This is a Delivery and Installation Instructions document for an Informal Competitive solicitation issued by the State of California for vending machine equipment at the Westley Service/Rest Area (SRRA) Northbound location on Interstate 5 in Stanislaus County. The project requires delivery and installation of nine vending machines consisting of one hot drink coffee machine, two ice cream machines, three snack machines, and three drink machines, along with water fountain and additional empty alcove units. The machines must be delivered to the northbound rest area approximately 20 miles south of Lathrop, placed side by side within three separate alcoves measuring 126 inches wide by 47 inches deep, and banded together upon installation. The winning contractor must complete all delivery, setup, leveling, functionality testing, and staff training within five weeks (35 calendar days) after receipt of order. Coordination must occur a minimum of two weeks in advance with the BEP Vendor and BEC to arrange delivery dates, verify machine placement, confirm security clearance requirements, and remove any existing equipment.

The contractor is responsible for furnishing all necessary components, removing existing units and packaging materials, and disposing of waste off-site. All vending machines must be newly manufactured equipment with no used or reconditioned units permitted. Invoices must include detailed descriptions of each unit including delivery location, brand, model, serial number, warranty information, and barcodes from existing equipment. The contractor must either provide trade-in value for existing equipment or declare its transfer to a recycler, with barcodes required to be removed and returned with the invoice and recycling receipt. A truck with liftgate is required for delivery. Failure to meet delivery deadlines may result in contract termination for default. All goods are subject to inspection and rejection by the State or its authorized representatives, and substitutions require advance written consent from the buyer.

View the file

Other files

File Type Posted
DGS_PD_843.pdf PDF
Attachment__2_Specifications_for_Vending_Machines__005_.docx DOCX document
Darfur_Contracting_Act_Cert_form.docx DOCX document
Post-Consumer_Recycled_Content_Certification.pdf PDF
std204.pdf PDF
RFQ_Letterhead.docx DOCX document
Bidder_Declaration.docx DOCX document
Attachment__1_-_Request_for_Quote_Requirements__VM_.docx DOCX document
DR815_Request_for_Quote.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Westley SRRA Northbound Location 03-0813 Informal Competitive

ATTACHMENT #3 DELIVERY / INSTALLATION REQUIREMENTS

Location:

Westley SRRA Northbound I-5 Northbound, Stanislaus County, CA 95387

Vendor Instructions:

· Must contact BEP Vendor and BEC to obtain access to restricted areas, arrange delivery and installation. Contact information will be provided to the winning bidder.

· Truck w/ liftgate required.

· Interstate 5, approximately 20 miles south of Lathrop within Stanislaus County.

· Deliver 9 vending machines to Northbound rest area.

· Vending machines will be set in place side by side and banded together.

· The machines will be placed within three separate alcoves measuring 126” W x 47”D.

Snack
Drink
Drink
H2OFountain
Frozen
Coffee
Drink

(Left side of site)

Snack
Frozen
Snack
H2OFountain
EMPTY

(Right side of site)

· Remove all crating and packaging materials, dispose off-site.

· Please contact vendor for configuration of trays before delivery.

· Must set up, level, test for function for all 9 machines.

· Invoices must include a complete description of each unit, including delivery location number and address, brand, model, serial number, warranty on parts and labor.

Scheduling:

MUST BE COORDINATED 2 WEEKS IN ADVANCE. Must contact BEP Vendor and BEC to coordinate delivery date and time, verify machine placement, configurations, and security / clearance requirements.

Delivery And Installation Requirements:

Equipment to be delivered, set-in-place, installed as per manufacturer’s instructions, remove existing unit(s) and all packing material. Installation must include testing to ensure proper working condition and training of operational features, including suggested operating procedures for coin mechanisms and bill validators, as well as preventative maintenance of vending units (proper cleaning of machine(s), air filters, inlet screens, etc.). It is imperative Supplier provide all necessary components required to complete delivery, set-up, and programming of new machine(s).

NOTE: Vending machines to be set in place, side by side, and banded together at time of installation.

Delivery Terms:

Delivery terms, as specified in paragraph 15 of the General Terms and Conditions, indicates Contractor’s responsibility for the furnishing of equipment and completed installation within 5 weeks (35 calendar days) After Receipt of Order (ARO). Upon the 35th day, equipment specified in this order is to be in place and fully operational. Contractor shall strictly adhere to the delivery terms and schedule as specified in this solicitation. Failure to comply with the delivery requirements may be considered a breach of contract under paragraph 24, entitled “Termination for Default” and paragraph 26, entitled “Rights and Remedies of the State for Default”, resulting in contract termination.

NOTE: In the event delivery terms cannot be met as specified, the awarded Contractor is responsible for notifying BEP within 10 days of receiving this order.

Existing Equipment:

Bid must include an offer for trade-in value OR declaration to move existing equipment to recycler. Prior to equipment transfer, the barcodes, as noted below, must be removed, and returned to the department at the time of invoicing, with a recycling receipt (if applicable). Payment will be delayed if barcodes are not received with invoice. Supplier shall NOT accept any substituted machines or barcodes for removal from premises.

Substitutions, Inspection, Acceptance, and Rejection:

As noted in paragraphs 16, and 17 of the General Terms and Conditions, substitution of goods may not be tendered without advance written consent of the Buyer. All goods may be subject to inspection by the State or its authorized representatives, therefore subject to rejection.

Newly Manufactured Goods:

All Goods furnished under this contract shall be newly manufactured Goods; used or reconditioned Goods are prohibited.