ATTACHMENT 3 - Distribution Plan.pdf

PDF 116 KB Posted

Attached to
Economical Storage of Gasoline Blendstock in the Northeast Gasoline Supply Reserve
Solicitation number
89243522RFE000021
Issued by

About this file

This document contains an attachment outlining a distribution plan and a related federal contract opportunity solicitation. The distribution plan attachment provides details on storage facilities including terminal addresses and storage capacities. It also lists distribution facilities including barge docks, truck racks, and pipeline connections. Procedures are outlined for sale preparation, scheduling of deliveries, inspection and issue of product, and quantity measurement. A terminal data sheet is included as an attachment providing location information, waterfront and delivery details, and remarks on restrictions.

The related federal contract opportunity solicitation is seeking contracts for the economical storage and distribution of 1,000,000 barrels of gasoline blendstock in the Northeast Gasoline Supply Reserve. Depending on location, the ready-for-blending stock will consist of either CBOB or RBOB. The solicitation is issued by the Department of Energy Office of Fossil Energy.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

DISTRIBUTION PLAN

A. Introduction B. Storage Facilities:

1. Terminal Address

2. Total product storage capacity

C. Distribution Facilities:

1. Marine (Barge docks, Tanker docks)

2. Truck Racks

3. Pipeline Connections

4. Other Terminals

5. Terminal Data Sheet (see attached) D. Distribution Procedures

1. DOE responsibilities. (To be added by DOE at contract award)

2. QAR responsibilities. (To be added by DOE at contract award)

3. Storage Contractor responsibilities:

a. Sale Preparation

b. Scheduling of Deliveries

c. Inspection and Issue of Product

d. Quantity Measurement Procedures

E. Purchaser Responsibilities (To be added by DOE)

1. Scheduling of Deliveries

2. Inspections and Receipt

Attachment: Terminal Data Sheet

Terminal Data Sheet

Name: Terminal Contractor:

Location: Terminal Manager:

Waterfront Loc: Tel. No:

Owner: Fax No:

Operator: E-mail: Hours of Operation:

Delivery Modes:

Ship Docks

Dock # Max Loading Rate (bbls/hr)

Max LOA (ft)

Max Beam (ft)

Max Draft (ft)

Max DWT

Barge Docks

Dock # Max Loading Rate (bbls/hr)

Max LOA (ft)

Max Beam (ft)

Max Draft (ft)

Max DWT

Pipelines

Name Size BBLs/hr Receipt BBLS/hr Issue

Truck Loading Racks

Top Loading Positions Bottom Loading Positions Max Loading Rate

Remarks/ Restrictions: