Attachment 3 - Concept Drawings_Structural Burn Trainer Facility.pdf

PDF 879 KB Posted

Attached to
Structural Burn Trainer - Goodfellow AFB Federal contract opportunity
Solicitation number
FA303025Q0004
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document appears to be a set of concept drawings for a Structural Burn Trainer Facility that is part of a federal contract opportunity. The key details are:

The Department of the Air Force is issuing a solicitation (Solicitation Number FA303025Q0004) for the fabrication and installation of a modular structural burn fire trainer at the Louis F. Garland Fire Academy on Goodfellow AFB, TX. The contractor shall provide all personnel, equipment, tools, material, transportation, labor, and supervision required to design, fabricate, and install the burn trainer in accordance with the Statement of Work and salient characteristics. The concept drawings provided are for example purposes only, and completed designs are not required as part of the submission process. The Period of Performance is 225 days after contract award. This is a 100% Small Business set-aside opportunity with a Firm Fixed-Price award. A site visit is scheduled for November 15, 2024, and proposals are due by November 27, 2024. Interested parties must be registered in SAM and have a UEI number.

View the file

Other files for this federal contract opportunity

Other files attached to Structural Burn Trainer - Goodfellow AFB, newest first.
File Type Posted
Solicitation Amendment FA303025Q00040001 SF 30.pdf PDF
Structural Burn Trainer QA.docx DOCX document
Solicitation - FA303025Q0004.pdf PDF
Attachment 1 - SoW_Structural Burn Trainer.pdf PDF
Attachment 2 - Structural Burn Trainer Salient Characteristics.pdf PDF
Attachment 4 - (CUI) BAL Template.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

30'

3.5'

1 O'

CD NORTH

NTS

0soUTH

NTS

KEYNOTES

/v=

IX

ELEVATION

1LlJ

(s)

ELEVATION

I-- '1. i----- -

1?

/17

L '7"'

,ft

L

74'

� c' ----y✓

5&

I'

I

� f;

p � ,,:&

1. CONTRACTOR SHALL PROVIDE EXTERIOR LIGHTING ON ALL SIDES OF STRUCTURE.

2. CONTRACTOR SHALL PROVIDE SAFETY RAILING OPENINGS WITH REMOVABLE CHAINS

ON NORTH AND SOUTH SIDES FOR LADDER RESCUE OPERATIONS.

3. PROVIDE EXTERIOR FORCED ENTRY DOOR.

4. CONTRACTOR SHALL PROVIDE OSHA COMPLIANT SAFETY RAILINGS.

5. PROVIDE EXTERIOR STEEL OPEN GRATE STAIRWELL.

6. PROVIDE SIMULATED ELECTRICAL AND GAS SHUTOFF.

7. PROVIDE SECOND FLOOR EXTERIOR WALKWAY SPANNING LENGTH OF PROPANE

SIDE.

I

26'

/i)

If

,__ -01)

48'

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING DIMENSIONS,

EQUIPMENT, AND CONDITIONS PRIOR TO START OF WORK.

2. CONTRACTOR SHALL ENSURE WORK AREAS SHALL BE KEPT CLEAN, SAFE, AND IN

A WORKMANLIKE CONDITION. DEBRIS SHALL BE CLEANED ON A DAILY BASIS AND

SITE SHALL BE MAINTAINED IN ACCORDANCE WITH THE SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.

4. CONTRACTOR SHALL DESIGN FOR POSITIVE DRAINAGE AWAY FROM BUILDING AND

TOWARDS EXISTING STORM DRAINAGE INLETS.

f 4'

1 O'

1 O'

LJJ � ----.J..J_

,...-.--r Vv J.,, ~r------.. -- V v ,...I� v

0WEST

NTS

V 1� 1-----._

ELEVATION

I/ " r:::' ,.,.. 1 ,-..

V '--'

(DEAST

NTS

V

I'

ELEVATION

V r-----r--,...._ r-I� r-l� Oi

I'

3.5'

I

1.. ..1 3'

6'

1 O'

A-ESeu a: � W X z � �I-

�z C, <( a: z m ::::, - w mo� w z C, � a: 1- z 0LL O z LL ...JW<Ca:

�6�< ::::, a: .c �i-n.._o 0 " ...J ::::, ...

� m C/l LL

� 8 z g

/ FrcjectNllnber-

BH:ET 1TT1.E

NEW TRAINER ELEVATIONS

Date, , NOVEMBER 30TH, 2023

SEO. BH:ET OF

24'

I

CD 1 ST FLOOR

NTS

3'

I

TYP. OF 2

PLAN CLASS

26'

8'

G)

TRUE

NORTH

I�""�

\v

TYP. OF 3

I

I

3.5'

IELECT ISHUTOFF

KEYNOTES

1. CONTRACTOR SHALL PROVIDE A STEEL CONTAINER TYPE FIRE TRAINING

STRUCTURE.

2. CONTRACTOR SHALL PROVIDE CORROSION RESISTANT STEEL CORRUGATED

STAIRWELL CONFORMING TO OSHA REQUIREMENTS.

3. CONTRACTOR SHALL PROVIDE A STAINLESS STEEL FRAME WITH CORTEN SHEET

METAL COUCH TRAINER WITH A KIDDLE FIRE TRAINER 4A 1-006-480.

4. CONTRACTOR SHALL PROVIDE A SIMULATED GAS SHUTOFF.

5. CONTRACTOR SHALL PROVIDE AN ELECTRICAL SHUTOFF.

6. CONTRACTOR SHALL INSTALL A WINDOW TO DOOR TRAINER.

7. CONTRACTOR SHALL PROVIDE A FORCED ENTRY WINDOW.

8. CONTRACTOR SHALL PROVIDE AN NFPA COMPLIANT CLASS A FIRE BURN PAN.

9. PROVIDE THERMAL LINING SYSTEM THROUGHOUT SIMULATED DINING/KITCHEN

BURN ROOM.

10. PROVIDE 11 OV RECEPTACLES ON NON BURN ROOM SIMULATING LIVING ROOM.

11. PROVIDE A FORCED ENTRY DOOR TRAINER.

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING DIMENSIONS,

EQUIPMENT, AND CONDITIONS PRIOR TO START OF WORK.

2. CONTRACTOR SHALL ENSURE WORK AREAS SHALL BE KEPT CLEAN, SAFE, AND IN

A WORKMANLIKE CONDITION. DEBRIS SHALL BE CLEANED ON A DAILY BASIS AND

SITE SHALL BE MAINTAINED IN ACCORDANCE WITH THE SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.

4. CONTRACTOR SHALL DESIGN FOR POSITIVE DRAINAGE AWAY FROM BUILDING AND

TOWARDS EXISTING STORM DRAINAGE INLETS.

A-ESeu

�1�

��t I

I I I I i�1J I I

I

I I I i,11 I i I I 11 I 111! i I it ii ii ii

I I

I; ti I'

Iii I Ii f f fl f" f" ,, i i ii ii ii ii

,._____[___L._____[___./ a:

w z z C, <( a: z m ffi d � w w z C, � a: 1- z 0 i[ 0 z IL ...J w <Ca:

<( "') a: -a:01- <

:::) IE ..c � I- - 0 0 t::: ...J :::) ...J a: w

� IL

w z g

,, FrcjectNurnber-

BH:ET 1TT1.E

1 ST FLOOR PLAN - CLASS A

Date, '- NOVEMBER 30TH, 2023

02ND

NTS

FLOOR

\v

TYP. OF 6

PLAN

I

L

CLASS

26'

_J i

TRUE

NORTH

3'

KEYNOTES

1. CONTRACTOR SHALL PROVIDE A STEEL CONTAINER TYPE FIRE TRAINING

STRUCTURE.

2. CONTRACTOR SHALL PROVIDE CORROSION RESISTANT STEEL CORRUGATED

STAIRWELL CONFORMING TO OSHA REQUIREMENTS.

3. PROVIDE ACCESS TO ATTIC SPACE.

4. CONTRACTOR SHALL PROVIDE AN NFPA COMPLIANT CLASS A FIRE BURN PAN.

5. PROVIDE 11 OV RECEPTACLES ON NON BURN ROOM SIMULATING BEDROOM.

6. PROVIDE THERMAL LINING SYSTEM THROUGHOUT SIMULATED BEDROOM BURN

ROOM.

7. CONTRACTOR SHALL PROVIDE FORCED ENTRY WINDOWS.

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING DIMENSIONS,

EQUIPMENT, AND CONDITIONS PRIOR TO START OF WORK.

2. CONTRACTOR SHALL ENSURE WORK AREAS SHALL BE KEPT CLEAN, SAFE, AND IN

A WORKMANLIKE CONDITION. DEBRIS SHALL BE CLEANED ON A DAILY BASIS AND

SITE SHALL BE MAINTAINED IN ACCORDANCE WITH THE SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.

4. CONTRACTOR SHALL DESIGN FOR POSITIVE DRAINAGE AWAY FROM BUILDING AND

TOWARDS EXISTING STORM DRAINAGE INLETS.

A-ESeu

�1�

��t I

I I I I i�1J I I

I

I I I i,11 I i I I 11 I 111! i I it ii ii ii

I I

I; ti I'

Iii I Ii f f fl f" f" ,, i i ii ii ii ii

,.______[___L._____[___./

,, FrcjectNurnber-

BH:ET 1TT1.E

2ND FLOOR PLAN - CLASS A

Date, '- NOVEMBER 30TH, 2023

I

TRUE

NORTH

(DPITCHED ROOF PLAN - CLASS A

® NTS

(DPITCHED

NTS

ROOF SIDE VIEW CLASS A

TRUE

NORTH

KEYNOTES

1. CONTRACTOR SHALL PROVIDE A PITCHED ROOF WITH SAFETY RAILINGS ALONG

THE EDGE. PROVIDE OPENINGS (MARKED WITH REMOVABLE CHAINS) IN THE

RAILING TO THE NORTH AND SOUTH FOR LADDER RESCUE OPERATIONS.

2. CONTRACTOR SHALL PROVIDE TWO 4' BY 4' CUT-IN AREAS WITH SIMULATED

RAFTERS UNDER 4' BY 4' SHEET OF PLYWOOD.

3. PROVIDE ABILITY TO PUMP SMOKE INTO THE ATTIC SPACE.

4. CONTRACTOR SHALL PROVIDE SAFETY RAILINGS IN ACCORDANCE WITH OSHA

STANDARDS.

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING DIMENSIONS,

EQUIPMENT, AND CONDITIONS PRIOR TO START OF WORK.

2. CONTRACTOR SHALL ENSURE WORK AREAS SHALL BE KEPT CLEAN, SAFE, AND IN

A WORKMANLIKE CONDITION. DEBRIS SHALL BE CLEANED ON A DAILY BASIS AND

SITE SHALL BE MAINTAINED IN ACCORDANCE WITH THE SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.

4. CONTRACTOR SHALL DESIGN FOR POSITIVE DRAINAGE AWAY FROM BUILDING AND

TOWARDS EXISTING STORM DRAINAGE INLETS.

" I -;1. :•.-·,., • r.-�;\.I /

A-ESeu

�1�

��t I

I I I I i�1J I I

I

I I I i,11 I ; I I 11 I 111! i I it ii ii ii

I I

I; ti I'

Iii I Ii f f fl f'" f'" ,, i i ii ii ii ii

1i' !- !-

I� i I! �

,, FrcjectNurnber-

BH:ET 1TT1.E

ATTIC/ROOF PLAN - CLASS A

Date, '- NOVEMBER 30TH, 2023

,-----------------------------48'------------------------------1

7 I t------�----<8

KX

1/.Y.

f--

RM 06

RM

RM 05

0 _ _, 6 \...-_/

' 0

3.5'

-_/6)--_/ y_y

KX

1/.Y.

RM 04

,--( 5 }---'

I

11 TYP. OF 8

RM 02

RM 01

--'4 >---'

,------,-----,-,-----,-----,----,-----,-----,---,-----,--------.------.----��I�

3'

L '------'------'-'------'-----'....L..._____L____j______L________l______L_______L______J

CD 1 ST FLOOR

NTS

PLAN PROPANE

TRUE

NORTH

KEYNOTES

1. CONTRACTOR SHALL PROVIDE A STEEL CONTAINER TYPE FIRE TRAINING STRUCTURE.

2. CONTRACTOR SHALL PROVIDE CORROSION RESISTANT GRATED STEEL EXTERIOR STAIRWELL CONFORMING TO

OSHA REQUIREMENTS LEADING TO SECOND FLOOR WALKWAY.

3. CONTRACTOR SHALL INSTALL A STAINLESS STEEL FRAMING CORTEN SHEET METAL COUCH TRAINER WITH A

KIDDE FIRE TRAINER 4A1-006-480 PER STATEMENT OF WORK.

4. PROVIDE THERMAL LINING SYSTEM THROUGHOUT SIMULATED LIVING ROOM BURN ROOM.

5. CONTRACTOR SHALL ROUTE ALL BURNER CONTROL EQUIPMENT TO CONTROL ROOM (RM 04).

6. CONTRACTOR SHALL PROVIDE 11 OV RECEPTACLES ON NON BURN ROOMS (RM 02, 03, 04, 05, 06).

7. CONTRACTOR SHALL INSTALL PARTIAL WALL.

8. PROVIDE INTERIOR CORROSION RESISTANT GRATED STEEL STAIRWELL CONFORMING TO OSHA REQUIREMENTS.

9. PROVIDE NFPA COMPLIANT FIRE DEPARTMENT CONNECTION WET STANDPIPE CONNECTED TO EXISTING WATER

UTILITY FROM FIRST FLOOR THROUGH THIRD FLOOR WITH GATED CONNECTION AND SHUT OFF.

10. PROVIDE WET PIPE SPRINKLER RISER, WATER MOTOR GONG (OUTSIDE), SPRINKLER CONNECTION (OUTSIDE)

AND OS&Y VALVE (OUTSIDE). SYSTEM WILL BE CONNECTED TO EXISTING WATER UTILITY RAN FROM THE

SOUTH SIDE.

11. PROVIDE INTERIOR LIGHTING TO NON BURN ROOMS.

12. PROVIDE METAL WINDOWS.

-----j n

:::::0 0 )> C zn !TlI :::::0 i-----< 1

/ TYP. OF 3

I

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING DIMENSIONS,

EQUIPMENT, AND CONDITIONS PRIOR TO START OF WORK.

2. CONTRACTOR SHALL ENSURE WORK AREAS SHALL BE KEPT CLEAN, SAFE, AND IN

A WORKMANLIKE CONDITION. DEBRIS SHALL BE CLEANED ON A DAILY BASIS AND

SITE SHALL BE MAINTAINED IN ACCORDANCE WITH THE SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.

4. CONTRACTOR SHALL DESIGN FOR POSITIVE DRAINAGE AWAY FROM BUILDING AND

TOWARDS EXISTING STORM DRAINAGE INLETS.

A-ESeu

�1�

��t I

I I I I i�1J I I 11 I

I I I i,11 I i I I 11 I 111! i I it ii ii ii

I I

I; ti I'

Iii I Ii f f fl f f i i ii ii ii ii

,--..___[____J _ _j__/ a: � W X z

I-� �z C, <( a: z m::::, . -mo�w w z C, a: 1- z 0 u.Ozu.

...J w -"') <( a: <( 0 a: -a:a: 1- < � 0.. ..c � 0 r::: 0 ::::, ... ...J � m Cl) ll.

� 8 z 0 C, FrcjectNllnber-

BH:ET 1TT1.E

1 ST FLOOR PLAN - PROPANE

Date, NOVEMBER 30TH, 2023

(D2ND

NTS

FLOOR

I

PLAN

4 TYP. OF 4

RM 1 0

TRUE

NORTH

PROPANE®

(6, 3'

__l

RM 1 1

I

48'

BED

BED

TRAINER

0 1 1

RM 08

9 TYP. OF 5

WASHER 1

DRYER

0 @r

T

3'

_L

RM 09 V

I I I I I

KEYNOTES

1 . CONTRACTOR SHALL PROVIDE A STEEL CONTAINER TYPE FIRE TRAINING

STRUCTURE.

2. CONTRACTOR SHALL PROVIDE CORROSION RESISTANT GRATED STEEL STAIRWELL

CONFORMING TO OSHA REQUIREMENTS.

3. CONTRACTOR SHALL AN ENCLOSED CORROSION RESISTANT GRATED STEEL

STAIRWELL CONFORMING TO OSHA REQUIREMENTS LEADING TO THIRD FLOOR.

4. PROVIDE INTERIOR LIGHTING TO NON BURN ROOMS.

5. CONTRACTOR SHALL PROVIDE 11 OV RECEPTACLES IN NON BURN ROOMS.

6. PROVIDE EXTERIOR OPEN GRATED STEEL STAIRS AND WALKWAY.

7. PROVIDE WET STANDPIPE FROM FIRST FLOOR THROUGH THIRD FLOOR AND GATED

CONNECTION.

8. PROVIDE BASEMENT TYPE METAL WINDOWS.

9. PROVIDE METAL WINDOWS.

10. CONTRACTOR SHALL INSTALL A STAINLESS STEEL FRAMING CORTEN SHEET METAL

WASHER/DRYER FIRE TRAINER PER STATEMENT OF WORK.

11. CONTRACTOR SHALL INSTALL A STAINLESS STEEL FRAMING CORTEN SHEET METAL

BED FIRE TRAINER PER STATEMENT OF WORK.

12. PROVIDE THERMAL LINING SYSTEM INSIDE BURN ROOMS.

I 3.5' '-

_l

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPON SIBLE FOR VERIFYING EXISTING DIMENSIONS,

EQUIPMENT, AND CONDITIONS PRIOR TO START OF WORK.

2. CONTRACTOR SHALL ENSURE WORK AREAS SHALL BE KEPT CLEAN, SAFE, AND IN

A WORKMANLIKE CONDITION. DEBRIS SHALL BE CLEANED ON A DAILY BASIS AND

SITE SHALL BE MAINTAINED IN ACCORDANCE WITH THE SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.

4. CONTRACTOR SHALL DESIGN FOR POSITIVE DRAINAGE AWAY FROM BUILDING AND

TOWARDS EXISTING STORM DRAINAGE INLETS.

A-EIINJ,

�1� X

��i t

J J J i�1) I I 11 ! !

i1lt I ; I I 11 Iii! ; I 11 Ii I;

I l

I� ti

J Ii f f fi flt flt i i ii ii ii

.t .t i I a: � W X z

I-� • � z C, <(a: z m ffi d � w w z C, a: 1- z 0 lL O - lL wz

...J "') <( a:

<( 0 a: -a:a: 1- <

� 0.. .c � u r::o :::> ... ...J a: ...J I- w Cl) lL

� 8 z 8

/'PrcjeclNl.mber-

81-EET 1TT1.E

J I

I

II

t• ft ii

2ND FLOOR PlAN - PROPANE

Daleo

\.. NOVEMBER 30TH, 2023

SEO. IIEET OF

f--f--

I I f--f--

I

(D3RD

NTS

I

I

I

FLOOR PLAN

TRUE

NORTH

PROPANE®

I I I

4 TYP. OF 4

I

3'

I I I I I I

I I I

3.5' 7 TYP. OF 4

-r--------_

3'

TYP. OF 3

KEYNOTES

1. CONTRACTOR SHALL PROVIDE A STEEL CONTAINER TYPE FIRE TRAINING

STRUCTURE.

2. CONTRACTOR SHALL PROVIDE CORROSION RESISTANT GRATED STEEL STAIRWELL

CONFORMING TO OSHA REQUIREMENTS.

3. CONTRACTOR SHALL AN ENCLOSED CORROSION RESISTANT GRATED STEEL

STAIRWELL CONFORMING TO OSHA REQUIREMENTS LEADING TO SECOND FLOOR

ROOM 09.

4. PROVIDE INTERIOR LIGHTING.

5. CONTRACTOR SHALL PROVIDE 11 OV RECEPTACLES.

6. PROVIDE EXTERIOR OPEN GRATED STEEL STAIRS AND WALKWAY.

7. PROVIDE EXTERIOR WALL MOUNTED LIGHTING.

8. PROVIDE WET STANDPIPE TERMINATION AND GATED CONNECTION.

9. PROVIDE METAL WINDOWS.

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING DIMENSIONS,

EQUIPMENT, AND CONDITIONS PRIOR TO START OF WORK.

2. CONTRACTOR SHALL ENSURE WORK AREAS SHALL BE KEPT CLEAN, SAFE, AND IN

A WORKMANLIKE CONDITION. DEBRIS SHALL BE CLEANED ON A DAILY BASIS AND

SITE SHALL BE MAINTAINED IN ACCORDANCE WITH THE SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.

4. CONTRACTOR SHALL DESIGN FOR POSITIVE DRAINAGE AWAY FROM BUILDING AND

TOWARDS EXISTING STORM DRAINAGE INLETS.

A-E-

�1� X i�i J J

I :1!1 I I I

I I

11,1 1 I i I I i I ii ii �, f i

,� il

I a: w z f i f i fi ii fi' ii w CJ)z C, <( a: z mffi () � w w z C, � a: I- z 0IL O z IL ...JW<(a:

� 6 I!: <(

:::) It ..c 3:

I- - 00 " ...J a: ...J I- w en IL 3: Cl w 0 z 8

/ Prqecllunber-

81-EET1111.E

J J

;I I

I

11 I ii i;

11 j.

fi' ,, ii ii

3RD FLOOR PLAN - PROPANE

Date, , NOVEMBER 30TH, 2023

SEO. OF

File details come from the government source that posted it. Updated .