Attachment 3 - CyOFTS III CDRLs 10Apr25.pdf
PDF 5 MB Posted
- Solicitation number
- FA8773-25-R-0002
About this file
This document is a Contract Data Requirements List (CDRL) for the Cyber Operations Formal Training Support (CyOFTS) III contract (Solicitation Number: FA8773-25-R-0002). The CDRL details 23 specific data item requirements (A001-A023) that the contractor must submit, including technical and management deliverables such as student guides, lesson strategy reports, instructor plans, syllabi, project planning charts, status reports, trip reports, personnel rosters, technical reports, meeting minutes, presentation materials, contract funds status reports, cyber security workforce reports, risk management framework packages, quality control plans, transition plans, phase-in and phase-out reports.
Each CDRL specifies detailed submission requirements, including electronic delivery formats (primarily Microsoft Office or compatible formats), monthly or quarterly submission frequencies, distribution to specific government offices (39 IOS/COR, AMIC CO, AMIC GPM), and precise timing for initial and subsequent submissions. The documents are to be fully compatible with federal standard desktop configuration, with most reports due within ten working days of specified dates, typically starting from the first month after contract start and submitted by the 6th of each month as part of monthly status reports.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference List of CDRLs Solicitation Number: FA8773-25-R-0002
DD1423-1 - CyOFTS III CDRL A001 Student Guide DD1423-1 - CyOFTS III CDRL A002 Lesson Strategy Report DD1423-1 - CyOFTS III CDRL A003 Instructor Plan DD1423-1 - CyOFTS III CDRL A004 Syllabus DD1423-1 - CyOFTS III CDRL A005 Project Planning Chart DD1423-1 - CyOFTS III CDRL A006 Contractor Status Report/ Instructor Certification Status DD1423-1 - CyOFTS III CDRL A007 Contractor’s Progress and Status Report (Monthly Status Report) DD1423-1 - CyOFTS III CDRL A008 Trip Report DD1423-1 - CyOFTS III CDRL A009 Contractor’s Personnel Roster DD1423-1 - CyOFTS III CDRL A010 Reserved DD1423-1 - CyOFTS III CDRL A011 Reserved DD1423-1 - CyOFTS III CDRL A012 Technical Report - Study/Services DD1423-1 - CyOFTS III CDRL A013 Report, Production or Delivery Problem(s) DD1423-1 - CyOFTS III CDRL A014 Report, Record of Meeting Minutes DD1423-1 - CyOFTS III CDRL A015 Presentation Materials Status Report (CFSR) DD1423-1 - CyOFTS III CDRL A016 Contract Funds DD1423-1 - CyOFTS III CDRL A017 Status Report Government Provided Training DD1423-1 - CyOFTS III CDRL A018 Cyber Security Workforce (CSWF) Report DD1423-1 - CyOFTS III CDRL A019 Risk Management Framework (RMF) Package for Air Force
Intelligence Community (AFIC) Systems DD1423-1 - CyOFTS III CDRL A020 Quality Control Plan (QPC) DD1423-1 - CyOFTS III CDRL A021 Transition Plan DD1423-1 - CyOFTS III CDRL A022 Phase-In Plan Report DD1423-1 - CyOFTS III CDRL A023 Phase-Out Plan Reports
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
X006 B MGMT
CyOFTS III FA8773-XX-D-XXXX TBD
A001 TECHNICAL AND MANAGEMENT STUDENT GUIDES
DI-MISC-81456B BLOCK 16 39 IOS
N
E
BLOCK 16
N/A
BLOCK 16
BLOCK 16
39 IOS/COR 1
39 IOS/DO 1 1
39 IOS/TDF 1 1
2 3 0
REPLACE 2. Format.
ALL COURSEWARE FORMATS SHALL BE IAW CURRENT SCHOOLHOUSE
FORMATS AND PROVIDED BY CURRICULUM MANAGEMENT FLIGHT
REPLACE 3. Content.
ALL COURSEWARE FORMATS SHALL BE IAW CURRENT SCHOOLHOUSE
FORMATS AND PROVIDED BY CURRICULUM MANAGEMENT FLIGHT
BLOCK 5
PWS-
A0001 - 3.2.2.3, 3.2.2.28-3.2.2.30, 3.2.2.33, 3.2.3.2, 3.2.3.29, 3.3.2.3, 3.3.2.31-3.3.2.33, 3.3.2.37, 3.3.3.2, 3.3.3.32, 3.4.1.27, 3.4.1.47, 3.4.2.3, 3.4.2.31-3.4.2.33, 3.4.2.37, 3.4.3.2, 3.4.3.32, 3.4.3.39, 3.5.2.3, 3.5.2.31-3.5.2.33, 3.5.2.37, 3.5.3.2, 3.5.3.28
BLOCKS 10/12
WITHIN TEN WORKING DAYS OF SUSPENSE DUE DATE
FIRST MONTH AFTER CONTRACT START
BLOCK 13
WITHIN TEN WORKING DAYS OF SUSPENSE DUE DATE
UPDATE STATUS AS PART OF THE MONTHLY STATUS REPORTS
PMR - QUARTERLY
Mark Bauman, AMIC/PMSO
BAUMAN.MARK.DAVID.136593
Digitally signed by
BAUMAN.MARK.DAVID.1365930372
Date: 2025.04.04 08:33:01 -05'00'
4/4/2025 HARPER.TRICIA.ANNE.150
9147309
Digitally signed by
HARPER.TRICIA.ANNE.1509147309
Date: 2025.04.04 13:50:13 -05'00'
4/4/2025
1 3 Adobe Professional 8.0
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
X006 B MGMT
CyOFTS III FA8773-XX-D-XXXX TBD
2 3
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
X006 Data B MGMT
CyOFTS III FA8773-XX-D-XXXX TBD
A002 TECHNICAL AND MANAGEMENT LESSON STRATEGY REPORT
DI-MISC-81457A BLOCK 16 39 IOS
N
E
BLOCK 16
N/A
BLOCK 16
BLOCK 16
39 IOS/COR 1
39 IOS/DO 1 1
39 IOS/TDF 1 1
2 3 0
REPLACE 2 Format
ALL COURSEWARE FORMATS SHALL BE IAW CURRENT SCHOOLHOUSE
FORMATS AND PROVIDED BY CURRICULUM MANAGEMENT FLIGHT
REPLACE 3 Content
ALL COURSEWARE FORMATS SHALL BE IAW CURRENT SCHOOLHOUSE
FORMATS AND PROVIDED BY CURRICULUM MANAGEMENT FLIGHT
PWS-
A0002- 3.2.2.3, 3.2.2.27, 3.2.2.28, 3.2.2.29, 3.2.2.30, 3.3.2.3, 3.3.2.30, 3.3.2.31, 3.3.2.32, 3.3.2.33,3.4.2.3, 3.4.2.30, 3.4.2.31, 3.4.2.32, 3.4.2.33, 3.5.2.3, 3.5.2.30, 3.5.2.31, 3.5.2.32, 3.5.2.33
BLOCKS 10/12
WITHIN TEN WORKING DAYS OF SUSPENSE DUE DATE
FIRST MONTH AFTER CONTRACT START
BLOCK 13
WITHIN TEN WORKING DAYS OF SUSPENSE DUE DATE
UPDATE STATUS AS PART OF THE MONTHLY STATUS REPORTS
PMR - QUARTERLY
Mark Bauman, AMIC/PMSO
BAUMAN.MARK.DAVID.136593
Digitally signed by
BAUMAN.MARK.DAVID.1365930372
Date: 2025.04.04 08:33:34 -05'00'
4/4/2025 HARPER.TRICIA.ANNE.150
9147309
Digitally signed by
HARPER.TRICIA.ANNE.1509147309
Date: 2025.04.04 13:59:00 -05'00'
4/4/2025
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
X006 Data B MGMT
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
X006 Data B MGMT
CyOFTS III FA8773-XX-D-XXXX TBD
A003 TECHNICAL AND MANAGEMENT INSTRUCTOR PLAN
DI-MISC-81458B BLOCK 16 39 IOS
N
E
BLOCK 16
N/A
BLOCK 16
BLOCK 16
39 IOS/COR 1
39 IOS/DO 1 1
39 IOS/TDF 1 1
2 3 0
REPLACE 2 Format
ALL COURSEWARE FORMATS SHALL BE IAW CURRENT SCHOOLHOUSE
FORMATS AND PROVIDED BY CURRICULUM MANAGEMENT FLIGHT
REPLACE 3 Content
ALL COURSEWARE FORMATS SHALL BE IAW CURRENT SCHOOLHOUSE
FORMATS AND PROVIDED BY CURRICULUM MANAGEMENT FLIGHT
BLOCK 5
PWS-
A0003- 3.2.2.3, 3.2.2.28, 3.2.2.29, 3.2.2.30, 3.3.2.3, 3.3.2.31, 3.3.2.32, 3.3.2.33,3.4.2.3,3.4.2.31, 3.4.2.32, 3.4.2.33, 3.5.2.3, 3.5.2.31, 3.5.2.32, 3.5.2.33
BLOCKS 10/12
WITHIN TEN WORKING DAYS OF SUSPENSE DUE DATE
FIRST MONTH AFTER CONTRACT START
BLOCK 13
WITHIN TEN WORKING DAYS OF SUSPENSE DUE DATE
UPDATE STATUS AS PART OF THE MONTHLY STATUS REPORTS
PMR - QUARTERLY
Mark Bauman, AMIC/PMSO
BAUMAN.MARK.DAVID.136593
Digitally signed by
BAUMAN.MARK.DAVID.1365930372
Date: 2025.04.04 08:34:06 -05'00'
4/4/2025 HARPER.TRICIA.ANNE.150
9147309
Digitally signed by
HARPER.TRICIA.ANNE.1509147309
Date: 2025.04.04 14:07:42 -05'00'
4/4/2025
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
X006 Data B MGMT
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
X006 Data B MGMT
CyOFTS III FA8773-XX-D-XXXX TBD
A004 TECHNICAL AND MANAGEMENT SYLLABUS
DI-MISC-81459B BLOCK 16 39 IOS
N
E
BLOCK 16
N/A
BLOCK 16
BLOCK 16
39 IOS/COR 1
AMIC CO 1 1
AMIC GPM 1 1
2 3 0
REPLACE 2 Format
ALL COURSEWARE FORMATS SHALL BE IAW CURRENT SCHOOLHOUSE
FORMATS AND PROVIDED BY CURRICULUM MANAGEMENT FLIGHT
REPLACE 3 Content
ALL COURSEWARE FORMATS SHALL BE IAW CURRENT SCHOOLHOUSE
FORMATS AND PROVIDED BY CURRICULUM MANAGEMENT FLIGHT
BLOCK 5
PWS-
A0004- 3.2.2.3, 3.2.2.28, 3.2.2.29, 3.2.2.30, 3.3.2.3, 3.3.2.31, 3.3.2.32, 3.3.2.33,3.4.2.3, 3.4.2.31, 3.4.2.32, 3.4.2.33, 3.5.2.3, 3.5.2.31, 3.5.2.32, 3.5.2.33
BLOCKS 10/12
WITHIN TEN WORKING DAYS OF SUSPENSE DUE DATE
FIRST MONTH AFTER CONTRACT START
BLOCK 13
WITHIN TEN WORKING DAYS OF SUSPENSE DUE DATE
UPDATE STATUS AS PART OF THE MONTHLY STATUS REPORTS
PMR - QUARTERLY
Mark Bauman, AMIC/PMSO
BAUMAN.MARK.DAVID.136593
Digitally signed by
BAUMAN.MARK.DAVID.1365930372
Date: 2025.04.04 08:34:40 -05'00'
4/4/2025 HARPER.TRICIA.ANNE.150
9147309
Digitally signed by
HARPER.TRICIA.ANNE.1509147309
Date: 2025.04.04 14:09:30 -05'00'
4/4/2025
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
X006 Data B MGMT
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
X006 Data B MGMT
CyOFTS III FA8773-XX-D-XXXX TBD
A005 TECHNICAL AND MANAGEMENT Project Planning Chart
DI-MGMT-80507C PWS 3.6.23.2 39 IOS
N
E
BLOCK 16
N/A
BLOCK 16
BLOCK 16
39 IOS/COR 1
AMIC CO 1
AMIC GPM 1
39 IOS/XP 1 1
1 4 0
REPLACE 2 Format
THE REPORT SHALL BE DELIVERED ELECTRONICALLY TO COR, DO, & XP IN
MICROSOFT (MS) POWERPOINT, MS EXCEL, MS PROJECT, MS PLANNER, MS
TEAMS, JIRA, CONFLUENCE, OR COMPATIBLE FORMAT. (FULLY COMPATIBLE
WITH FEDERAL STANDARD DESKTOP CONFIGURATION.)
REPLACE 3 Content
ALL PROJECT PLANNING CHART FORMATS SHALL BE IAW CURRENT
FORMATS PROVIDED BY PLANS AND PROGRAMS FLIGHT (XP)
BLOCKS 10/12
PRESENTED WITHIN FIVE WORKING DAYS OF REQUEST
POST AWARD CONFERENCE - 20 BUSINESS DAYS AFTER CONTRACT AWARD
PMR - 3RD MONTH AFTER AWARD
BLOCK 13
POST AWARD CONFERENCE – N/A
PMR - QUARTERLY
Mark Bauman, AMIC/PMSO
BAUMAN.MARK.DAVID.136593
Digitally signed by
BAUMAN.MARK.DAVID.1365930372
Date: 2025.04.04 08:35:10 -05'00'
4/4/2025 HARPER.TRICIA.ANNE.150
9147309
Digitally signed by
HARPER.TRICIA.ANNE.1509147309
Date: 2025.04.07 09:47:51 -05'00'
4/7/2025
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
X006 Data B MGMT
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
X006 Data B MGMT
CyOFTS III FA8773-XX-D-XXXX TBD
A006 TECHNICAL AND MANAGEMENT CONTRACT STATUS REPORT /
Instructor Certification Status
DI-MGMT-81991 PWS 2.5.5 39 IOS
N
E
MONTHLY
N/A
BLOCK 16
BLOCK 16
39 IOS/COR 1
AMIC CO 1
AMIC GPM 1
0 3 0
REPLACE 1 Format
THE INSTRUCTOR CERTIFICATION REPORT SHALL BE INCLUDED IN AND
CONFORM TO THE 39IOS MONTHLY STATUS REPORT FORMAT DELIVERED
ELECTRONICALLY IN MICROSOFT WORD DOCX OR ADOBE PDF FORMATS
(FULLY COMPATIBLE WITH FEDERAL STANDARD DESKTOP
CONFIGURATION.)
REPLACE 2 Content
ALL INSTRUCTOR CERTIFICATION REPORT CONTENT SHALL BE IAW
CURRENT SCHOOLHOUSE FORMATS AND INCLUDE THE FOLLOWING WHEN
REPORTING INSTRUCTOR CERTIFICATION STATUS IN THE MONTHLY STATUS
REPORT:
INSTRUCTOR NAME, AREA OF SUBJECT MATTER EXPERTISE, DATE ENTERED
INSTRUCTOR TRAINING, INSTRUCTOR QUALIFICATION STATUS, APPROVED
OR PENDING WAIVERS, AS APPLICABLE, DEFENSE CYBER WORK FORCE
CERTIFICATION STATUS. ADDITIONAL ITEMS MAY BE INCLUDED IN THIS
REPORT AS AGREED ON BETWEEN THE COR AND CONTRACTOR
REPLACE 3 Summary
ALL INSTRUCTOR CERTIFICATION REPORT SUMMARIES SHALL BE IAW
CURRENT SCHOOLHOUSE FORMATS AND PROVIDED BY COR
BLK 12 DUE ON THE 6th OF THE MONTH AFTER THE FIRST FULL MONTH
FOLLOWING AWARD
BLK 13: MONTHLY AS PART OF THE MONTHLY STATUS REPORT (MSR)
Mark Bauman, AMIC/PMSO
BAUMAN.MARK.DAVID.136593
Digitally signed by
BAUMAN.MARK.DAVID.1365930372
Date: 2025.04.04 08:35:47 -05'00'
4/4/2025 HARPER.TRICIA.ANNE.150
9147309
Digitally signed by
HARPER.TRICIA.ANNE.1509147309
Date: 2025.04.04 14:08:19 -05'00'
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
X006 Data B MGMT
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .