Attachment 3 CLIN_Pricing_Schedule.pdf
PDF 155 KB Posted
- Attached to
- Laughlin AFB Chapel Carpet Replacement Federal contract opportunity
- Solicitation number
- FA3099-23-Q-1009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 02 - Question and Answers Memorandum.pdf | ||
| Stair Nosing Image.pdf | ||
| Rev 01 Questions and Answers Spreadsheet.xlsx | XLSX spreadsheet | |
| Amendment 01 - Statement of Objective Memorandum.pdf | ||
| Sign In Sheet.pdf | ||
| Amended Attachment 1 Statement of Objective 29Mar23.pdf | ||
| Questions and Answers Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment 1 Statement of Objective 10Mar23.pdf | ||
| Attachment 5 EAL.pdf | ||
| Attachment 4 Wage Determination.pdf | ||
| Attachment 2 Measurements and Photos 22 Feb 23.pdf | ||
| Combo Synopsis Solicitation.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3 – Contract Line-Item Number / Pricing Schedule
FA3099-23-Q-1009
CONTRACT LINE ITEMS – PRICING SCHEDULE:
CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
0001 Carpet Cost
FFP
Material Cost Only
1 LO
0002 Adhesive Cost
FFP
Material Cost Only
1 LO
0003 Building 359 Carpet Removal and Installation Services
FFP
The contractor shall provide all necessary labor, equipment, parts and material to lift or disassemble and re-assemble of system furniture and free-standing furniture. Cove Base shall remain in place. Removal of existing carpet and adhesive, inspect and repair subflooring, install new carpet, and place system furniture and free-standing furniture in original locations. (est. 4,697 Sq. Ft.)
*IAW Attachment 1 Statement of Objective.
Delivery Location: Project work is to be performed on Laughlin AFB, Building 359, located at 583 5th Street Laughlin AFB, Texas 78843.
Please provide the information below:
FOB Destination Shipping Cost Included? Yes No
Payment Terms: Delivery Date:
Company Name: UEI #
Cage Code:
POC: Telephone #
E-Mail Address: Tax ID#:
Warranty Information:
Do you have capacity to invoice electronically through WAWF? (Yes/No)
Carpet Company you have chosen to go with:
| DESCRIPTION: |
| 0001: |
| Carpet Cost FFP Material Cost Only: |
| 1: |
| UNIT PRICELO: |
| TOTAL PRICELO: |
| 0002: |
| Adhesive Cost FFP Material Cost Only: |
| UNIT PRICELO_2: |
| TOTAL PRICELO_2: |
| 0003: |
| 1Building 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective: |
| LOBuilding 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective: |
| UNIT PRICEBuilding 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective: |
| TOTAL PRICEBuilding 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective: |
| Yes: Off |
| Payment Terms: |
| Delivery Date: |
| Company Name: |
| UEI: |
| Cage Code: |
| POC: |
| Telephone: |
| EMail Address: |
| Tax ID: |
| Warranty Information: |
| Do you have capacity to invoice electronically through WAWF YesNo: |
| Carpet Company you have chosen to go with: |
File details come from the government source that posted it. Updated .