This document is an Excel template for Calculation of Self-Performed Work related to a Department of Veterans Affairs contract for Storm and Snow Damage Repairs (Solicitation Number: 36C24925B0009). The template requires contractors (NAICS code 238990) to demonstrate that at least 15% of the contract performance costs will be spent on prime contractor employee personnel.

The spreadsheet provides a structured format for bidders to break down personnel and material/equipment costs by specification division, indicating whether each subcontractor is a small business (SB Vendor). Contractors must calculate total personnel costs, subtract subcontractor personnel costs, and show the percentage of work self-performed. The template includes sections for adding home office overhead, profit/fee, and bond costs, with a final grand total calculation. The document requires an authorized representative's signature to certify the accuracy of the submitted information.

View the file

Other files

File Type Posted
36C24925B0009 0002.docx DOCX document
36C24925B0009 0001.docx DOCX document
Attachment 4 General Conditions Breakout.xlsx XLSX spreadsheet
Attachment 2 Pricing Schedule.xlsx XLSX spreadsheet
Attachment 1 Drawings - S-1.pdf PDF
36C24925B0009_1.docx DOCX document
Attachment 6 Request For Information Form.docx DOCX document
Attachment 7 Wage Determination - KY20250093 - Modification 6 - 6-6-25.pdf PDF
Attachment 5 Contractor EMR Certification Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for Contractors (NAICS code 238990) must provide
at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
PrimeY$0.00$0.00Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only.
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
(Add additional lines as necessary for each Division applicable to this project)$$
$ - 0$0.00
$$
Sub Total (Personnel Costs, Material/Equipment Costs)$0.00Add percentage to gray areas only.
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* companies that will perform work
on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to
the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.