Attachment 3. PMTL (Valve & Patrol, Leakage Survey).pdf

PDF 227 KB Posted

Attached to
Natural Gas Line Inspection, Test, Maintenance Services, Osan AB
Solicitation number
W90VN6-25-Q-A011
Issued by

About this file

The image is an Adobe PDF portfolio launch screen recommending users open the document in Acrobat X or Adobe Reader X (or later versions). The screen displays the Adobe PDF logo and includes a "Get Adobe Reader Now!" button. This appears to be an initial landing page for accessing a PDF document related to a federal contract opportunity.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

3/28/24, 8:24 AM PMTL G3065310195016

https://usaf.dps.mil/teams/10758/PMTL/Module/PMTL Details.aspx?EID=121 1/1

Equipment Type: G3065310195016 PMTL Source: AFPMTL - PDR Policy Driven Requirement

Component: Natural Gas (Distribution System - Leakage Survey) Short Title: Natural Gas (DS-Leakage Survey)

Work Group: WFSM

Equipment Component

Status: Approved - PDR Policy Driven Requirement as of 06/24/2019

0 Ref: AFMAN 32-1067 NOTE: Developed by using 49CFR Part 192, Subpart M 0 0 0 X

1 Collect maps, communication equipment, tools, safety equipment. 0 4 0.066 X

2 Use maps to locate natural gas pipelines, valves and meters 0 0 0.1 X

3 Inspect above ground natural gas pipeline for leaks, rust corrosion, loose connections and damage (est time per 10 ft of pipeline) 0 0 0.1 X

Inspect area of underground pipeline for dirt blowing into the air, persistent bubbling in standing water, or discolored or dead vegetation around the pipeline area indicating gas leaks (est time per 10 ft of pipeline)

0 0 0.1 X

5 Clean natural gas system area after maintenance 0 0 0.1 X

6 Update gas line map, mark changes as required 0 0 0.1 X

7 Report map updates to local Engineering office 0 0 0.166 X

8 Fill out maintenance checklist, compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s) 0 0 0.166 X

Annually 0 4 0.898

Step PM Components (Task Description) Hours Minutes Labor-hrs A

3/28/24, 8:26 AM PMTL G3065310195017

https://usaf.dps.mil/teams/10758/PMTL/Module/PMTL Details.aspx?EID=122 1/1

Equipment Type: G3065310195017 PMTL Source: AFPMTL - PDR Policy Driven Requirement

Component: Natural Gas (Distribution System - Valve & Patrol) Short Title: Natural Gas(DSValve and Patrol)

Work Group: WFSM

Equipment Component

Status: Approved - PDR Policy Driven Requirement as of 02/27/2015

0 Ref: AFMAN 32-1067 NOTE: Developed by using 49CFR Part 192, Subpart M 0 0 0 X X

1 Collect maps, communication equipment, tools, safety equipment. 0 0 0.044 X X

Visually inspect distribution line route for abnomality, ground disturbance or ground movement. If abnormality is presence, further investigation is recommended to determine if additional action is required

0 0 0.5 X X

3 Check location and identification of gas valves 0 0 0.1 X

4 Inspect pressure valve operation and check for clogged vents or screens 0 0 0.1 X

5 Inspect reducing valve operation and check for clogged vents or screens 0 0 0.1 X

6 Inspect and lubricate sectional shut off valves per valve 0 0 0.1 X

7 Inspect gas cut-off valve operation and check for damage & accessibility 0 0 0.1 X

8 Test valve or meter for leaks using soap solution. If leak is present, annotate for work order repair 0 0 0.1 X

9 Check and calibrate gas meters 0 0 0.1 X

10 Test meter or valve pit for gas leak and clean as needed 0 0 0.1 X

11 Clean natural gas system area after maintenance 0 0 0.1 X

12 Update gas line map, mark changes as required 0 0 0.1 X X

13 Report changes to drafting NCOIC (include markup map) 0 0 0.1 X

14 Submit job order to repair defect 0 0 0.1 X X

15 Fill out maintenance checklist, compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s) 0 0 0.167 X X

Semi-Annually 0 0 0.911

Annually 0 0 1.911

Step PM Components (Task Description) Hours Minutes Labor-hrs S A