This is a comprehensive set of engineering drawings and technical specifications for a 213.2 kW direct current (DC) / 175.0 kW alternating current (AC) photovoltaic (PV) solar power system installation at a U.S. Department of the Interior, Fish and Wildlife Service property located at 13840 Highway 140, Livingston, California 95334.
The project involves installation of 520 SolarJuice Technology SA410-72MH5 410-watt solar modules mounted on OMCO Choice ground mounts at a 15-degree tilt angle and 180-degree orientation. The system utilizes three SMA inverters: two 62.5 kW SMA Tripower Core 1 units and one 50 kW unit, with integrated DC disconnects and ground fault protection. Electrical infrastructure includes a new 400-amp main distribution board, 300-amp main service breaker, 400-amp PV sub-panel with two 100-amp and one 80-amp three-pole circuit breakers, and a Siemens HF365NRA 400-amp fused AC disconnect with 300-amp fuses. The system is configured with 30 DC strings of solar modules delivering power through underground conduit runs (ranging from 35 to 150 feet) to the inverters, then to the main distribution board via the PV sub-panel. Wire sizing calculations specify 6 AWG, 4 AWG, 3 AWG, and 300 KCMIL copper conductors rated at 75 degrees depending on circuit location. All work must comply with 2019 California Building, Electrical, Energy, Fire, Mechanical, Plumbing, and Green Building codes. The contractor is ECOLECTRICS, located in Austin, Texas. Installation drawings include site maps, electrical one-line diagrams, wire size calculations, system labeling requirements with multiple warning and caution labels, property plan, attachment layout details, and manufacturer data sheets for inverters, modules, and racking systems.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP (SCALE: NTS)
SATELLITE VIEW (SCALE: NTS)
SHEET INDEX
SYSTEM RATING
MAIN SERVICE PANEL BUS SIZE:
MAIN SERVICE BREAKER SIZE:
RACKING: OMCO CHOICE GROUND MOUNT
BUILDING INFORMATION
CONSTRUCTION TYPE: V-B
OCCUPANCY: B
GENERAL NOTES
1. All electrical materials shall be new and listed by recognized electrical testing laboratory
Custom made equipment shall have complete test data submitted by the manufacturer attesting to its safety
2. Outdoor equipment shall be NEMA 3R rated or equivalent
3. All metallic equipment shall be grounded
4. Contractor shall obtain electrical permits prior to installation and shall coordinate all inspections, testing commissioning and acceptance with the client, utility co. and city inspectors as needed.
5. The electrical contractor shall verify the exact locations of service points and service sizes with the serving utility company and comply with all utility companies requirements.
6. Drawings are diagrammatic only, routing of raceways shall be option of the contractor unless otherwise noted and shall be coordinated with other trades.
7. If the roof material or the roof structure not adequate for PV installation, call the engineer of record print to installation. The contractor is responsible to verify that the roof is capable of withstanding the extra weight.
8. If the distances for cable runs are different than shown, the contractor shall notify the electrical engineer to validate the wire size. Final drawings will be red-lined and updated as appropriate.
9. Whenever a discrepancy in quality of equipment arises on the drawing or specifications, the contractor shall be responsible for providing and installing all materials and services required by the strictest conditions noted on the drawings or in the specifications to ensure complete compliance and longevity of the operable system required by the engineer of record.
PHOTOVOLTAIC NOTES:
1. Ground mounted photovoltaic panels and modules shall be tested, listed and identified by recognized testing laboratory
2. Solar system shall not cover any plumbing or mechanical vents
3. Modules and support structures shall be grounded unless racking has integrated ground.
4. Removal of an interactive inverter or other equipment shall not disconnect the bonding connection between the grounding electrode conductor and the photovoltaic source and/or output circuit grounded conductors.
5. All PV modules and associated equipment and wiring shall be protected from physical damage.
6. Live parts of PV source circuits and PV output circuits over 150v to ground shall not be accessible to other than qualified persons while energized.
7. Inverter is equipped with integrated DC disconnect, thus providing ground fault protection
8. All conductors shall be copper and 75 deg rated
9. A single conductor shall be permitted to be used to perform the multiple functions of dc grounding, AC grounding and bonding between AC and DC systems.
10. Non-current carrying metal parts of equipment shall be effectively bonded together. Bond both ends of raceways.
400A
DC 213.200 KW STC
AC 175.000 KW STC
SITE MAP & PV LAYOUT
ELECTRICAL 1-LINE DIAGRAM
ATTACHMENT LAYOUT
SYSTEM LABELING DETAIL
INVERTER DATA SHEET
PROPERTY PLAN
MODULE DATA SHEET
RACKING DATA SHEET
PV 1.0
PV 2.0
PV 3.0
PV 4.0
PV 5.0
D 6.0
D 7.0
D 8.0
EQUIPMENT SUMMARY
PV MODULES:
SOLARJUICE TECHNOLOGY, SA410-72MH (Qty: 520)
INVERTERS:
SMA TRIPOWER CORE 1 62.5 KW (QTY: 2) SMA
TRIPOWER CORE 1 50 KW (QTY: 1)
AC DISCONNECT:
SIEMENS HF365NRA (QTY: 1)
ELECTRICAL INFORMATION
NEW UPGRADED
300A
US Department of the Interior, Fish and Wildlife Service
New@engineerinc.io 01/10/2023
Site:
Owner:
Property Address:
Property Type:
Drawn by:
Date:
NE NE NE 3 8 11 - 13840 HWY 140, LIVINGSTON, CA, 95334
Commercial
GOVERNING CODES
CONTRACTOR
ECOLECTRICS
Address:275 Lotus Circle
Austin, TX 78737
Phone number: 512-717-0660 info@ecolectricsusa.com
WIRE SIZE CALCULTION PV 2.1
THE INSTALLATION OF SOLAR ARRAYS AND
PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH
THE FOLLOWING CODES:
· 2019 California Building Code
· 2019 California Residential Code
· 2019 California Green Building Standard Code
· 2019 California Plumbing Code
· 2019 California Mechanical Code
· 2019 California Electrical Code
· 2019 California Fire Code
· 2019 California Energy Code
· 2016 International Property Maintenance Code
ALL OTHER ORDINANCE ADOPTED BY THE
LOCAL GOVERNING AGENCIES
PG&E SERVICE ADDRESS
NE NE NE 3 8 11 - 13840 HWY 140, LIVINGSTON, CA 95334
PG&E METER SOLAR IS BEING TIED TO:
1010278561
Snobird
FENCE GATE
22'
22'
22'
22'
String#1,#2 -18 Modules
String#3,#4 -18 ModulesString#9,#10 -16 Modules
String#7,#8 -18 ModulesString#11,#12 -16 Modules
String#17,#18 -18 ModulesString#15,#16 -18 ModulesString#13,#14 -16 Modules
String#23,#24 -18 ModulesString#21,#22 -18 ModulesString#19,#20-16 Modules
String#29,#30 -18 ModulesString#27,#28 -18 ModulesString#25,#26 -16 Modules
AC
MDB
30'
E a s t
S i d e
C a n a l
Solar PV Array 5
104 - Solar4 America 410 Watt Modules
OMCO Choice Ground Mount: 15 Deg
Orientation:180 Deg
Solar PV Array 4
104 - Solar4 America 410 Watt Modules
OMCO Choice Ground Mount: 15 Deg
Orientation:180 Deg
Solar PV Array 3
104 - Solar4 America 410 Watt Modules
OMCO Choice Ground Mount: 15 Deg
Orientation:180 Deg
Solar PV Array 2
104 - Solar4 America 410 Watt Modules
OMCO Choice Ground Mount: 15 Deg
Orientation:180 Deg
Solar PV Array 1
104 - Solar4 America 410 Watt Modules
OMCO Choice Ground Mount: 15 Deg
Orientation:180 Deg
IN3
IN2
IN1PVS
(N) AC wiring ~150'
Underground run
3" Schedule # 40 PVC Pipe
18" Min depth
ADU
String#5,#6 -18 Modules
EXISTING PG&E
UTILITY POLE
(N) DC Wiring ~70’ (1” Schedule #40 PVC Pipe)
Strings 9 & 10 underground run to IN2
(N) DC Wiring ~ 35’ (1-1/4” Schedule #40 PVC Pipe)
Strings 5 to 8 underground run to IN1
(N) COMM Wiring ~ 70’ (3/4” Schedule #40 PVC Pipe)
Communication Line from IN1 to IN2
X 18” Min Depth
(N) DC Wiring ~ 35’ (1” Schedule #40 PVC Pipe)
Strings 11 & 12 underground run to IN2
(N) AC Wiring ~ 70’ (1-1/4” Schedule #40 PVC Pipe)
IN2 underground run to PVS
18” Min Depth
(N) DC Wiring ~ 35’ (1” Schedule #40 PVC Pipe)
Strings 19 & 20 underground run to IN2
(N) AC Wiring ~ 105’ (1-1/4” Schedule #40 PVC Pipe)
IN3 underground run to PVS
(N) COMM Wiring ~ 35’ (3/4” Schedule #40 PVC Pipe)
Communication Line from IN2 to IN3
18” Min Depth
(N DC Wiring ~ 35’ (1-1/2” Schedule #40 PVC Pipe)
Strings 25 to 30 underground run to IN3
18” Min Depth
SITE MAP & PV
LAYOUT
PV 1.0
PV SYSTEM AS INDICATED
Scale:Project:
SOLAR MODULES
Model #S4A410-72MH5
EMT type Conduit
Solar Module
___ SolarJuice Technology Inc. 410 Watt
INDEX
Drawn by:New@engineerinc.io
DATE:
01/10/2023
Project Name:
US Department of the Interior, Fish and Wildlife Service Property Adress:
SNOBIRD, NE NE NE 3 8 11 - 13840 HWY
140, LIVINGSTON, CA, 95334
INVERTER
INVERTER TYPE: Central:
SMA 50.0kW Inverter
Model #SUNNY TRIPOWER
CORE1 50-US (277/480)
INVERTER TYPE: Central:
SMA 62.5kW Inverter
Model #SUNNY TRIPOWER
CORE1 62-US (277/480)
MDB (N) Main Distribution Board400A
(N) Inverter1IN1
PVS..........(N) 400A PV Sub Panel
CONTRACTOR
ECOLECTRICS
Address:275 Lotus Circle
Austin, TX 78737
Phone number: 512-717-0660 info@ecolectricsusa.com
AC............(N) 400A AC Disconnect
PVC type AC Conduit
PVC type DC Conduit
(N) Inverter2IN2
(N) Inverter3IN3
Communication Line
SCALE: 1/16" = 1'-0"
180 °
90 °
270 °
0°
S
W
N
E
Exp. Date: 06/30/2024
Date Certified and Signed:01/10/2023
G
Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________E21531 06/30/2024
PV 2.0
PV SYSTEM AS INDICATED
Scale:Project:
ELECTRICAL 1-LINE
DIAGRAM
Drawn by:New@engineerinc.io
DATE:
01/10/2023
Project Name:
US Department of the Interior, Fish and Wildlife Service Property Adress:
SNOBIRD, NE NE NE 3 8 11 - 13840 HWY
140, LIVINGSTON, CA, 95334
SMA
Inverter #1
MAKE: SMA AMERICA;
MODEL: STP 50-US-41 [480V]
1 18
STRING 1
1 182
1 18
STRING 3
1 182
STRING 4
STRING 2
1 182
STRING 5
1 182
STRING 6
1 182
STRING 7
1 182
STRING 8
(3) #4 AWG THWN/THWN-2
(1) #8 AWG THWN/THWN-2
(1) #8 AWG GND
1 1/4" EMT, 15 FEET
CONTRACTOR
ECOLECTRICS
Address:275 Lotus Circle
Austin, TX 78737
Phone number: 512-717-0660 info@ecolectricsusa.com
SMA
Inverter #2
MAKE: SMA AMERICA;
MODEL: STP 62-US-41 [480V]
1 16
STRING 13
1 162
1 18
STRING 15
(24) #10 AWG PV WIRE,
(1) #8 AWG GND
2" EMT, 5 FEET
1 182
STRING 16
STRING 14
1 182
STRING 17
1 182
STRING 18
PV MODULES
MAKE: SOLARJUICE TECHNOLOGY INC.
MODEL: SA410-72MH5
QTY: 144
1 16
STRING 9
1 162
1 16
STRING 11
1 162
STRING 12
STRING 10
1 16
STRING 19
1 162
STRING 20
SMA
Inverter #3
MAKE: SMA AMERICA;
MODEL: STP 62-US-41 [480V]
STRING 21
118 2
STRING 23
118 2
STRING 24
STRING 22
STRING 25
116 2
STRING 27
118 2
STRING 28
STRING 26
118 2
STRING 29
118 2
STRING 30
PV DISTRBT. PANEL
400A , 277/480V
INSTALL (2)100A PV
3-POLE C/B
INSTALL 80A PV
3-POLE C/B
400A FUSED AC DISCONNECT
WITH 300A FUSES,
LOCKABLE,BLADE TYPE,
277/480V
NEW
MAIN C/B
300A
(N) GROUNDING
ELECTRODE SYSTEM
MAIN METER
NEW UPGRADED
______ MAIN
DISTRIBUTION
BOARD
277/480V, 3P, 4W
400A
LINE SIDE TAP
(3) #3 AWG THWN/THWN-2
(1) #8 AWG THWN/THWN-2
(1) #8 AWG GND
1 1/4" EMT, 15 FEET
(3) #3 AWG THWN/THWN-2
(1) #8 AWG THWN/THWN-2
(1) #8 AWG GND
1 1/4" EMT, 15 FEET
(3) #3 AWG THWN/THWN-2
(1) #8 AWG THWN/THWN-2
(1) #8 AWG GND
1 1/4" EMT, 15 FEET
(3) #300 KCMIL
(1) #4 AWG THWN/THWN-2
(1) #4 AWG GND
3" EMT, 15 FEET
(3) #300 KCMIL
(1) #4 AWG THWN/THWN-2
(1) #4 AWG GND
3" EMT, 15 FEET
(N) AC wiring ~150'
Underground run
3" Schedule # 40 PVC Pipe
18" Min depth
(N) DC Wiring ~70’ (1” Schedule #40 PVC Pipe)
Strings 9 & 10 underground run to IN2
(N) DC Wiring ~ 35’ (1-1/4” Schedule #40 PVC Pipe)
Strings 5 to 8 underground run to IN1
(N) COMM Wiring ~ 70’ (3/4” Schedule #40 PVC Pipe)
Communication Line from IN1 to IN2
X 18” Min Depth
(N) DC Wiring ~ 35’ (1” Schedule #40 PVC Pipe)
Strings 11 & 12 underground run to IN2
(N) AC Wiring ~ 70’ (1-1/4” Schedule #40 PVC Pipe)
IN2 underground run to PVS
18” Min Depth
(N) DC Wiring ~ 35’ (1” Schedule #40 PVC Pipe)
Strings 19 & 20 underground run to IN2
(N) AC Wiring ~ 105’ (1-1/4” Schedule #40 PVC Pipe)
IN3 underground run to PVS
(N) COMM Wiring ~ 70’ (3/4” Schedule #40 PVC Pipe)
Communication Line from IN2 to IN3
18” Min Depth
(N DC Wiring ~ 35’ (1-1/2” Schedule #40 PVC Pipe)
Strings 25 to 30 underground run to IN3
18” Min Depth
(2) #10 AWG PV WIRE,
(1) #8 AWG GND
(8) #10 AWG PV WIRE,
(1) #8 AWG GND
(4) #10 AWG PV WIRE,
(1) #8 AWG GND
(4) #10 AWG PV WIRE,
(1) #8 AWG GND
(4) #10 AWG PV WIRE,
(1) #8 AWG GND
(12) #10 AWG PV WIRE,
(1) #8 AWG GND
PV MODULES
MAKE: SOLARJUICE TECHNOLOGY INC.; MODEL: SA410-72MH5; QTY: 200
PV MODULES
MAKE: SOLARJUICE TECHNOLOGY INC.; MODEL: SA410-72MH5; QTY: 176
Exp. Date: 06/30/2024
Date Certified and Signed:01/10/2023
G
Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the State of California.
License No. ____________, Expiration Date: _______________E21531 06/30/2024
AC DISCONNECT
MAKE: SEIMENS
MODEL: HF365NRA
QTY: 1
PG&E METER NO:
1010278561
Scale:Project:
Drawn by:New@engineerinc.io
DATE:
01/10/2023
Project Name:
US Department of the Interior, Fish and Wildlife Service Property Adress:
SNOBIRD, NE NE NE 3 8 11 - 13840 HWY
140, LIVINGSTON, CA, 95334
WIRE SIZE
CALCULATION
CONTRACTOR
ECOLECTRICS
Address:275 Lotus Circle
Austin, TX 78737
Phone number: 512-717-0660 info@ecolectricsusa.com
PV ARRAY RATING WIRE SIZE CALCULATION
PV ARRAY FROM JUNCTION BOX TO INVERTER
Number Modules 520 Type S4A410-72MH5 Solar4 America 410Watt Maximum Current (A) 10.61
Number Inverters 1 SMA 50kW Inverter
SUNNY TRIPOWER
CORE1 50-US (480V) Considers Continuous (A)
10.61 * 1.25 = 13.26
Number Inverters 2 SMA 62.5kW Inverter
SUNNY TRIPOWER
CORE1 62.5-US (480V) Short Circuit Current (A)
13.2625 * 1.25 = 16.58
Total DC Wattage (Watts) Watts STC, (Watts/Module) 520 * 410 = 213200 Raceway Height From Roof (Temp 39+22=61C) 3 1/2" Array Currents I-SC 10.61 A I-MP 10.54 A Temp. Derate Factor (A) 16.58 / 0.71 = 23.35 Module Voltage V-OC 49.1 V V-MP 40.9 V #of wire(#of Strings*2) 24 SYSTEM POWER More Than 3 CCC Adjist. Factor 0.45 Number Of Strings 12 Max Number of Modules Per String 18 Adjusted Conductor Ampacity(A) 23.35 / 0.45 = 51.89
1000V Calculation 49.1 * 18 * 1.12 = 989.86 <= 1000V Max AC Voltage 277/480V Wire Size from NEC Table 310.15(b)16 6 AWG
FROM INVERTER 1 TO PV
SUB PANEL Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a) 0.71 Total Current (A) 64 Max Input Power (Watts) 50000 Consider Continuous (A) 64 * 1.25 = 80 Temperature Adjustment 80 / 0.91 = 87.91 (A) Conductor Size From NEC Table 310.16 4 AWG
FROM INVERTER 2 TO PV SUB PANEL
Total Current (A) 79.5 Total AC Wattage (Watts) 62500
Consider Continuous (A) 79.5 * 1.25 =
99.375 Temperature Adjustment 99.375 / 0.91 = 109.2 (A) Conductor Size From NEC Table 310.16 3 AWG
FROM PV SUB PANEL TO
MAIN DISTRIBUTION BOARD
Total Current (A) 64 + (79.5X2) = 223 Max Input Power (Watts) 175000
Consider Continuous (A) 143.5 * 1.25 =
278.75 Temperature Adjustment 278.75 / 0.91 = 306.31 A Conductor Size From NEC Table 310.16 300 KCMIL
FROM INVERTER 3 TO PV SUB PANEL
Total Current (A) 79.5 Total AC Wattage (Watts) 62500
Consider Continuous (A) 79.5 * 1.25 =
99.375 Temperature Adjustment 99.375 / 0.91 = 109.2 (A) Conductor Size From NEC Table 310.16 3 AWG
PV 2.1
Exp. Date: 06/30/2024
Date Certified and Signed:01/10/2023
G
Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed
SYSTEM
LABELING DETAIL
PV 3.0
PV SYSTEM AS INDICATED
Scale:Project:
Drawn by:New@engineerinc.io
DATE:
01/10/2023
Project Name:
US Department of the Interior, Fish and Wildlife Service Property Adress:
SNOBIRD, NE NE NE 3 8 11 - 13840 HWY
140, LIVINGSTON, CA, 95334
CONTRACTOR
ECOLECTRICS
Address:275 Lotus Circle
Austin, TX 78737
Phone number: 512-717-0660 info@ecolectricsusa.com
(STICKER TO BE LOCATED ON
CONDUIT WITH DC CURRENT
EVERY 4' HORIZONTALLY OR
10' VERTICALLY AND 1' FROM
EACH SIDE OF A BEND)
(TO BE LOCATED ON
SUB-PANEL ONLY
WHEN SUB-PANEL IS
DEDICATED FOR PV ONLY)
(STICKER LOCATED
INSIDE PANEL
NEXT TO SOLAR BREAKER)
(STICKER LOCATED
INSIDE PANEL
BELOW PV BREAKER)
PV ARRAY
J BOX
INVERTER
INTEGRATED
DC DISCONNECT
PV SUB-PANEL
* if applicable
SUB-PANEL
* if applicable
AC
DISCONNECT
* if applicable
METER
MAIN SERVICE
PANEL
*if applicable
(STICKER LOCATED
ON THE PV SUB PANEL)
CAUTION
AUTHORIZED SOLAR
PERSONNAL ONLY!
CAUTION
SOLAR DC CURRENT PRESENT
DURING DAYLIGHT HOURS
WARNING!
ELECTRIC SHOCK HAZARD.
IF GROUND FAULT IS INDICATED,
NORMALLY GROUNDED
CONDUCTORS MAY BE
UNGROUNDED AND ENERGIZED.
DC DISCONNECT
DC PHOTOVOLTAIC POWER SOURCE
RATED MAX POWER POINT CURRENT- AMPS
RATED MAX POWER POINT VOLTAGE- VOLTS
MAXIMUM SYSTEM VOLTAGE- VOLTS
SHORT CIRCUIT CURRENT- AMPS
WARNING!
ELECTRIC SHOCK HAZARD.
DO NOT TOUCH THE TERMINALS.
TERMINALS ON BOTH THE LINE AND
LOAD SIDES MAY BE ENERGIZED IN
THE OPEN POSITION.
PV LOAD CENTER SIZED FOR PV
BREAKERS ONLY OR RENDERED UNABLE
TO ACCEPT ANY ADDITIONAL LOADS.
PV SUB-PANEL ONLY
AC DISCONNECT
AC PHOTOVOLTAIC POWER SOURCE
RATED AC OUTPUT CURRENT: A MAX
NOMINAL AC OPERATING VOLTAGE: 480 Vac
THIS PANEL FED BY
MULTIPLE SOURCES
(UTILITY & SOLAR)
SOLAR
WARNING!
INVERTER OUTPUT CONNECTION. DO NOT
RELOCATE THIS OVERCURRENT DEVICE
Permanent directory or plaque providing location of service disconnecting means and photovoltaic system disconnecting means, if not located at the same location. (Plaques shall be metal or plastic, with engraved or machine printed letters, or electro-photo plating, in a contrasting color to the plaque.
Plaques shall be permanently attached to the equipmenq or in the required location using an approved method that is suitable to withstand the environment to which it is exposed. Plaques and signage shall meet legibility, defacemet, exposure and adhesion requirements of Underwriters
Laboratories marking and labeling system 969(UL969).
278.75
LABEL 1 LABEL 2 LABEL 3 LABEL 4 LABEL 5 LABEL 6
LABEL 7 LABEL 8 LABEL 9 LABEL 10 LABEL 11
LABEL 12
4 51
DIRECTORY
MARKINGS, LABELS AND WIRING SIGNS
A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating solar electric system.
This can facilitate identifying energized electrical lines that connect solar panels to the inverter, as these should not be cut when venting for smoke removal
B. Main Service Disconnect.
1. Residential buildings - The marking main be placed within the main service disconnect. The marking shall be placed outside cover if the main service disconnect is operable with the service panel closed.
2. Commercial buildings - Tha marking shall be placed adjacent to the main service disconnect clearly visible from the location where the level is operated
3. Markings: Verbiage, Format and Type of Material.
a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED
b. Format: White lettering on a red background. Minimum 3/8 inches letter height. All letters shall be capitalized. Arial or similar font, non bold.
c. Material: Reflective, weather resistant material suitable for the environment (use UL - 969 as standard for weather rating). Durable adhesive materials meet this requirement.
C.Marking Requirements on DC conduit, raceways, enclosures, cable assemblies, DC combiners and junction boxes:
1. Markings: Verbiage, Format and Type of Material.
a. Placement : Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turns, above and for below penetrations, all DC combiners and junction boxes
b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material shall adhere to "V. V-3b, c" of this requirement.
c. Inverters are not required to have caution markings
1.Marking is required on all interior and exterior DC conduit raceways,enclosures,cable assemblies,and junction boxes,combiner boxes and disconnects.
2.The materials used for marking shall be reflective,weather resistant material suitable for the environment.
Minimum 3/8 "letter height; all upper case letters Arial or similar font; Red background with white lettering.
3.Marcking shall contain the words: WARNING : PHOTOVOLTAIC POWER SOURCE.
4.Marking shall be placed adjacent to the main service disconnect in a location clearly visible from the location where the disconnect is operated
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SHUT DOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD
IN THE ARRAY
SOLAR ELECTRIC
PV PANELS
Exp. Date: 06/30/2024
Date Certified and Signed:01/10/2023
G
Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed
22'
22'
30'
B e r r e e k
E a s t
S i d e n a l
2521'-10"
2035'
762'-4"
383'-4"
1130'-8"
1590'-10"
1440'-3"
1508'-9"
541'-11"
1279'-2"
DRIVEWAY
PROPERTY LINE
AC
MDB
ADU
EXISTING PG&E
UTILITY POLE
PVS
FENCE
GATE
30'
PROPERTY PLAN
PV 4.0
PV SYSTEM AS INDICATED
Scale:Project:
Drawn by:New@engineerinc.io
DATE:
01/10/2023
Project Name:
US Department of the Interior, Fish and Wildlife Service Property Adress:
SNOBIRD, NE NE NE 3 8 11 - 13840 HWY
140, LIVINGSTON, CA, 95334
CONTRACTOR
ECOLECTRICS
Address:275 Lotus Circle
Austin, TX 78737
Phone number: 512-717-0660 info@ecolectricsusa.com
MSP Main Distribution Board
Inverter1IN1
PVS ....................... PV Sub Panel
AC......................... AC Disconnect
Solar Module
Inverter2IN2
Inverter3IN3
SCALE: 1/128" = 1'-0"
180 °
90 °
270 °
0°
S
W
N
E
SNOBIRD SITE
12.9'
8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8'
PRE-ASSEMBLED TILT BRACKETRY SUB-ASSEMBLY
BEAM
FLANGED BOLT
168.91'
12.9'
8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8'
PRE-ASSEMBLED TILT BRACKETRY SUB-ASSEMBLY
BEAM
FLANGED BOLT
168.91'
12.9'
8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8'
PRE-ASSEMBLED TILT BRACKETRY SUB-ASSEMBLY
BEAM
FLANGED BOLT
168.91'
12.9'
8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8'
PRE-ASSEMBLED TILT BRACKETRY SUB-ASSEMBLY
BEAM
FLANGED BOLT
168.91'
12.9'
8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8'
PRE-ASSEMBLED TILT BRACKETRY SUB-ASSEMBLY
BEAM
FLANGED BOLT
168.91'
22'
22'
22'
22'
ATTACHMENT
LAYOUT
PV 5.0
PV SYSTEM AS INDICATED
Scale:Project:
Drawn by:New@engineerinc.io
DATE:
01/10/2023
Project Name:
US Department of the Interior, Fish and Wildlife Service Property Adress:
SNOBIRD, NE NE NE 3 8 11 - 13840 HWY
140, LIVINGSTON, CA, 95334
CONTRACTOR
ECOLECTRICS
Address:275 Lotus Circle
Austin, TX 78737
Phone number: 512-717-0660 info@ecolectricsusa.com
BEAM
FLANGED BOLT
SOLAR MODULE
BEAM
SOLAR MODULE
FLANGED BOLT
W/STAR WASHER
PRE-ASSEMBLED TILT BRACKETRY
SUB-ASSEMBLY
PRE-ASSEMBLED TILT BRACKETRY
SUB-ASSEMBLY
GRADE
FLANGED NUT
MIN 2'-6"
PRE-ASSEMBLED TILT BRACKETRY
SUB-ASSEMBLY
SOLAR MODULE
BEAM
FLANGED NUT
FLANGED BOLT W/SERRATED FLANGE NUTS
8'-8"
4'-11"
12.9'
BEAM
SOLAR MODULE
SMA INVERTER
PRE-ASSEMBLED TILT BRACKETRY
SUB-ASSEMBLY
INVERTER
DATA SHEET
D 6.0
PV SYSTEM AS INDICATED
Scale:Project:
Drawn by:New@engineerinc.io
DATE:
01/10/2023
Project Name:
US Department of the Interior, Fish and Wildlife Service Property Adress:
SNOBIRD, NE NE NE 3 8 11 - 13840 HWY
140, LIVINGSTON, CA, 95334
CONTRACTOR
ECOLECTRICS
Address:275 Lotus Circle
Austin, TX 78737
Phone number: 512-717-0660 info@ecolectricsusa.com
D 7.0
Scale:Project:
Drawn by:New@engineerinc.io
DATE:
01/10/2023
Project Name:
US Department of the Interior, Fish and Wildlife Service Property Adress:
SNOBIRD, NE NE NE 3 8 11 - 13840 HWY
140, LIVINGSTON, CA, 95334
MODULE
DATA SHEET
CONTRACTOR
ECOLECTRICS
Address:275 Lotus Circle
Austin, TX 78737
D 8.0
Scale:Project:
Drawn by:New@engineerinc.io
DATE:
01/10/2023
Project Name:
US Department of the Interior, Fish and Wildlife Service Property Adress:
SNOBIRD, NE NE NE 3 8 11 - 13840 HWY
140, LIVINGSTON, CA, 95334
RACKING
DATA SHEET
CONTRACTOR
ECOLECTRICS
Address:275 Lotus Circle
Austin, TX 78737
| Sheets and Views |
| NFWS San Luis Snobird Solar Drawings-0 |
| NFWS San Luis Snobird Solar Drawings-1 |
| NFWS San Luis Snobird Solar Drawings-2 |
| NFWS San Luis Snobird Solar Drawings-+12 |
| NFWS San Luis Snobird Solar Drawings-3 |
| NFWS San Luis Snobird Solar Drawings-4 |
| NFWS San Luis Snobird Solar Drawings-5 |
| NFWS San Luis Snobird Solar Drawings-6 |
| NFWS San Luis Snobird Solar Drawings-7 |
| NFWS San Luis Snobird Solar Drawings-8 |
Untitled
File details come from the government source that posted it. Updated .