Attachment 3. Schedule Of Items.docx
DOCX document 25 KB Posted
- Attached to
- Forest Service - ARA, Buckhorn Road Repairs
- Solicitation number
- 127EAW26Q0004
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items document for the ARA Buckhorn Road Repairs project at Los Padres National Forest, California. The schedule outlines all line items and quantities required for the road repair work, organized into two sections covering different mile post locations (MP 1.4 and MP 3.9). Base items at MP 1.4 include mobilization, construction survey and staking, contractor testing, soil erosion and pollution control, roadway excavation and waste disposal (203.05 cubic yards), geosynthetic separation geotextile (50 square yards), grouted riprap (16.5 cubic yards), aggregate surface course (0.5 cubic yards), roadbed reconditioning with asphalt surface cleaning, delineators (2 each), and temporary traffic control. The MP 3.9 section encompasses a more extensive scope including mobilization, retaining wall survey and staking, contractor testing, soil erosion control, removal of steel rail fence, waste disposal (340 cubic yards), separation geotextile (180 square yards), structural backfill materials (including 100 cubic yards imported select granular and 650 cubic yards structural backfill), structure excavation (990 cubic yards), placed riprap (60 cubic yards), precast concrete retaining wall blocks (1,125 square feet), aggregate base (30 cubic yards), aggregate surface course (8 cubic yards), barbed wire fence (230 linear feet), rolled erosion control products (500 square yards), and temporary traffic control.
The document specifies that all quantities are estimated and contractors must field verify to satisfy requirements of the drawings, statement of work, and specifications. Contractors are required to submit pricing for all items, and one award will be made from this solicitation. A Bid Bond or Guarantee is required for proposals exceeding $150,000 in accordance with FAR 52.228-1, with bond premium costs to be included in the contract price rather than added separately. Contractors must complete a table providing company name, address, UEI number, point of contact information, phone number, email, and tax identification number as part of their quote submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
ARA, Buckhorn Road Repairs
| Item No. |
| Subitem No. |
Description Quantity Order
Unit Unit Price
Amount
Base Items FS 9N11.1 Mile Post 1.4
| 001 |
| 15101 |
| Mobilization |
| 1 |
| LS |
| 002 |
| 15201 |
| Construction Survey and Staking |
| 1 |
| LS |
| 003 |
| 15401 |
| Contractor Testing |
| 1 |
| LS |
| 004 |
| 15713 |
| Soil Erosion and Pollution Control |
| 1 |
| LS |
| 005 |
| 20407 |
| Roadway Excavation and Waste Disposal method 203.05 A |
| 9 |
| CY |
| 006 |
| 20701 |
| Earthwork geosynthetics, Separation geotextile, Nonwoven, Class 1, Type B |
| 50 |
| SY |
| 007 |
| 25107 |
| Grouted Riprap, Class 3 |
| 16.5 |
| CY |
| 008 |
| 30112 |
| Aggregate surface course (Shoulder), Grading S, compaction method E |
| 0.5 |
| CY |
| 009 |
| 30310 |
| Roadbed Reconditioning- Asphalt Surface Cleaning |
| 1 |
| LS |
| 010 |
| 63308 |
| Delineator |
| 2 |
| Each |
| 011 |
| 63501 |
| Temporary Traffic Control |
| 1 |
| LS |
SUB-TOTAL MP 1.4
| 012 |
| 15101 |
| Mobilization |
| 1 |
| LS |
| 013 |
| 15206 |
| Retaining Wall Survey and Staking |
| 1 |
| LS |
| 014 |
| 15401 |
| Contractor Testing |
| 1 |
| LS |
| 015 |
| 15713 |
| Soil Erosion and Pollution Control |
| 1 |
| LS |
| 016 |
| 20301 |
| Removal of Steel Rail Fence, Disposal method 203.05 A |
| 1 |
| LS |
| 017 |
| 20429 |
| Waste, Disposal method 203.05 A |
| 340 |
| CY |
| 018 |
| 20701 |
| Earthwork geosynthetics, Separation geotextile, Nonwoven, Class 1, Type B |
| 180 |
| SY |
| 019 |
| 20803 |
| Structural backfill, type imported select granular backfill |
| 100 |
| CY |
| 020 |
| 20858 |
| Structure excavation |
| 990 |
| CY |
| 021 |
| 20859 |
| Structural backfill |
| 650 |
| CY |
| 022 |
| 25102 |
| Placed Rip Rap, Class 6 |
| 60 |
| CY |
| 023 |
| 25802 |
| Precast Concrete Retaining Wall Blocks Purchased, Delivered and Installed |
| 1125 |
| SF |
| 024 |
| 30103 |
| Aggregate base, grading C, compaction method E |
| 30 |
| CY |
| 025 |
| 30112 |
| Aggregate surface course (Shoulder), Grading S, compaction method E |
| 8 |
| CY |
| 026 |
| 61901 |
| Furnish and install, Barbed Wire Fence, 4-Wire |
| 230 |
| LF |
| 027 |
| 62901 |
| Rolled Erosion Control Product |
| 500 |
| SY |
| 028 |
| 63501 |
| Temporary Traffic Control |
| 1 |
| LS |
SUB-TOTAL MP 3.9
| PROJECT TOTAL |
| $ |
SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* One award will be made from this solicitation, contractors must submit pricing for all items.
* Bid Bond/Guarantee. REQUIRED for proposals exceeding $150,000 IAW FAR 52.228-1 Bid Guarantee.
NOTE: Payment for bond premiums shall not be in addition to the contract price.
The contractor shall complete the table below and include the information with their quote.
Company Name:
Company Address:
UEI Number:
POC Name and Title:
Phone Number:
Email:
Tax ID:
File details come from the government source that posted it. Updated .