This document is a Bid Schedule for the 18 Road Campground Improvements, Phase 3 project, which is part of a federal contract opportunity solicited by the Bureau of Land Management (BLM) in Colorado.

The Bid Schedule outlines the various line items and quantities for the project, including site work, road and parking area construction, a precast concrete toilet building, a gazebo, culverts, and other campsite amenities. The project has a period of performance from July 15 to December 31, 2024, and a rough order of magnitude cost estimate of $250,000 to $500,000. The contract is a firm-fixed price, with the award based on the lowest price technically acceptable bid. The solicitation is a Total Small Business Set-Aside under NAICS code 237990, with a size standard of $45 million. Key requirements for a responsive bid include a completed and signed SF1442 form, a filled-in Schedule B with prices, a 20% bid bond, and a technical response per the solicitation's instructions.

View the file

Other files

File Type Posted
Sol_140L1724Q0012_Amd_0002.pdf PDF
Sol_140L1724Q0012_Amd_0001.pdf PDF
Attachment_2_-_Specifications.pdf PDF
Sol_140L1724Q0012.pdf PDF
Attachment_4_-_Wage_Determination.pdf PDF
Attachment_1_-_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule - 18 Road Phase 3

18 Road Campground Improvements, Phase 3 Bureau of Land Management Grand Junction Field Office, Colorado

Contract Line Item Number Description Quantity Unit Of Measure Unit Price Price

1 Mobilization and Demobilization 1 Job $

2 Project Stakeout 1 Job $

3 Demolition 1 Job $

4 Clearing and Grubbing 1 Job $

5 Site Grading 1 Job $

6 Precast Concrete Toilet Building 1 Each $

7 Aggregate Base Course 3,800 Tons $ $

8 Concrete Parking Stops 4 Each $ $

9 Fire Ring 13 Each $ $

10 Accessible Fire Ring 10 Each $ $

11 Picnic Tables 23 Each $ $

12 Sign Posts - Campsite Identification 23 Each $ $

13 Gazebo 1 Each $

14 Currugated Metal Pipe Culvert 260 Linear Feet $ $

15 Seeding 1 Job $

Total $