ATTACHMENT_3-_BID_SCHEDULE_MILL_CREEK_CAMPGROUND.pdf

PDF 465 KB Posted

Attached to
BLM-CO GFO MILL CREEK CAMPGROUND EXPANSION
Solicitation number
140L1725R0002
Issued by

About this file

This is a Bid Schedule for the Mill Creek Campground Expansion and Improvement project for the Bureau of Land Management's Gunnison Field Office in Colorado. The document details 18 line items for project construction, including mobilization, site preparation, infrastructure, and amenity installation. Key items include 1,600 tons of aggregate base course, 2 precast concrete toilet buildings, 5 steel parking delineators, 32 concrete parking stops, 5 standard and 4 accessible fire rings, 9 picnic tables, tent pads, food storage lockers, campsite identification sign posts, timber stair steps, 45 linear feet of corrugated metal pipe culvert, and bridge deck wearing surface replacement. The bid schedule provides a structured template for contractors to price each specific component of the campground expansion project, with quantities specified for each line item and spaces for unit pricing and total cost calculation.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

Mill Creek Campground Expansion and Improvement

Bureau of Land Management Gunnison Field Office, Colorado

Contract Line Item Number Description Quantity Unit Of Measure Unit Price Price

1 Mobilization and Demobilization 1 Job $

2 Project Stake Out 1 Job $

3 Demolition 1 Job $

4 Clearing and Grubbing 1 Job $

5 Site Grading 1 Job $

6 Aggregate Base Course 1,600 Ton $ $

7 Precast Concrete Toilet Building Single Vault 2 Each $ $

8 Steel Parking Delineator 5 Each $ $

9 Concrete Parking Stop 32 Each $ $

10 Fire Ring 5 Each $ $

11 Accessible Fire Ring 4 Each $ $

12 Picnic Tables 9 Each $ $

13 Tent Pad 9 Each $ $

14 Food Storage Locker 9 Each $ $

15 Sign Posts - Campsite Identification 9 Each $ $

16 Timber Stair Step 10 Each $ $

17 Corrugated Metal Pipe Culvert 45 Liner Foot $ $

18 Bridge Deck Wearing Surface Replacement 1 Job $

Total $

File details come from the government source that posted it. Updated .