B11_PREBID_Q_A_UPDATE_0004.pdf

PDF 201 KB Posted

Attached to
BLM-CO GFO MILL CREEK CAMPGROUND EXPANSION
Solicitation number
140L1725R0002
Issued by

About this file

This document is a Pre-Bid Questions and Answers file for the Mill Creek Campground Improvements project by the Bureau of Land Management (BLM). The pre-bid Q&A addresses critical technical and logistical details for potential contractors, including equipment access, water usage, surveying requirements, sign fabrication, concrete pad preparation, and fence demolition. Key clarifications include: a crane was previously approved to cross the bridge in 2022, contractors cannot drive heavy equipment through the river, water usage permits are managed by the Colorado Division of Water Resources, and concrete pads for food storage lockers can be pre-cast off-site with specific reinforcement requirements. The project involves campground expansion and improvements in Hinsdale County, Colorado, located 13.6 miles south of Lake City, with work to be completed within 365 days of the Notice to Proceed.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior Bureau of Land Management

Mill Creek Campground Improvements Pre-Bid Questions https://sam.gov/ Notice ID: 140L1725R0002 Title: Y--BLM-CO GFO MILL CREEK CAMPGROUND EXPANSION

Q: Has a crane been approved to cross the bridge in the past?

A: Yes. In 2022, a crane was approved to install a larger (double vault) CXT toilet in the existing campground. 3 of the 4 crane configurations (see attached) were approved. The CXT toilet required in this project is smaller (single vault) than the one installed in 2022.

Q: Can the contractor drive the crane and other heavy equipment through the river instead of crossing the bridge?

A: No.

Q: Can the contractor obtain construction water from the river?

A: The US Bureau of Land Management does not regulate water use. Permission (Permits) to use water from the river falls under the authority of the State of Colorado - Division of Water Resources.

Q: Is a licensed professional surveyor required to stake out the project?

A: No. Clarification: Someone competent in surveying is required to stake out the project as required by section 02 20 00 SURVEY AND PROJECT STAKEOUT.

Q: Can you tell me if the nine signs needed (SIGN POSTS - CAMPSITE IDENTIFICATION) will need to be fabricated? Or are those fabricated by your team? These would be the camp identification sings that will be mounted to each site’s campsite.

A: See Section 12 93 00, paragraph 2.8 SIGN POSTS – CAMPSITE IDENTIFICATION.

Q: Can the concrete pads for the food storage lockers be pre-cast off site?

A: Yes. However, additional reinforcement (#3 rebar at 6 inches each way) and concrete thickness (8 inch continuous) will be required. Additionally, photographic documentation of the forms and reinforcement will be required. The slab must be placed on site without damage.

Q: Was the fence remove and replace?

A: The fence shall be demolished in accordance with the drawings and specifications. The fence is not being replaced.