ATTACHMENT 3 - Base Contract AF 3052 Painting IDIQ Contractor Cost Estimate.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
Painting IDIQ Maxwell AFB and Gunter Annex-AMENDMENT 4
Solicitation number
FA330024R0024
Issued by

About this file

This document appears to be an attachment titled "Base Contract AF 3052 Painting IDIQ Contractor Cost Estimate" that provides a detailed cost breakdown for a 5-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract for painting services at Maxwell AFB and Gunter Annex. The document includes line items for various interior and exterior painting tasks with associated material, labor, and other direct costs. The total proposed contract price is listed as $0.00 for each year.

The related federal contract opportunity is a competitive Total Woman-Owned Small Business Set-Aside for the "Painting IDIQ Maxwell AFB and Gunter Annex" requirement. Key details include a site visit scheduled for June 6, 2024, a question submission deadline of June 13, 2024, and a proposal due date of June 24, 2024 at 12:00 PM CDT. The contract will be a firm-fixed-price IDIQ with a high probability of adequate price competition.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR DATE ADDRESS

CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Painting IDIQ - Year 1$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
Maxwell
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Project ManagerMH$0.00$0.00$0.00
$0.00
DIVISION 9 (FINISHES)$0.00$0.00
$0.00
Lead Base Paint removal, InteriorSF$0.00$0.00$0.00
Patch walls, InteriorLot$0.00$0.00$0.00
Prepare Walls, InteriorSF$0.00$0.00$0.00
Prime Walls (per coat), InteriorSF$0.00$0.00$0.00
Paint walls (per coat), InteriorSF$0.00$0.00$0.00
Move furniture, InteriorLot$0.00$0.00$0.00
Paint Trim, InteriorLF$0.00$0.00$0.00
Paint Door, InteriorEA$0.00$0.00$0.00
Refinish Door, InteriorEA$0.00$0.00$0.00
$0.00
Lead Base Paint removal, ExteriorSF$0.00$0.00$0.00
Patch surfaces, ExteriorLot$0.00$0.00$0.00
Prepare surfaces, ExteriorSF$0.00$0.00$0.00
Prime surfaces (per coat), ExteriorSF$0.00$0.00$0.00
Paint surfaces (per coat), ExteriorSF$0.00$0.00$0.00
Pressure wash surfaces, ExteriorSF$0.00$0.00$0.00
Paint Trim, ExteriorLF$0.00$0.00$0.00
Paint Door, ExteriorEA$0.00$0.00$0.00
Refinish Door, ExteriorEA$0.00$0.00$0.00
$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor20%$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead10%$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit10%$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds2.5%$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00
I acknowledge the above cost estimate has been estimated to the best of my ability and means.

Signature: ______________________________________

Year 2

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR DATE ADDRESS

CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Painting IDIQ - Year 2$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
Maxwell
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Project ManagerMH$0.00$0.00$0.00

DIVISION 9 (FINISHES)

Lead Base Paint removal, InteriorSF$0.00$0.00$0.00
Patch walls, InteriorLot$0.00$0.00$0.00
Prepare Walls, InteriorSF$0.00$0.00$0.00
Prime Walls (per coat), InteriorSF$0.00$0.00$0.00
Paint walls (per coat), InteriorSF$0.00$0.00$0.00
Move furniture, InteriorLot$0.00$0.00$0.00
Paint Trim, InteriorLF$0.00$0.00$0.00
Paint Door, InteriorEA$0.00$0.00$0.00
Refinish Door, InteriorEA$0.00$0.00$0.00
Lead Base Paint removal, ExteriorSF$0.00$0.00$0.00
Patch surfaces, ExteriorLot$0.00$0.00$0.00
Prepare surfaces, ExteriorSF$0.00$0.00$0.00
Prime surfaces (per coat), ExteriorSF$0.00$0.00$0.00
Paint surfaces (per coat), ExteriorSF$0.00$0.00$0.00
Pressure wash surfaces, ExteriorSF$0.00$0.00$0.00
Paint Trim, ExteriorLF$0.00$0.00$0.00
Paint Door, ExteriorEA$0.00$0.00$0.00
Refinish Door, ExteriorEA$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00
ERROR:#VALUE!
Material Costs$0.00
Tax on Materials10%$0.00
TOTAL MATERIAL COST$0.00
$0.00
Labor Cost$0.00
Insurance & Tax on Labor20%$0.00
TOTAL LABOR COST$0.00
$0.00
Total Other Direct Costs$0.00
Total Material, Labor, Tax & Insurance$0.00
TOTAL DIRECT COSTS$0.00
ERROR:#VALUE!
Overhead10%$0.00
Subtotal$0.00
Profit10%$0.00
Sub Total$0.00
TOTAL$0.00
Bonds2.5%$0.00
TOTAL$0.00

I acknowledge the above cost estimate has been estimated to the best of my ability and means.

Signature: ______________________________________

Year 3

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR DATE ADDRESS

CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Painting IDIQ - Year 3$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
Maxwell
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Project ManagerMH$0.00$0.00$0.00

DIVISION 9 (FINISHES)

Lead Base Paint removal, InteriorSF$0.00$0.00$0.00
Patch walls, InteriorLot$0.00$0.00$0.00
Prepare Walls, InteriorSF$0.00$0.00$0.00
Prime Walls (per coat), InteriorSF$0.00$0.00$0.00
Paint walls (per coat), InteriorSF$0.00$0.00$0.00
Move furniture, InteriorLot$0.00$0.00$0.00
Paint Trim, InteriorLF$0.00$0.00$0.00
Paint Door, InteriorEA$0.00$0.00$0.00
Refinish Door, InteriorEA$0.00$0.00$0.00
Lead Base Paint removal, ExteriorSF$0.00$0.00$0.00
Patch surfaces, ExteriorLot$0.00$0.00$0.00
Prepare surfaces, ExteriorSF$0.00$0.00$0.00
Prime surfaces (per coat), ExteriorSF$0.00$0.00$0.00
Paint surfaces (per coat), ExteriorSF$0.00$0.00$0.00
Pressure wash surfaces, ExteriorSF$0.00$0.00$0.00
Paint Trim, ExteriorLF$0.00$0.00$0.00
Paint Door, ExteriorEA$0.00$0.00$0.00
Refinish Door, ExteriorEA$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00
Material Costs$0.00
Tax on Materials10%$0.00
TOTAL MATERIAL COST$0.00
$0.00
Labor Cost$0.00
Insurance & Tax on Labor20%$0.00
TOTAL LABOR COST$0.00
$0.00
Total Other Direct Costs$0.00
Total Material, Labor, Tax & Insurance$0.00
TOTAL DIRECT COSTS$0.00
$0.00
Overhead10%$0.00
Subtotal$0.00
Profit10%$0.00
Sub Total$0.00
TOTAL$0.00
Bonds2.5%$0.00
TOTAL$0.00

I acknowledge the above cost estimate has been estimated to the best of my ability and means.

Signature: ______________________________________

Year 4

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR DATE ADDRESS

CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Painting IDIQ - Year 4$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
Maxwell
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Project ManagerMH$0.00$0.00$0.00

DIVISION 9 (FINISHES)

Lead Base Paint removal, InteriorSF$0.00$0.00$0.00
Patch walls, InteriorLot$0.00$0.00$0.00
Prepare Walls, InteriorSF$0.00$0.00$0.00
Prime Walls (per coat), InteriorSF$0.00$0.00$0.00
Paint walls (per coat), InteriorSF$0.00$0.00$0.00
Move furniture, InteriorLot$0.00$0.00$0.00
Paint Trim, InteriorLF$0.00$0.00$0.00
Paint Door, InteriorEA$0.00$0.00$0.00
Refinish Door, InteriorEA$0.00$0.00$0.00
Lead Base Paint removal, ExteriorSF$0.00$0.00$0.00
Patch surfaces, ExteriorLot$0.00$0.00$0.00
Prepare surfaces, ExteriorSF$0.00$0.00$0.00
Prime surfaces (per coat), ExteriorSF$0.00$0.00$0.00
Paint surfaces (per coat), ExteriorSF$0.00$0.00$0.00
Pressure wash surfaces, ExteriorSF$0.00$0.00$0.00
Paint Trim, ExteriorLF$0.00$0.00$0.00
Paint Door, ExteriorEA$0.00$0.00$0.00
Refinish Door, ExteriorEA$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00
Material Costs$0.00
Tax on Materials10%$0.00
TOTAL MATERIAL COST$0.00
$0.00
Labor Cost$0.00
Insurance & Tax on Labor20%$0.00
TOTAL LABOR COST$0.00
$0.00
Total Other Direct Costs$0.00
Total Material, Labor, Tax & Insurance$0.00
TOTAL DIRECT COSTS$0.00
$0.00
Overhead10%$0.00
Subtotal$0.00
Profit10%$0.00
Sub Total$0.00
TOTAL$0.00
Bonds2.5%$0.00
TOTAL$0.00

I acknowledge the above cost estimate has been estimated to the best of my ability and means.

Signature: ______________________________________

Year 5

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR DATE ADDRESS

CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Painting IDIQ - Year 5$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
Maxwell
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Project ManagerMH$0.00$0.00$0.00

DIVISION 9 (FINISHES)

Lead Base Paint removal, InteriorSF$0.00$0.00$0.00
Patch walls, InteriorLot$0.00$0.00$0.00
Prepare Walls, InteriorSF$0.00$0.00$0.00
Prime Walls (per coat), InteriorSF$0.00$0.00$0.00
Paint walls (per coat), InteriorSF$0.00$0.00$0.00
Move furniture, InteriorLot$0.00$0.00$0.00
Paint Trim, InteriorLF$0.00$0.00$0.00
Paint Door, InteriorEA$0.00$0.00$0.00
Refinish Door, InteriorEA$0.00$0.00$0.00
Lead Base Paint removal, ExteriorSF$0.00$0.00$0.00
Patch surfaces, ExteriorLot$0.00$0.00$0.00
Prepare surfaces, ExteriorSF$0.00$0.00$0.00
Prime surfaces (per coat), ExteriorSF$0.00$0.00$0.00
Paint surfaces (per coat), ExteriorSF$0.00$0.00$0.00
Pressure wash surfaces, ExteriorSF$0.00$0.00$0.00
Paint Trim, ExteriorLF$0.00$0.00$0.00
Paint Door, ExteriorEA$0.00$0.00$0.00
Refinish Door, ExteriorEA$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00
Material Costs$0.00
Tax on Materials10%$0.00
TOTAL MATERIAL COST$0.00
$0.00
Labor Cost$0.00
Insurance & Tax on Labor20%$0.00
TOTAL LABOR COST$0.00
$0.00
Total Other Direct Costs$0.00
Total Material, Labor, Tax & Insurance$0.00
TOTAL DIRECT COSTS$0.00
$0.00
Overhead10%$0.00
Subtotal$0.00
Profit10%$0.00
Sub Total$0.00
TOTAL$0.00
Bonds2.5%$0.00
TOTAL$0.00

I acknowledge the above cost estimate has been estimated to the best of my ability and means.

Signature: ______________________________________