ATTACHMENT 3 - Base Contract AF 3052 Painting IDIQ Contractor Cost Estimate.xlsx
XLSX spreadsheet 44 KB Posted
- Solicitation number
- FA330024R0024
About this file
This document appears to be an attachment titled "Base Contract AF 3052 Painting IDIQ Contractor Cost Estimate" that provides a detailed cost breakdown for a 5-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract for painting services at Maxwell AFB and Gunter Annex. The document includes line items for various interior and exterior painting tasks with associated material, labor, and other direct costs. The total proposed contract price is listed as $0.00 for each year.
The related federal contract opportunity is a competitive Total Woman-Owned Small Business Set-Aside for the "Painting IDIQ Maxwell AFB and Gunter Annex" requirement. Key details include a site visit scheduled for June 6, 2024, a question submission deadline of June 13, 2024, and a proposal due date of June 24, 2024 at 12:00 PM CDT. The contract will be a firm-fixed-price IDIQ with a high probability of adequate price competition.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR DATE ADDRESS
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Painting IDIQ - Year 1 | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Maxwell | ||||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MH | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | ||||||||
| DIVISION 9 (FINISHES) | $0.00 | $0.00 | ||||||
| $0.00 | ||||||||
| Lead Base Paint removal, Interior | SF | $0.00 | $0.00 | $0.00 | ||||
| Patch walls, Interior | Lot | $0.00 | $0.00 | $0.00 | ||||
| Prepare Walls, Interior | SF | $0.00 | $0.00 | $0.00 | ||||
| Prime Walls (per coat), Interior | SF | $0.00 | $0.00 | $0.00 | ||||
| Paint walls (per coat), Interior | SF | $0.00 | $0.00 | $0.00 | ||||
| Move furniture, Interior | Lot | $0.00 | $0.00 | $0.00 | ||||
| Paint Trim, Interior | LF | $0.00 | $0.00 | $0.00 | ||||
| Paint Door, Interior | EA | $0.00 | $0.00 | $0.00 | ||||
| Refinish Door, Interior | EA | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | ||||||||
| Lead Base Paint removal, Exterior | SF | $0.00 | $0.00 | $0.00 | ||||
| Patch surfaces, Exterior | Lot | $0.00 | $0.00 | $0.00 | ||||
| Prepare surfaces, Exterior | SF | $0.00 | $0.00 | $0.00 | ||||
| Prime surfaces (per coat), Exterior | SF | $0.00 | $0.00 | $0.00 | ||||
| Paint surfaces (per coat), Exterior | SF | $0.00 | $0.00 | $0.00 | ||||
| Pressure wash surfaces, Exterior | SF | $0.00 | $0.00 | $0.00 | ||||
| Paint Trim, Exterior | LF | $0.00 | $0.00 | $0.00 | ||||
| Paint Door, Exterior | EA | $0.00 | $0.00 | $0.00 | ||||
| Refinish Door, Exterior | EA | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |||
| Material Costs | $0.00 | $0.00 | |||
| Tax on Materials | 10% | $0.00 | $0.00 | ||
| TOTAL MATERIAL COST | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| Labor Cost | $0.00 | $0.00 | |||
| Insurance & Tax on Labor | 20% | $0.00 | $0.00 | ||
| TOTAL LABOR COST | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | ||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 10% | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | 10% | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | 2.5% | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | |||||
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. |
Signature: ______________________________________
Year 2
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR DATE ADDRESS
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Painting IDIQ - Year 2 | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Maxwell | ||||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MH | $0.00 | $0.00 | $0.00 |
DIVISION 9 (FINISHES)
| Lead Base Paint removal, Interior | SF | $0.00 | $0.00 | $0.00 |
| Patch walls, Interior | Lot | $0.00 | $0.00 | $0.00 |
| Prepare Walls, Interior | SF | $0.00 | $0.00 | $0.00 |
| Prime Walls (per coat), Interior | SF | $0.00 | $0.00 | $0.00 |
| Paint walls (per coat), Interior | SF | $0.00 | $0.00 | $0.00 |
| Move furniture, Interior | Lot | $0.00 | $0.00 | $0.00 |
| Paint Trim, Interior | LF | $0.00 | $0.00 | $0.00 |
| Paint Door, Interior | EA | $0.00 | $0.00 | $0.00 |
| Refinish Door, Interior | EA | $0.00 | $0.00 | $0.00 |
| Lead Base Paint removal, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Patch surfaces, Exterior | Lot | $0.00 | $0.00 | $0.00 |
| Prepare surfaces, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Prime surfaces (per coat), Exterior | SF | $0.00 | $0.00 | $0.00 |
| Paint surfaces (per coat), Exterior | SF | $0.00 | $0.00 | $0.00 |
| Pressure wash surfaces, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Paint Trim, Exterior | LF | $0.00 | $0.00 | $0.00 |
| Paint Door, Exterior | EA | $0.00 | $0.00 | $0.00 |
| Refinish Door, Exterior | EA | $0.00 | $0.00 | $0.00 |
| TOTAL | $0.00 | $0.00 | $0.00 | |
| ERROR:#VALUE! | ||||
| Material Costs | $0.00 | |||
| Tax on Materials | 10% | $0.00 | ||
| TOTAL MATERIAL COST | $0.00 | |||
| $0.00 | ||||
| Labor Cost | $0.00 | |||
| Insurance & Tax on Labor | 20% | $0.00 | ||
| TOTAL LABOR COST | $0.00 | |||
| $0.00 | ||||
| Total Other Direct Costs | $0.00 | |||
| Total Material, Labor, Tax & Insurance | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | |
| ERROR:#VALUE! | ||
| Overhead | 10% | $0.00 |
| Subtotal | $0.00 | |
| Profit | 10% | $0.00 |
| Sub Total | $0.00 | |
| TOTAL | $0.00 | |
| Bonds | 2.5% | $0.00 |
| TOTAL | $0.00 |
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
Signature: ______________________________________
Year 3
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR DATE ADDRESS
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Painting IDIQ - Year 3 | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Maxwell | ||||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MH | $0.00 | $0.00 | $0.00 |
DIVISION 9 (FINISHES)
| Lead Base Paint removal, Interior | SF | $0.00 | $0.00 | $0.00 |
| Patch walls, Interior | Lot | $0.00 | $0.00 | $0.00 |
| Prepare Walls, Interior | SF | $0.00 | $0.00 | $0.00 |
| Prime Walls (per coat), Interior | SF | $0.00 | $0.00 | $0.00 |
| Paint walls (per coat), Interior | SF | $0.00 | $0.00 | $0.00 |
| Move furniture, Interior | Lot | $0.00 | $0.00 | $0.00 |
| Paint Trim, Interior | LF | $0.00 | $0.00 | $0.00 |
| Paint Door, Interior | EA | $0.00 | $0.00 | $0.00 |
| Refinish Door, Interior | EA | $0.00 | $0.00 | $0.00 |
| Lead Base Paint removal, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Patch surfaces, Exterior | Lot | $0.00 | $0.00 | $0.00 |
| Prepare surfaces, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Prime surfaces (per coat), Exterior | SF | $0.00 | $0.00 | $0.00 |
| Paint surfaces (per coat), Exterior | SF | $0.00 | $0.00 | $0.00 |
| Pressure wash surfaces, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Paint Trim, Exterior | LF | $0.00 | $0.00 | $0.00 |
| Paint Door, Exterior | EA | $0.00 | $0.00 | $0.00 |
| Refinish Door, Exterior | EA | $0.00 | $0.00 | $0.00 |
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | |||||
| Material Costs | $0.00 | ||||
| Tax on Materials | 10% | $0.00 | |||
| TOTAL MATERIAL COST | $0.00 | ||||
| $0.00 | |||||
| Labor Cost | $0.00 | ||||
| Insurance & Tax on Labor | 20% | $0.00 | |||
| TOTAL LABOR COST | $0.00 | ||||
| $0.00 | |||||
| Total Other Direct Costs | $0.00 | ||||
| Total Material, Labor, Tax & Insurance | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | |
| $0.00 | ||
| Overhead | 10% | $0.00 |
| Subtotal | $0.00 | |
| Profit | 10% | $0.00 |
| Sub Total | $0.00 | |
| TOTAL | $0.00 | |
| Bonds | 2.5% | $0.00 |
| TOTAL | $0.00 |
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
Signature: ______________________________________
Year 4
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR DATE ADDRESS
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Painting IDIQ - Year 4 | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Maxwell | ||||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MH | $0.00 | $0.00 | $0.00 |
DIVISION 9 (FINISHES)
| Lead Base Paint removal, Interior | SF | $0.00 | $0.00 | $0.00 |
| Patch walls, Interior | Lot | $0.00 | $0.00 | $0.00 |
| Prepare Walls, Interior | SF | $0.00 | $0.00 | $0.00 |
| Prime Walls (per coat), Interior | SF | $0.00 | $0.00 | $0.00 |
| Paint walls (per coat), Interior | SF | $0.00 | $0.00 | $0.00 |
| Move furniture, Interior | Lot | $0.00 | $0.00 | $0.00 |
| Paint Trim, Interior | LF | $0.00 | $0.00 | $0.00 |
| Paint Door, Interior | EA | $0.00 | $0.00 | $0.00 |
| Refinish Door, Interior | EA | $0.00 | $0.00 | $0.00 |
| Lead Base Paint removal, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Patch surfaces, Exterior | Lot | $0.00 | $0.00 | $0.00 |
| Prepare surfaces, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Prime surfaces (per coat), Exterior | SF | $0.00 | $0.00 | $0.00 |
| Paint surfaces (per coat), Exterior | SF | $0.00 | $0.00 | $0.00 |
| Pressure wash surfaces, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Paint Trim, Exterior | LF | $0.00 | $0.00 | $0.00 |
| Paint Door, Exterior | EA | $0.00 | $0.00 | $0.00 |
| Refinish Door, Exterior | EA | $0.00 | $0.00 | $0.00 |
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | |||||
| Material Costs | $0.00 | ||||
| Tax on Materials | 10% | $0.00 | |||
| TOTAL MATERIAL COST | $0.00 | ||||
| $0.00 | |||||
| Labor Cost | $0.00 | ||||
| Insurance & Tax on Labor | 20% | $0.00 | |||
| TOTAL LABOR COST | $0.00 | ||||
| $0.00 | |||||
| Total Other Direct Costs | $0.00 | ||||
| Total Material, Labor, Tax & Insurance | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | |
| $0.00 | ||
| Overhead | 10% | $0.00 |
| Subtotal | $0.00 | |
| Profit | 10% | $0.00 |
| Sub Total | $0.00 | |
| TOTAL | $0.00 | |
| Bonds | 2.5% | $0.00 |
| TOTAL | $0.00 |
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
Signature: ______________________________________
Year 5
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR DATE ADDRESS
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Painting IDIQ - Year 5 | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Maxwell | ||||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MH | $0.00 | $0.00 | $0.00 |
DIVISION 9 (FINISHES)
| Lead Base Paint removal, Interior | SF | $0.00 | $0.00 | $0.00 |
| Patch walls, Interior | Lot | $0.00 | $0.00 | $0.00 |
| Prepare Walls, Interior | SF | $0.00 | $0.00 | $0.00 |
| Prime Walls (per coat), Interior | SF | $0.00 | $0.00 | $0.00 |
| Paint walls (per coat), Interior | SF | $0.00 | $0.00 | $0.00 |
| Move furniture, Interior | Lot | $0.00 | $0.00 | $0.00 |
| Paint Trim, Interior | LF | $0.00 | $0.00 | $0.00 |
| Paint Door, Interior | EA | $0.00 | $0.00 | $0.00 |
| Refinish Door, Interior | EA | $0.00 | $0.00 | $0.00 |
| Lead Base Paint removal, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Patch surfaces, Exterior | Lot | $0.00 | $0.00 | $0.00 |
| Prepare surfaces, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Prime surfaces (per coat), Exterior | SF | $0.00 | $0.00 | $0.00 |
| Paint surfaces (per coat), Exterior | SF | $0.00 | $0.00 | $0.00 |
| Pressure wash surfaces, Exterior | SF | $0.00 | $0.00 | $0.00 |
| Paint Trim, Exterior | LF | $0.00 | $0.00 | $0.00 |
| Paint Door, Exterior | EA | $0.00 | $0.00 | $0.00 |
| Refinish Door, Exterior | EA | $0.00 | $0.00 | $0.00 |
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | |||||
| Material Costs | $0.00 | ||||
| Tax on Materials | 10% | $0.00 | |||
| TOTAL MATERIAL COST | $0.00 | ||||
| $0.00 | |||||
| Labor Cost | $0.00 | ||||
| Insurance & Tax on Labor | 20% | $0.00 | |||
| TOTAL LABOR COST | $0.00 | ||||
| $0.00 | |||||
| Total Other Direct Costs | $0.00 | ||||
| Total Material, Labor, Tax & Insurance | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | |
| $0.00 | ||
| Overhead | 10% | $0.00 |
| Subtotal | $0.00 | |
| Profit | 10% | $0.00 |
| Sub Total | $0.00 | |
| TOTAL | $0.00 | |
| Bonds | 2.5% | $0.00 |
| TOTAL | $0.00 |
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
Signature: ______________________________________
File details come from the government source that posted it. Updated .