Attachment__3_-_Delivery_Installation_Instructions.docx
DOCX document 38 KB Posted
- Attached to
- 03-0813 Westley SRRA North & Southbound
- Solicitation number
- 03-0813-B
- Issued by
- California
About this file
This is a Delivery and Installation Instructions attachment for an Informal Competitive solicitation issued by the State of California for refrigeration equipment at the Westley Southbound Rest Area (SRRA) located on Interstate 5 in Stanislaus County, approximately 20 miles south of Lathrop. The solicitation requests two 54-inch two-section reach-in refrigerators and two 27.5-inch single-door reach-in freezers to be delivered to both the North and Southbound rest areas. The contractor must contact the Business Enterprise Coordinator (BEC) at least two weeks in advance to arrange delivery, as the site is unmanned and drop shipment is prohibited. Equipment delivery and installation must be completed within 35 calendar days after receipt of order, with all machines fully operational by the deadline. The contractor is responsible for delivery, set-in-place installation per manufacturer instructions, removal of existing units and packing materials, equipment testing, operational training, and preventative maintenance instruction. Machines must be set side by side and banded together during installation, and all necessary components for delivery, setup, and programming must be provided by the supplier.
The contractor must provide either a trade-in value offer for existing equipment or arrange for recycling of the replaced units. Barcodes from existing equipment must be removed and returned with invoicing documentation and any applicable recycling receipts; payment will be withheld if barcodes are not submitted. All goods furnished must be newly manufactured, with used or reconditioned equipment prohibited. Invoices must be submitted to BEPInvoices@dor.ca.gov and include a complete description of each unit, including delivery location number, address, brand, model, serial number, and warranty information on parts and labor. A truck with a lift-gate is required for delivery. Failure to meet delivery requirements or notify the BEC within 10 days if delivery terms cannot be met may result in contract termination for default.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Darfur_Contracting_Act_Cert_form.docx | DOCX document | |
| Attachment__1_-_REQUEST_FOR_QUOTE_REQUIREME.docx | DOCX document | |
| Post-Consumer_Recycled_Content_Certification.pdf | ||
| std204.pdf | ||
| DR815_Request_for_Quote.pdf | ||
| PD_843_DISABLED_VETERAN_BUSINESS_ENTERPRISE_DECLARATIONS.pdf | ||
| Attachment__2_Specifications_Equipment.docx | DOCX document | |
| Bidder_Declaration.docx | DOCX document | |
| RFQ_Letterhead.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Westley SRRA North & Southbound Location # 03-0813
ATTACHMENT #3 DELIVERY / INSTALLATION REQUIREMENTS
INFORMAL COMPETITIVE
Westley SRRA Southbound I-5 Southbound, Stanislaus County, CA 95387
TRUCK W/ LIFT-GATE REQUIRED
1. Must contact Business Enterprise Coordinator (BEC) 2 WEEKS IN ADVANCE or sooner to obtain access to restricted areas, arrange delivery and set up. The name of the BEC will be provided to the winning bidder.
1. This site is not manned; delivery must be coordinated CAN NOT drop ship.
1. Interstate 5, approximately 20 miles south of Lathrop within Stanislaus County. Will deliver to Southbound rest area.
1. Will deliver 1 freezer and 1 refrigerator to each the North and Southbound rest area.
1. These will be placed within the storage areas.
1. Casters must be in place when delivered. Must set up, level, test for function.
1. Invoices must be submitted to BEPInvoices@dor.ca.gov
1. Invoices must include a complete description of each unit, including delivery location number and address, brand, model, serial number, warranty on parts and labor.
Scheduling:
MUST BE COORDINATED 2 WEEKS IN ADVANCE. Must contact BEC to coordinate delivery date and time, verify machine placement, configurations, and security / clearance requirements.
Delivery And Installation Requirements:
Equipment to be delivered, set-in-place, installed as per manufacturer’s instructions, remove existing unit(s) and all packing material. Installation must include testing to ensure proper working condition and training of operational features, including suggested operating procedures for coin mechanisms and bill validators, as well as preventative maintenance of vending units (proper cleaning of machine(s), air filters, inlet screens, etc.). It is imperative Supplier provide all necessary components required to complete delivery, set-up, and programming of new machine(s).
NOTE: Vending machines to be set in place, side by side, and banded together at time of installation.
Delivery Terms:
Delivery terms, as specified in paragraph 15 of the General Terms and Conditions, indicates Contractor’s responsibility for the furnishing of equipment and completed installation within 5 weeks (35 calendar days) After Receipt of Order (ARO). Upon the 35th day, equipment specified in this order is to be in place and fully operational. Contractor shall strictly adhere to the delivery terms and schedule as specified in this solicitation. Failure to comply with the delivery requirements may be considered a breach of contract under paragraph 24, entitled “Termination for Default” and paragraph 26, entitled “Rights and Remedies of the State for Default”, resulting in contract termination.
NOTE: In the event delivery terms cannot be met as specified, the awarded Contractor is responsible for notifying BEP within 10 days of receiving this order.
Existing Equipment:
Bid must include an offer for trade-in value OR declaration to move existing equipment to recycler. Prior to equipment transfer, the barcodes, as noted below, must be removed, and returned to the department at the time of invoicing, with a recycling receipt (if applicable). Payment will be delayed if barcodes are not received with invoice. Supplier shall NOT accept any substituted machines or barcodes for removal from premises.
Substitutions, Inspection, Acceptance, and Rejection:
As noted in paragraphs 16, and 17 of the General Terms and Conditions, substitution of goods may not be tendered without advance written consent of the Buyer. All goods may be subject to inspection by the State or its authorized representatives, therefore subject to rejection.
Newly Manufactured Goods:
All Goods furnished under this contract shall be newly manufactured Goods; used or reconditioned Goods are prohibited.
End of Attachment
Attachment #3 – Westley SRRA North & Southbound Page 1 of 3
File details come from the government source that posted it. Updated .