This is a Delivery and Installation Requirements attachment for a Small Business solicitation issued by the State of California for vending machine equipment at the Enoch Christoffersen Roadside Rests located on Highway 99 in Turlock, CA. The project requires delivery and installation of vending machines at both northbound and southbound roadside rest stops, with each location receiving one hot coffee machine, one frozen food/ice cream machine, three snack machines, and four drink machines (three "Blue Refresh" live displays and one "Black Ice" waterfall model). The vending machines will be integrated into the structures to serve as exterior walls and must be securely strapped together with steel straps and framed with wood or metal to prevent unauthorized removal. Installation must be completed within 5 weeks (35 calendar days) after receipt of order, with all scheduling coordinated a minimum of 2 weeks in advance through the BEC Vendor and BEC. The contractor must provide all necessary components, including delivery, installation per manufacturer specifications, removal of 18 existing machines, staff training on operational features and maintenance procedures, testing for proper function, and disposal of all packaging materials and existing equipment.

The quote must include removal and disposal costs for existing machines, with trade-in value offered or documentation of recycling. All goods must be newly manufactured, and no substitutions are permitted without written consent from the buyer. The delivery truck must be equipped with a lift gate and pallet jack due to the absence of a loading dock and the approximately 6-inch discrepancy between the outer sidewalk and the vending machine structure floor. Invoices will be signed upon completion of all purchase order requirements and must include detailed information for each unit, including delivery location, address, brand, model, serial number, and warranty details. Barcodes from existing machines must be removed and returned with the invoice; payment will be delayed if barcodes are not received. Failure to comply with delivery requirements may constitute a breach of contract and result in termination, and the contractor must notify BEC within 10 days if delivery terms cannot be met.

View the file

Other files

File Type Posted
Bidder_Declaration.docx DOCX document
Attachment__2_Specifications_for_Vending_Machines.docx DOCX document
DR815_Request_for_Quote.pdf PDF
Attachment__1_-_Request_for_Quote_Requirements_(VM).docx DOCX document
Darfur_Contracting_Act_Cert_form.docx DOCX document
std204.pdf PDF
RFQ_Letterhead.docx DOCX document
Post-Consumer_Recycled_Content_Certification.pdf PDF
DGS_PD_843.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enoch Christoffersen Roadside Rests Location 03-0813-S Small Business Solicitation

ATTACHMENT #3 DELIVERY / INSTALLATION REQUIREMENTS

Location:

Enoch Christoffersen Roadside Rests Highway 99 Northbound and Southbound Turlock, CA 95380

TRUCK W/ LIFT-GATE REQUIRED

1. Must contact BEC Vendor and BEC to obtain access to restricted areas, arrange delivery and installation.

2. Must set up, level, provide training and test for function.

3. Remove all crates and packaging materials, dispose of offsite.

4. The quote must include the removal and disposal of the 18 existing machines.

5. No substitutes without a written consultation.

6. This delivery will consist of installing vending machines at both the northbound and southbound roadside rest stops.

7. Each side will receive one hot coffee machine, one frozen food/ice cream machine, three snack machines, and 4 drink machines (three “blue refresh” live displays and one “waterfall”). Comment by Guzman, Carlene@DOR: Needs to be “Black Ice” see page 4 of attachment #2.

8. The vending machines will be integrated into the structures at the roadside rest stops, serving as exterior walls. To ensure a secure installation, each vending machine must be securely strapped to one another using steel straps and framed in with either wood or metal to eliminate any gaps and to prevent to machines from being pushed, pulled, or lifted in any directions.

9. The installation team should arrive equipped with wooden framing material, steel straps, a full set of tools including drills, socket sets, hammers, self-tapping screws, and other necessary equipment. Additionally, there is an approximate 6-inch discrepancy between the outer sidewalk and the vending machine structure floor. The units must be lifted into the structure with only 1 to 2 inches of vertical clearance beyond the vending machine height. As there is no loading dock available, the delivery truck must be equipped with a lift gate and a pallet jack for unloading.

10. Invoices will be signed upon completion of all PO requirements.

11. To expedite payment, invoices must include a complete description of each unit, including delivery location number and address, brand, model, serial number, warranty on parts and labor.

Scheduling:

MUST BE COORDINATED 2 WEEKS IN ADVANCE. Must contact BEP Vendor and BEC to coordinate delivery date and time, verify machine placement, configurations, and security / clearance requirements.

Delivery And Installation Requirements:

Equipment to be delivered, set-in-place, installed as per manufacturer’s instructions, remove existing unit(s) and all packing material. Installation must include testing to ensure proper working condition and training of operational features, including suggested operating procedures for coin mechanisms and bill validators, as well as preventative maintenance of vending units (proper cleaning of machine(s), air filters, inlet screens, etc.). It is imperative Supplier provide all necessary components required to complete delivery, set-up, and programming of new machine(s).

NOTE: Vending machines to be set in place, side by side, and banded together at time of installation.

Delivery Terms:

Delivery terms, as specified in paragraph 15 of the General Terms and Conditions, indicates Contractor’s responsibility for the furnishing of equipment and completed installation within 5 weeks (35 calendar days) After Receipt of Order (ARO). Upon the 35th day, equipment specified in this order is to be in place and fully operational. Contractor shall strictly adhere to the delivery terms and schedule as specified in this solicitation. Failure to comply with the delivery requirements may be considered a breach of contract under paragraph 24, entitled “Termination for Default” and paragraph 26, entitled “Rights and Remedies of the State for Default”, resulting in contract termination.

NOTE: In the event delivery terms cannot be met as specified, the awarded Contractor is responsible for notifying BEP within 10 days of receiving this order.

Existing Equipment:

Bid must include an offer for trade-in value OR declaration to move existing equipment to recycler. Prior to equipment transfer, the barcodes, as noted below, must be removed, and returned to the department at the time of invoicing, with a recycling receipt (if applicable). Payment will be delayed if barcodes are not received with invoice. Supplier shall NOT accept any substituted machines or barcodes for removal from premises.

Substitutions, Inspection, Acceptance, and Rejection:

As noted in paragraphs 16, and 17 of the General Terms and Conditions, substitution of goods may not be tendered without advance written consent of the Buyer. All goods may be subject to inspection by the State or its authorized representatives, therefore subject to rejection.

Newly Manufactured Goods:

All Goods furnished under this contract shall be newly manufactured Goods; used or reconditioned Goods are prohibited.

End of Attachment Attachment #3 – Enoch Christoffersen Roadside Rests Page 1 of 3

File details come from the government source that posted it. Updated .