Attachment 3 CLIN_Pricing_Schedule.pdf

PDF 155 KB Posted

Attached to
Laughlin AFB Chapel Carpet Replacement Federal contract opportunity
Solicitation number
FA3099-23-Q-1009
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Laughlin AFB Chapel Carpet Replacement, newest first.
File Type Posted
Amendment 02 - Question and Answers Memorandum.pdf PDF
Stair Nosing Image.pdf PDF
Rev 01 Questions and Answers Spreadsheet.xlsx XLSX spreadsheet
Amendment 01 - Statement of Objective Memorandum.pdf PDF
Sign In Sheet.pdf PDF
Amended Attachment 1 Statement of Objective 29Mar23.pdf PDF
Questions and Answers Spreadsheet.xlsx XLSX spreadsheet
Attachment 1 Statement of Objective 10Mar23.pdf PDF
Attachment 5 EAL.pdf PDF
Attachment 4 Wage Determination.pdf PDF
Attachment 2 Measurements and Photos 22 Feb 23.pdf PDF
Combo Synopsis Solicitation.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3 – Contract Line-Item Number / Pricing Schedule

FA3099-23-Q-1009

CONTRACT LINE ITEMS – PRICING SCHEDULE:

CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE

0001 Carpet Cost

FFP

Material Cost Only

1 LO

0002 Adhesive Cost

FFP

Material Cost Only

1 LO

0003 Building 359 Carpet Removal and Installation Services

FFP

The contractor shall provide all necessary labor, equipment, parts and material to lift or disassemble and re-assemble of system furniture and free-standing furniture. Cove Base shall remain in place. Removal of existing carpet and adhesive, inspect and repair subflooring, install new carpet, and place system furniture and free-standing furniture in original locations. (est. 4,697 Sq. Ft.)

*IAW Attachment 1 Statement of Objective.

Delivery Location: Project work is to be performed on Laughlin AFB, Building 359, located at 583 5th Street Laughlin AFB, Texas 78843.

Please provide the information below:

FOB Destination Shipping Cost Included? Yes No

Payment Terms: Delivery Date:

Company Name: UEI #

Cage Code:

POC: Telephone #

E-Mail Address: Tax ID#:

Warranty Information:

Do you have capacity to invoice electronically through WAWF? (Yes/No)

Carpet Company you have chosen to go with:

DESCRIPTION:
0001:
Carpet Cost FFP Material Cost Only:
1:
UNIT PRICELO:
TOTAL PRICELO:
0002:
Adhesive Cost FFP Material Cost Only:
UNIT PRICELO_2:
TOTAL PRICELO_2:
0003:
1Building 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective:
LOBuilding 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective:
UNIT PRICEBuilding 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective:
TOTAL PRICEBuilding 359 Carpet Removal and Installation Services FFP The contractor shall provide all necessary labor equipment parts and material to lift or disassemble and reassemble of system furniture and free standing furniture Cove Base shall remain in place Removal of existing carpet and adhesive inspect and repair subflooring install new carpet and place system furniture and freestanding furniture in original locations est 4697 Sq Ft IAW Attachment 1 Statement of Objective:
Yes: Off
Payment Terms:
Delivery Date:
Company Name:
UEI:
Cage Code:
POC:
Telephone:
EMail Address:
Tax ID:
Warranty Information:
Do you have capacity to invoice electronically through WAWF YesNo:
Carpet Company you have chosen to go with:

File details come from the government source that posted it. Updated .