH
EXHAUST FANS
RD
PIPE VENT WITH BOOT
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND ROOF SLOPES
PRIOR TO DEMOLITION.
2. ALL ITEMS TO REMAIN (EQUIPMENT, UTILITIES, VENTS, ACCESSORIES,
ETC), PROTECT IN PLACE DURING CONSTRUCTION.
3. ALL ITEMS TO BE REMOVED & RE-INSTALLED, STORE & PROTECT
DURING CONSTRUCTION.
4. SEAL ALL PENETRATIONS THROUGH ROOF SUBSTRATE AND AT CURBS
PER SPEC SECTIONS 07 92 00 & 07 01 50.19.
5. DESIGN ROOF WITH A POSITIVE SLOPE MINIMUM 1/4" PER FT TO A
MAXIMUM OF 1" PER FT.
GENERAL NOTE:
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA/ LR
GI-200
BLDG 2 EXISTING ROOF PLAN
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
3/16" = 1'-0"
Bldg 2 Existing Roof Plan (Reference)
Rev. Date Description
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
GI-201
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA
GI-201
BLDG 2 EXISTING ROOF PHOTOS
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
1/4" = 1'-0"
Bldg 2 - Lower Roof A
1/4" = 1'-0"
Bldg 2 - Lower Roof A Looking South 1/4" = 1'-0"
Bldg 2 - Metal Building at North
1/4" = 1'-0"
Bldg 2 - Lower Roof A Looking West 1/4" = 1'-0"
Bldg 2 - Lower Roof A Looking North
1/4" = 1'-0"
Bldg 2 - Lower Roof A Looking East 1/4" = 1'-0"
Bldg 2 - Lower Roof A Mechanical Equipment
1/4" = 1'-0"
Bldg 2 - Lower Roof A Vent 1/4" = 1'-0"
Bldg 2 - Metal Building Flashing
1/4" = 1'-0"
Bldg 2 - Concrete Canopy at West
1/4" = 1'-0"
Bldg 2 - Lower Roof B 1/4" = 1'-0"
Bldg 2 - Lower Roof B Curb to Roof A
1/4" = 1'-0"
Bldg 2 - Lower Roof B at Northeast Corner 1/4" = 1'-0"
Bldg 2 - Lower Roof B at Corner
1/4" = 1'-0"
Bldg 2 - Lower Roof B Looking at Roof C
1/4" = 1'-0"
Bldg 2 - Lower Roof B Curb to Roof C 1/4" = 1'-0"
Bldg 2 - Lower Roof C Wall Flashings
1/4" = 1'-0"
Bldg 2 - Lower Roof C Looking South 1/4" = 1'-0"
Bldg 2 - Lower Roof C
Rev. Date Description
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
GI-2025
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA
GI-202
BLDG 2 EXISTING ROOF PHOTOS
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
1/4" = 1'-0"
Bldg 2 - Lower Roof D Mechanical Equipment 1/4" = 1'-0"
Bldg 2 - Lower Roof D Looking West
1/4" = 1'-0"
Bldg 2 - Lower Roof Concrete Canopy at South West
1/4" = 1'-0"
Bldg 2 - Lower Roof D Scupper 1/4" = 1'-0"
Bldg 2 - Lower Roof C Looking at Roof D
1/4" = 1'-0"
Bldg 2 - Lower Roof D Level Change
1/4" = 1'-0"
Bldg 2 - Upper Roof Access Ladder and Hatch 1/4" = 1'-0"
Bldg 2 - Upper Roof Looking Northwest
1/4" = 1'-0"
Bldg 2 - Upper Roof Mechanical Equipment 1/4" = 1'-0"
Bldg 2 - Upper Roof Looking Southwest
1/4" = 1'-0"
Bldg 2 - Upper Roof Equipment Curb 1/4" = 1'-0"
Bldg 2 - Upper Roof Vent Stacks
Rev. Date Description
07/14/2026
20122443
REGISTERED
ARCHITECT
STEVEN A. MCCASLIN
RD
RD
RD RD
RD
RD
RD
RD
(E
S L O
P E
(E
S L O
P E
(E
S L O
P E
LOWER ROOF A
LOWER ROOF BLOWER ROOF C
LOWER ROOF D UPPER ROOF
102 102
102102
108108108
108 108
109 109
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
115 115
115115
TYP.
(E
S L O
P E
106104
134 134 129129
134104
128 104
134 135
104 134 135130 134
TYP.
(E
S L O
P E
(E
S L O
P E
(E
S L O
P E
(E
S L O
P E
APPROX. +30"
(E
S L O
P E
(E
S L O
P E
(E) SLOPE
ROOF LEGEND
PIPE VENT
SCUPPER
ROOF DRAIN
CAPPED VENTS
ROOF ACCESS HATCH
EXHAUST FANS
RD
PIPE VENT WITH BOOT
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND ROOF SLOPES
PRIOR TO DEMOLITION.
2. ALL ITEMS TO REMAIN (EQUIPMENT, UTILITIES, VENTS, ACCESSORIES,
ETC), PROTECT IN PLACE DURING CONSTRUCTION.
3. ALL ITEMS TO BE REMOVED & RE-INSTALLED, STORE & PROTECT
DURING CONSTRUCTION.
4. SEAL ALL PENETRATIONS THROUGH ROOF SUBSTRATE AND AT CURBS
PER SPEC SECTIONS 07 92 00 & 07 01 50.19.
5. DESIGN ROOF WITH A POSITIVE SLOPE MINIMUM 1/4" PER FT TO A
MAXIMUM OF 1" PER FT.
GENERAL NOTE:
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
U.S. Department of Veterans Affairs
Replace Roofing - Buildings 1, 2, 3, and 31
AA/ LR
AD-200
BLDG 2 ROOF DEMOLITION PLAN
668-24-103
SO
Mann-Grandstaff VA Medical Center 4815 North Assembly St, Spokane, Washington 99205
07.17.2026
100% CONSTRUCTION
DOCUMENTS
24028
3/16" = 1'-0"
Bldg 2 Demolition Roof Plan
Rev. Date Description
Key Notes
102 REMOVE (E) TPO ROOFING, ASSOCIATED RIGID
INSULATION, FLASHING & TERMINATION BARS, AS
APPLICABLE, DOWN TO THE CONCRETE ROOF DECK. PREP
AND REPAIR SUBSTRATE TO RECEIVE NEW ROOFING
ASSEMBLY. SEAL ALL PENETRATIONS THROUGH ROOF.
PROTECT (E) EQUIPMENT AND UTILITIES IN PLACE.
104 (E)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .