This delivery and installation requirements document pertains to a California state contract opportunity for vending machines at the Westley SRRA Southbound rest area located on Interstate 5 in Stanislaus County. The solicitation is an informal competitive bid for nine vending machines consisting of one hot drink coffee machine, one ice cream machine, three snack machines, and three drink machines, along with one water fountain. The machines must be delivered and installed at the Southbound rest area approximately 20 miles south of Lathrop and configured within three separate alcoves measuring 126 inches wide by 47 inches deep. All equipment must be newly manufactured, with delivery and full installation required within 35 calendar days after receipt of order. Contractors must coordinate scheduling at least two weeks in advance with the BEP Vendor and BEC, obtain necessary security clearances for the restricted interstate rest area, and provide complete invoices including machine descriptions, serial numbers, brand, model, warranty information, and delivery location details.
Installation requirements include setting machines in place side by side and banded together, leveling and testing all units for proper functionality, removing existing equipment and all packaging materials, and providing comprehensive operator training on coin mechanisms, bill validators, and preventative maintenance procedures. Contractors must provide all necessary components for delivery, setup, and programming and are responsible for providing either a trade-in value for existing equipment or arranging removal to a recycler, with barcodes required to be returned to the department at invoicing. A truck with liftgate is required for delivery. Failure to meet the specified 35-day delivery deadline or notify the department within 10 days of receiving the order if delivery terms cannot be met may result in contract termination for default. The State reserves the right to inspect and reject any goods that do not meet specifications, and substitution of machines or barcodes is prohibited without advance written consent from the Buyer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| std204.pdf | ||
| Attachment__1_-_Request_for_Quote_Requirements_(VM).docx | DOCX document | |
| DR815_Request_for_Quote.pdf | ||
| Darfur_Contracting_Act_Cert_form.docx | DOCX document | |
| 04-2X7804.pdf | ||
| RFQ_Letterhead.docx | DOCX document | |
| Post-Consumer_Recycled_Content_Certification.pdf | ||
| Attachment__2_Specifications_for_Vending_Machines.docx | DOCX document | |
| Bidder_Declaration.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Westley SRRA Southbound Location 03-0813 Informal Competitive
ATTACHMENT #3 DELIVERY / INSTALLATION REQUIREMENTS
Location:
Westley SRRA Southbound I-5 Southbound, Stanislaus County, CA 95387
Vendor Instructions:
· Must contact BEP Vendor and BEC to obtain access to restricted areas, arrange delivery and installation.
· Truck w/ liftgate required.
· Interstate 5, approximately 20 miles south of Lathrop within Stanislaus County. Will deliver to Southbound rest area.
· Deliver 9 vending machines southbound.
· Vending machines will be set in place side by side and banded together.
· The machines will be placed within three separate alcoves measuring 126” W x 47”D.
| Snack |
| Drink |
| Drink |
| H2OFountain |
| Frozen |
| Coffee |
| Drink |
(Left side of site)
| Snack |
| Frozen |
| Snack |
| H2OFountain |
| EMPTY |
(Right side of site)
· Remove all crating and packaging materials, dispose off-site.
· Please contact vendor for configuration of trays before delivery.
· Must set up, level, test for function for all 9 machines.
· Invoices must include a complete description of each unit, including delivery location number and address, brand, model, serial number, warranty on parts and labor.
Scheduling:
MUST BE COORDINATED 2 WEEKS IN ADVANCE. Must contact BEP Vendor and BEC to coordinate delivery date and time, verify machine placement, configurations, and security / clearance requirements.
Delivery And Installation Requirements:
Equipment to be delivered, set-in-place, installed as per manufacturer’s instructions, remove existing unit(s) and all packing material. Installation must include testing to ensure proper working condition and training of operational features, including suggested operating procedures for coin mechanisms and bill validators, as well as preventative maintenance of vending units (proper cleaning of machine(s), air filters, inlet screens, etc.). It is imperative Supplier provide all necessary components required to complete delivery, set-up, and programming of new machine(s).
NOTE: Vending machines to be set in place, side by side, and banded together at time of installation.
Delivery Terms:
Delivery terms, as specified in paragraph 15 of the General Terms and Conditions, indicates Contractor’s responsibility for the furnishing of equipment and completed installation within 5 weeks (35 calendar days) After Receipt of Order (ARO). Upon the 35th day, equipment specified in this order is to be in place and fully operational. Contractor shall strictly adhere to the delivery terms and schedule as specified in this solicitation. Failure to comply with the delivery requirements may be considered a breach of contract under paragraph 24, entitled “Termination for Default” and paragraph 26, entitled “Rights and Remedies of the State for Default”, resulting in contract termination.
NOTE: In the event delivery terms cannot be met as specified, the awarded Contractor is responsible for notifying BEP within 10 days of receiving this order.
Existing Equipment:
Bid must include an offer for trade-in value OR declaration to move existing equipment to recycler. Prior to equipment transfer, the barcodes, as noted below, must be removed, and returned to the department at the time of invoicing, with a recycling receipt (if applicable). Payment will be delayed if barcodes are not received with invoice. Supplier shall NOT accept any substituted machines or barcodes for removal from premises.
Substitutions, Inspection, Acceptance, and Rejection:
As noted in paragraphs 16, and 17 of the General Terms and Conditions, substitution of goods may not be tendered without advance written consent of the Buyer. All goods may be subject to inspection by the State or its authorized representatives, therefore subject to rejection.
Newly Manufactured Goods:
All Goods furnished under this contract shall be newly manufactured Goods; used or reconditioned Goods are prohibited.